- South Dakota Department of Transportation - Bid Letting Information SDEBS Lettings Regional Lettings Bidding Information NEW Electronic Bidding Contractor Information Bid Letting Staff Error Message An error has occurred on the page you requested. Please contact the bid letting office at 605-773-3275 to report this error. Bid Letting Home Bid Letting Log In
- Pdf Text
- 5
DEPARTMENT OF TRANSPORTATION
NOTICE TO CONTRACTORS,
PROPOSAL, SPECIAL PROVISIONS,
CONTRACT AND CONTRACT BOND
FOR
STRUCTURE CLEANING
STATE PROJECT NO. IM 0020(00)
(PCN 0A5E)
INTERSTATE HIGHWAY 90
IN BRULE COUNTYDecember 9, 2026
DEPARTMENT OF
TRANSPORTATION
NOTICE TO ALL BIDDERS
TO REPORT BID RIGGING ACTIVITIES, CALL: 1-800-424-9071
THE U.S. DEPARTMENT OF TRANSPORTATION (DOT) OPERATES THE ABOVE TOLL-
FREE “HOTLINE” MONDAY THROUGH FRIDAY, 8:00 A.M. TO 5:00 P.M., EASTERN TIME.
ANYONE WITH KNOWLEDGE OF POSSIBLE BID RIGGING, BIDDER COLLUSION, OR
OTHER FRAUDULENT ACTIVITIES SHOULD USE THE “HOTLINE” TO REPORT SUCH
ACTIVITIES.
THE “HOTLINE” IS PART OF THE DOT’S CONTINUING EFFORT TO IDENTIFY AND
INVESTIGATE HIGHWAY CONSTRUCTION CONTRACT FRAUD AND ABUSE AND IS
OPERATED UNDER THE DIRECTION OF THE DOT INSPECTOR GENERAL.
ALL INFORMATION WILL BE TREATED CONFIDENTIALLY AND CALLER ANONYMITY WILL
BE RESPECTED.
* * * *
PLANS, PROPOSALS AND ADDENDA
AFTER AWARD OF CONTRACT, THE LOW BIDDER WILL RECEIVE TEN (10)
COMPLIMENTARY SETS OF PLANS, PROPOSALS, PROJECT Q & A FORUM, AND
ADDENDA FOR FIELD AND OFFICE USE. AN ELECTRONIC COPY WILL ALSO BE
PROVIDED. ANY ADDITIONAL COPIES REQUIRED WILL BE THE RESPONSIBILITY OF THE
CONTRACTOR.
* * * *
Project Number: IM 0020(00) Revised 10/8/25
PCN 0A5E
NOTICE TO CONTRACTORS
Bid proposals for this project will be prepared, transmitted, and received electronically by the
South Dakota Department of Transportation (SDDOT) via the South Dakota Electronic Bid
System until 10 A.M. Central time, on December 9, 2026, at which time the SDDOT will open
bids. All bids will be checked for qualifications with results posted on the SDDOT website. The
South Dakota Transportation Commission will consider all bids at a scheduled Commission
meeting.
The work for which proposals are hereby requested is to be completed within the following
requirement(s):
FIELD WORK COMPLETION: October 29, 2027
The project category is Category I
The project type is Structural
The geographic zone is Zone 5
THE DBE GOAL FOR THIS PROJECT IS: N/A
WORK TYPE FOR THIS PROJECT IS: Work Type 8 or Work Type 13 or Work Type 15
Bidding package for the work may be obtained at:
http://apps.sd.gov/hc65bidletting/ebslettings1.aspx#no-back-button
The South Dakota Standard Specifications for Roads and Bridges, 10-7-26 Version, may be
obtained at https://dot.sd.gov/doing-business/contractors/standard-specifications/ .
The electronic bid proposal must be submitted by a valid bidder as designated by their
company’s http://apps.sd.gov/HC65C2C/EBS/BidAdminAuthorizationForm.pdf. A bidding
administrator will have privileges in the SDEBS to prepare bids, submit bids, and authorize
additional company employees to prepare and submit bids. Additionally, a bidding
administrator will be responsible for maintaining the list of authorized bidders for the company
and will have the ability to add employees, remove employees, and set-up bidder
identifications and passwords within the SDEBS. Bidding Administrator authorization will
remain in full force and effect until written notice of termination of this authorization is sent by
an Officer of the company and received by the Department.
