761/26157.JBB; Wells SP-Beach House Septic Sys Upgrades
The project includes Phase 100 (system study): review of the existing system documenting deficiencies including piping, pumps, tanks and drainfield; confirmation of the location of the current septic field and estimated remaining life span; recommendation for continued use or a new septic field location with piping and controls; and any other appropriate option. Phase 500 (final design and development of contract documents for bidding): final development of the selected option into bidding documents using DC Spec General Conditions and Master Spec format; provision of construction estimates at 50%, 90%, and 100%; and posting the project on SIGMA for bid advertisement, performing a pre-bid meeting, issuing addenda, and generating recommendations for contract award. Phases 600 and 700 (construction administration): managing pre-construction and progress meetings, conducting on-site inspections on a once-per-every-two-week basis, and coordinating with testing companies.
We post new waste management opportunities in Michigan as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Michigan SIGMA VSS (solicitation RFP-171-270000000161-2), retrieved via the Michigan SIGMA Vendor Self Service portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.