Turf Field replacement
The contractor is responsible for an all-inclusive, turnkey scope including removal and lawful disposal of all existing turf material, providing 3rd party infiltration testing of the exposed stone base, visually inspecting the existing stone base and adding finishing stone as needed, furnishing and installing new turf materials in accordance with manufacturer's warranty requirements, providing a track bridge to protect the track and surrounding surface, installing field markings including district logo, end zone letters, USA Flag logos, football lines, and soccer lines, supplying and installing turf system infill materials (ambient processed SBR and silica sand), performing one satisfactory GMAX test upon completion, and providing a minimum 8 year third party warranty. The contractor must also include a mandatory alternate for a performance shock pad. All work must be completed by July 28, 2027.
We post new general contractors opportunities in Michigan as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Michigan work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Michigan SIGMA VSS (solicitation RFP-CLS-260000002628-2), retrieved via the Michigan SIGMA Vendor Self Service portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.