A bidder identification and password, coupled with a company identification previously
assigned by the Department, will serve as authentication that an individual is a valid bidder for
the company.
Contact information to schedule a preconstruction meeting prior to commencing with the work
on this project.
Jay Peppel
PO Box 1206
Mitchell, SD 57301-7206
Phone: 605/995-8120
PROPOSAL Revised 8/10/11
SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION, STATE OF SOUTH DAKOTA:
Ladies / Gentlemen:
The following proposal is made on behalf of the undersigned and no others. It is in all respects
fair and is made without collusion on the part of any other person, firm or corporation not
appearing in the signature to this proposal.
The undersigned certifies that she / he has carefully examined the plans listed herein, the
Specifications hereinbefore referred to, the Special Provisions and the form of contract, both of
which are attached hereto. The undersigned further certifies that she / he has personally
inspected the actual location of the work, together with the local sources of supply and that she /
he understands the conditions under which the work is to be performed, or, that if she / he has
not so inspected the actual location of the work, that she / he waives all right to plea any
misunderstanding regarding the location of the work or the conditions peculiar to the same.
On the basis of the plans, Specifications, Special Provisions and form of contract proposed for
use, the undersigned proposes to furnish all necessary machinery, tools, apparatus and other
means of construction, to do all the work and furnish all the materials in the manner specified, to
finish the entire project within the contract time specified and to accept as full compensation
therefore the amount of the summation of the products of the actual quantities, as finally
determined, multiplied by the unit prices bid.
The undersigned understands that the quantities as shown in the Bid Schedule are subject to
increase or decrease, and hereby proposes to perform all quantities of work, as increased or
decreased, in accordance with the provisions of the specifications, and subject to any applicable
special provisions, and at the unit prices bid.
The undersigned understands that the "Total or Gross Amount Bid" as immediately hereinbefore
set forth is not the final amount which will be paid if this proposal is accepted and the work done,
but that such amount is computed for the purpose of comparison of the bids submitted and the
determination of the amount of the performance bond.
The undersigned further proposes to perform all extra work that may be required on the basis
provided in the specifications, and to give such work personal attention in order to see that it is
economically performed.
The undersigned further proposes to both execute the contract agreement and to furnish a
satisfactory performance bond, in accordance with the terms of the specifications, within twenty
(20) calendar days after the date of Notice of Award from the South Dakota Department of
Transportation that this proposal has been accepted.
REV 11/2/26
INDEX OF SPECIAL PROVISIONS
PROJECT NUMBER(S): IM 0020(00) PCN: 0A5E
TYPE OF WORK: STRUCTURE CLEANING
COUNTY: BRULE
The following clauses have been prepared subsequent to the Standard Specifications for Roads
and Bridges and refer only to the above described improvement, for which the following
Proposal is made. In case of any discrepancy or conflict between said specifications and these
Special Provisions, the latter are to govern.
The Contractor’s attention is directed to the need for securing from the Department of
Environment & Natural Resources, Foss Building, Pierre, South Dakota, permission to remove
water from public sources (lakes, rivers, streams, etc.). The Contractor should make his request
as early as possible after receiving his contract, and insofar as possible at least 30 days prior to
the date that the water is to be used.
Devon Bartscher is the official in charge of the Mitchell Career Center for Brule County.
THE FOLLOWING ITEMS ARE INCLUDED IN THIS PROPOSAL FORM:
Special Provision for Submission of Bid Proposals (SDEBS Lettings), dated 10/29/26.
Special Provision for Aggregates for Granular Bases and Surfacing, dated 10/26/26.
Special Provision for Acknowledgement and Certification Regarding Article 3, Section 12 of the
South Dakota Constitution, dated 8/24/23.
Fuel Adjustment Affidavit, DOT form 208 dated 11/25.
Standard Title VI Assurance, dated 3/1/16.
Special Provision for Implementation of Clean Air Act & Federal Water
Pollution Control Act, dated 9/1/97.
Special Provision Regarding Minimum Wage on State Funded Projects, dated 10/24/19.
Wage and Hour Division US Department of Labor Washington DC.- US Dept. of
Labor Decision Number SD20260001, dated 1/30/26.
STATE OF SOUTH DAKOTA
DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISION
FOR
SUBMISSION OF BID PROPOSALS
(SDEBS Lettings)
OCTOBER 29, 2026
Add the following to the end of Section 2.10 B:
Bidders are strongly encouraged to complete and submit the bid proposal well in
advance of the deadline. Bidders assume full responsibility for the timely and successful
submission of their bid proposals. The Department is not responsible for a bidder’s
inability to submit a bid proposal using SDEBS. The Department reserves the right to
cancel the opening of bid proposals if in the judgment of the Department canceling the
opening of bid proposals promotes the best interest of the Department.
* * * * *
1
STATE OF SOUTH DAKOTA
DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISION
FOR
AGGREGATES FOR GRANULAR BASES AND SURFACING
OCTOBER 26, 2026
Section 882 – Delete Table 2 and replace it with the following:
Table 2 – Other Properties
Property Subbase
Gravel
Cushion
Base
Course
Limestone
Ledge Rock
Base Course
Limestone
Ledge Rock
Gravel Cushion
Gravel
Surfacing
Pit
Run
Granular
Bridge End
Backfill
Liquid Limit (max) 25 25 25 25 25
Plasticity Index (max) *1 0-6 0-6 0-6 0-3 0-3 4-12 0-6
LA Abrasion Loss (max) 50 40 40 40 40 40 40
Crushed Particles (min) +#4
Sieve
30% 1-CF 30% 1-CF 30% 1-CF 30% 1-CF 30% 1-CF 30% 1-CF 30% 1-CF
Foot Notes *2 *1,*2 *3
*1The fraction passing the #200 sieve will not be greater than 2/3 of the fraction passing the #40 sieve. In no case will the
upper limit specified for the #200 sieve be exceeded.
*2 Requirements apply to ledge rock other than limestone ledge rock.
*3 Acceptance of pit run will be by visual inspection. The Engineer may require a sieve analysis to verify the material meets
the specified gradation. Independent Assurance will not be required.
* * * * *
STATE OF SOUTH DAKOTA
DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISION
FOR
ACKNOWLEDGEMENT AND CERTIFICATION REGARDING
ARTICLE 3, SECTION 12
OF THE SOUTH DAKOTA CONSTITUTION
AUGUST 24, 2023
In accordance with the State of South Dakota Office of the Governor Executive Order
2023-13, the following will apply to all contracts:
The Contractor acknowledges and certifies that the following information is correct:
CERTIFICATION OF NO STATE LEGISLATOR INTEREST:
Contractor (i) understands neither a state legislator nor a business in
which a state legislator has an ownership interest may be directly or
indirectly interested in any contract with the State that was authorized
by any law passed during the term for which that legislator was
elected, or within one year thereafter, and (ii) has read South Dakota
Constitution Article 3, Section 12 and has had the opportunity to seek
independent legal advice on the applicability of that provision to this
contract. By signing this contract, Contractor hereby certifies that this
contract is not made in violation of the South Dakota Constitution
Article 3, Section 12.
It is understood and agreed that, if this certification is false, such false certification
will constitute grounds for the Department to terminate the contract.
The Contractor further agrees to provide immediate written notice to the
Department if during the term of the contract it no longer complies with this
certification and agrees such noncompliance may be grounds for contract
termination.
* * * * *
1
DOT-208
(11/25)
FUEL ADJUSTMENT AFFIDAVIT
Project Number
PCN
County
For projects let using the SDEBS) and in accordance with Section 9.10, the bidder is not required to notify
the Department at the time of submitting bids whether the Contractor will or will not participate in the fuel
cost adjustment program. Prior to execution of the contract, the successful bidder must submit this completed
form to the Department for approval. The Fuel Adjustment Affidavit will include the anticipated fuel cost of
subcontractors.
Does your company elect to participate in a fuel adjustment for this contract for the fuels that do not have a
fixed price? No adjustments in fuel prices will be made if “No” is checked.
Yes No
If yes, provide the total dollars for each of the applicable fuels. No adjustments in fuel price will be made for
the fuel types that are left blank or completed with a $0.00 value.
Diesel (x) $
Unleaded (y) $
Burner Fuel (z) $ Type of Burner Fuel Used:
Sum (x + y + z) = $
Note: The sum of the x, y, and z must not exceed 15% of the original contract amount.
The following must be completed regardless of whether the Contractor elects to participate in the fuel
adjustment affidavit
Under the penalty of law for perjury or falsification, the undersigned, (Printed Name)
,
(Title)
of (Contractor)
,
hereby certifies that the documentation is submitted in good faith, that the information provided is accurate
and complete to the best of their knowledge and belief, and that the monetary amount identified accurately
reflects the cost for fuel, and that they are duly authorized to certify the above documentation on behalf of
the company.
I hereby agree that the Department or its authorized representative will have the right to examine and copy
all Contractor records, documents, work sheets, bid sheets, and other data pertinent to the justification of the
fuel costs shown above.
Dated Signature
Notarization is required only when the Contractor elects to participate in the fuel adjustment affidavit
Subscribed and sworn before me this day of , 20 .
Notary Public My Commission Expires
□ □
STATE OF SOUTH DAKOTA
DEPARTMENT OF TRANSPORTATION
STANDARD TITLE VI / NONDISCRIMINATION ASSURANCES
APPENDIX A & E
MARCH 1, 2016
During the performance of this contract, the contractor, for itself, its assignees, and successors in
interest (hereinafter referred to as the "contractor") agrees as follows:
1. Compliance with Regulations: The contractor (hereinafter includes consultants) will comply
with the Acts and the Regulations relative to Non-discrimination in Federally-assisted
programs of the U.S. Department of Transportation, Federal Highway Administration, as they
may be amended from time to time, which are herein incorporated by reference and made a
part of this contract.
2. Non-discrimination: The contractor, with regard to the work performed by it during the
contract, will not discriminate on the grounds of race, color, or national origin in the selection
and retention of subcontractors, including procurements of materials and leases of equipment.
The contractor will not participate directly or indirectly in the discrimination prohibited by the
Acts and the Regulations, including employment practices when the contract covers any
activity, project, or program set forth in Appendix B of 49 CFR Part 21.
3. Solicitations for Subcontracts, Including Procurements of Materials and Equipment: In
all solicitations, either by competitive bidding, or negotiation made by the contractor for work to
be performed under a subcontract, including procurements of materials, or leases of
equipment, each potential subcontractor or supplier will be notified by the contractor of the
contractor's obligations under this contract and the Acts and the Regulations relative to Non-
discrimination on the grounds of race, color, or national origin.
4. Information and Reports: The contractor will provide all information and reports required by
the Acts, the Regulations, and directives issued pursuant thereto and will permit access to its
books, records, accounts, other sources of information, and its facilities as may be determined
by the Recipient or the Federal Highway Administration to be pertinent to ascertain compliance
with such Acts, Regulations, and instructions. Where any information required of a contractor
is in the exclusive possession of another who fails or refuses to furnish the information, the
contractor will so certify to the Recipient or the Federal Highway Administration, as
appropriate, and will set forth what efforts it has made to obtain the information.
5. Sanctions for Noncompliance: In the event of a contractor's noncompliance with the Non
discrimination provisions of this contract, the Recipient will impose such contract sanctions as
it or the Federal Highway Administration may determine to be appropriate, including, but not
limited to:
a. withholding payments to the contractor under the contract until the contractor complies;
and/or
b. cancelling, terminating, or suspending a contract, in whole or in part.
6. Incorporation of Provisions: The contractor will include the provisions of paragraphs one
through six in every subcontract, including procurements of materials and leases of
equipment, unless exempt by the Acts, the Regulations and directives issued pursuant thereto.
The contractor will take action with respect to any subcontract or procurement as the Recipient
or the Federal Highway Administration may direct as a means of enforcing such provisions
including sanctions for noncompliance. Provided, that if the contractor becomes involved in, or
is threatened with litigation by a subcontractor, or supplier because of such direction, the
contractor may request the Recipient to enter into any litigation to protect the interests of the
Recipient. In addition, the contractor may request the United States to enter into the litigation
to protect the interests of the United States.
During the performance of this contract, the contractor, for itself, its assignees, and successors in
interest (hereinafter referred to as the "contractor") agrees to comply with the following non-
discrimination statutes and authorities; including but not limited to:
Pertinent Non-Discrimination Authorities:
Title VI of the Civil Rights Act of 1964 (42 U.S.C. § 2000d et seq., 78 stat. 252), (prohibits
discrimination on the basis of race, color, national origin); and 49 CFR Part 21.
The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42
U.S.C. § 4601), (prohibits unfair treatment of persons displaced or whose property has been
acquired because of Federal or Federal-aid programs and projects);
Federal-Aid Highway Act of 1973, (23 U.S.C. § 324 et seq.), (prohibits discrimination on the
basis of sex);
Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. § 794 et seq.), as amended,
(prohibits discrimination on the basis of disability); and 49 CFR Part 27;
The Age Discrimination Act of 1975, as amended, (42 U.S.C. § 6101 et seq.), (prohibits
discrimination on the basis of age);
Airport and Airway Improvement Act of 1982, (49 USC § 471, Section 47123), as amended,
(prohibits discrimination based on race, creed, color, national origin, or sex);
The Civil Rights Restoration Act of 1987, (PL 100-209), (Broadened the scope, coverage and
applicability of Title VI of the Civil Rights Act of 1964, The Age Discrimination Act of 1975 and
Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms
"programs or activities" to include all of the programs or activities of the Federal-aid recipients,
sub-recipients and contractors, whether such programs or activities are Federally funded or
not);
Titles II and III of the Americans with Disabilities Act, which prohibit discrimination on the basis
of disability in the operation of public entities, public and private transportation systems, places
of public accommodation, and certain testing entities (42 U.S.C. §§ 12131-12189) as
implemented by Department of Transportation regulations at 49 C.F.R. parts 37 and 38;
The Federal Aviation Administration's Non-discrimination statute (49 U.S.C. § 47123)
(prohibits discrimination on the basis of race, color, national origin, and sex);
Executive Order 12898, Federal Actions to Address Environmental Justice in Minority
Populations and Low-Income Populations, which ensures Non-discrimination against minority
populations by discouraging programs, policies, and activities with disproportionately high and
adverse human health or environmental effects on minority and low-income populations;
Executive Order 13166, Improving Access to Services for Persons with Limited English
Proficiency, and resulting agency guidance, national origin discrimination includes
discrimination because of Limited English proficiency (LEP). To ensure compliance with Title
VI, you must take reasonable steps to ensure that LEP persons have meaningful access to
your programs (70 Fed. Reg. at 74087 to 74100);
Title IX of the Education Amendments of 1972, as amended, which prohibits you from
discriminating because of sex in education programs or activities (20 U.S.C. 1681 et seq).
********
STATE OF SOUTH DAKOTA
DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISION FOR
IMPLEMENTATION OF CLEAN AIR ACT
AND
FEDERAL WATER POLLUTION CONTROL ACT
SEPTEMBER 1, 1997
By signing this bid, the bidder will be deemed to have stipulated as follows:
a) That any facility to be utilized in the performance of this contract, unless such contract is
exempt under the Clean Air Act, as amended (42 U.S.C. 1857 et seq., as amended by Pub.
L. 91-604), and under the Federal Water Pollution Control Act, as amended (33 U.S.C.
1251 et seq., as amended by Pub. L. 92-500), Executive Order 11738, and regulations in
implementation thereof (40 CFR, Part 15), is not listed on the U.S. Environmental
Protection Agency (EPA) List of Violating Facilities pursuant to 40 CFR 15.20.
b) That the State Transportation Department shall be promptly notified prior to contract
award of the receipt by the bidder of any communication from the Director, Office of
Federal Activities, EPA, indicating that a facility to be utilized for the contract is under
consideration to be listed on the EPA List of Violating Facilities.
* * * *
STATE OF SOUTH DAKOTA
DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISION REGARDING
MINIMUM WAGE ON STATE FUNDED PROJECTS
OCTOBER 24, 2019
This proposal contains a copy of the most recent United States Department of Labor
(USDOL) Davis-Bacon Act Wage Decision, adopted by the South Dakota Transportation
Commission.
If the amount of this contract, as awarded, is $100,000.00 or more, the following wage
provisions will apply:
1. The Contractor and each related subcontractor will pay all laborers and mechanics
working at the site of work unconditionally and not less than once a week, and without
subsequent deduction or rebate of any account, other than permitted payroll
deductions. The Contractor and each related subcontractor must compute the full
amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at
the time of payment at rates not less than those rates contained in the USDOL Davis-
Bacon Act Wage Decision.
2. The Contractor and each related subcontractor will pay their respective employees
not less than the USDOL minimum wage for each work classification an employee
actually performs at the site of the work.
3. The Contractor and each related subcontractor must submit weekly, for each week in
which any contract work is performed, an electronic certified weekly payroll report.
The payroll report must be submitted electronically to the Elation System website. The
Elation System website can be accessed by logging onto the State of South Dakota’s
single sign-on website at https://mysd.sd.gov/ or can also be accessed at
https://elationsys.com/. First time users will need to use the Promotion Code SDDOT-
19. The payroll report must be submitted within fourteen (14) calendar days after the
end of the workweek. The payroll reports submitted shall set out accurately and
completely all the information required to be maintained under 29 C.F.R. 5.5(a)(3)(i).
Weekly transmittals must include an individually identifying number for each
employee, such as the last four digits of the employee’s social security number, but
these weekly transmittals must not include full social security numbers or home
addresses. The Contractor is responsible for the submission of certified payroll reports
by all subcontractors.
4. Each certified weekly payroll report must include the most recent South Dakota
Department of Transportation (SDDOT) Statement of Compliance Form, signed by
the Contractor or related subcontractor or his or her agent who pays or supervises the
payment of the persons employed under the contract. The Instructions for the SDDOT
Statement of Compliance Form are found at https://dot.sd.gov/doing-
business/contractors/labor-compliance/certified-payrolls-let-after-6/5/19. The SDDOT
will not accept any payroll report which does not include the most recent SDDOT
Statement of Compliance Form.
5. The Contractor and each related subcontractor will maintain payrolls and basic
records relating thereto during the course of the work and preserve these records for
a period of three (3) years from the date of completion of the contract for all laborers,
mechanics, apprentices, trainees, watchmen, and guards working at the site of the
work. These records must contain the name, address, social security number of each
such worker, his or her correct work classification, and hourly rates of wages paid
(including rates of contributions or costs anticipated for bona fide fringe benefits or
cash equivalents thereof).The Contractor and each related subcontractor will make
these records available for inspection, copying, or transcription by the Labor
Compliance Officer (LCO) and will permit the LCO to interview employees during
working hours on the site of the work.
6. The SDDOT will upon its own action, or upon written request of an authorized
representative of the USDOL, withhold, or cause to be withheld, from the Contractor
or related subcontractor under this contract, or any other contract with the same prime
Contractor, as much of the accrued payments, advances, or guarantee of funds as
may be considered necessary to pay laborers and mechanics, including apprentices,
trainees, and helpers employed by the Contractor or any related subcontractor, the
full amount of wages required by the contract. In the event the Contractor fails to pay
any laborer or mechanic, including any apprentice, trainee, or helper employed or
working on the site of the work, all or part of the wages required by the contract, the
LCO may, after written notice to the Contractor, take such action as may be necessary
to cause the suspension of any further payment, advance, or guarantee of funds under
this contract or any other contract with the same prime Contractor until such violations
have ceased.
* * * * *
Wage and Hour Division
U.S. Department of Labor (DOL)
200 Constitution Avenue, N.W.
Washington, DC 20210
Davis-Bacon Act Wage Decision
State: South Dakota
Construction Types: Heavy and Highway
Counties: South Dakota Statewide Agency: U.S. DOL
Wage Decision Number: SD20260001 SD1
Counties: SD Statewide
Wage Decision Date: 01/30/2026 (Mod-0)
*SASD2025-001 12/12/2024
LABORERS Rates Fringes
Group GL1
Air Tool Operator; Common Laborer; Landscape Worker; Flagger; Pilot Car Driver; Trucks under 26,000 GVW;
Materials Checker, Special Surface Finish Applicator 26.93 0.00
Group GL2
Mechanic Tender; Pipe Layer (except culvert); Form Builder Tender 26.96 0.00
Group GL3
Asphalt Plant Tender; Pile Driver Leadsman; Form Setter; Oiler/Greaser 28.97 0.00
Group GL5
Carpenter; Form Builder 31.94 0.00
Group GL6
Concrete Finisher; Grade Checker 29.81 0.00
POWER EQUIPMENT OPERATORS
Group G01
Tractor (farm type with attachments, including loaders but excluding Backhoe); Self Propelled Broom; Concrete
Routing Machine; