The Work includes furnishing all labor, materials, equipment, tools, and incidentals necessary to provide complete and functional electrical system installations to support electric vehicle (EV) charging infrastructure in a maritime setting. Work includes, but not limited to installation of raceways, conduit systems and wiring. Installation of medium-voltage cabling, junction boxes, transformers, grounding systems, and miscellaneous electrical devices.
Installation of EV charging equipment, mounting hardware, protective enclosures, and associated infrastructure suitable for marine environments. Provision of temporary power and lighting as required to support construction activities. Testing, commissioning, and verification of all electrical and EV charging systems in compliance with applicable codes, standards, and requirements of all authority‑having‑jurisdiction (AHJ) agencies.
Contractor's electricians must be able to report with in a 2-hour period and provide combination of (2) two employees on a continuous 24-hour period and at multiple locations on the same day. Contractor should expect multiple Work Authorizations that overlap requiring adequate staffing levels.
The Work includes furnishing all labor, materials, equipment, tools, and incidentals necessary to provide complete and functional electrical system installations to support electric vehicle (EV) charging infrastructure in a maritime setting. Work includes, but not limited to installation of raceways, conduit systems and wiring. Installation of medium-voltage cabling, junction boxes, transformers, grounding systems, and miscellaneous electrical devices. Installation of EV charging equipment, mounting hardware, protective enclosures, and associated infrastructure suitable for marine environments. Provision of temporary power and lighting as required to support construction activities. Testing, commissioning, and verification of all electrical and EV charging systems in compliance with applicable codes, standards, and requirements of all authority‑having‑jurisdiction (AHJ) agencies.
We post new electrical opportunities in Washington as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Washington work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Port of Seattle — Port Construction Services (solicitation 6787240e-7bd1-f111-bd4e-005056aa9c71), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.