Airfield Recircuiting – replace airfield lighting circuits with low megger readings; install LED lighting fixtures and signs Airfield Pavement and Utility Replacement – replace failing pavement and critical utilities Wildlife Hazard Management – remove turf edge dams along runways, taxiways and access roads; install anti-perching devices on airfield signs; mitigate ponding by regrading and installing storm drainage infrastructure Fire Hydrant Access Hatches Replacement – replace failing flush fire hydrant access hatches
Work includes replacing airfield lighting circuits with low megger readings and installing LED lighting fixtures and signs; replacing failing airfield pavement and critical utilities; removing turf edge dams along runways, taxiways and access roads and installing anti-perching devices on airfield signs while mitigating ponding through regrading and storm drainage infrastructure; and replacing failing flush fire hydrant access hatches.
We post new asphalt opportunities in Washington as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Washington work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Port of Seattle — Aviation Project Management Group (solicitation 41269da1-9550-f111-bd3c-005056aa9c71), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.