491/26585.KMM; CFP-Critical Maint Emer/Primary Power
The selected professional services contractor (PSC) will provide Phase 100 (Study), Phase 400 (Preliminary Design), Phase 500 (Final Design), Phase 600 (Construction Administration – Office Services), and Phase 700 (Construction Administration – Field Services) for the project. The scope includes performing a Short Circuit/Equipment Evaluation, Time Current Coordination Study, and Arc Flash Analysis Study; modifying the existing main switchgear SWBD H1HB to include IR windows; providing manufacturers' recommended maintenance on SWBD H1HB; and replacing existing automatic transfer switches EQATS-5, CRATS-2, LSATS-2, and EQATS-2 as necessary. The PSC will also print and apply NFPA 70E compliant arc-flash hazard warning labels, conduct field data collection with a licensed electrician, prepare design submittals at 50% and 90% milestones with cost estimates, and provide construction administration services including participation in contractor bidding and selection.
We post new electrical opportunities in Michigan as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Michigan SIGMA VSS (solicitation RFP-171-270000000293-1), retrieved via the Michigan SIGMA Vendor Self Service portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.