HVAC
The mechanical contractor must provide all labor, materials, equipment, supervision, layout, demolition, installation, connections, testing, start-up, and coordination necessary for complete and operational mechanical systems in accordance with the Mechanical Narrative (THA# 26-280, dated November 17, 2026), associated mechanical drawings and schedules, applicable codes, and owner and construction manager requirements. Work includes design assist with THA, removal of existing classroom unit ventilators and installation of new units, removal of existing rooftop air-handling units with hoisting and disposal, installation of new rooftop condensing units and new air-handling equipment with hoisting and lifting, provision of new line sets with manufacturer covers, building controls complete including the HVAC Building Controls Allowance, new ductwork with required testing and balancing, cutting and coring for mechanical contractor's work, and equipment submittals, product data, installation information, coordination drawings, testing, start-up, adjustment, warranties, operation and maintenance information, and closeout documentation. Electrical power disconnects/reconnects, roof patching, painting, flooring, and architectural finishes are excluded.
We post new hvac opportunities in Michigan as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Michigan work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Michigan SIGMA VSS (solicitation RFP-GENE-270000000393-1), retrieved via the Michigan SIGMA Vendor Self Service portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.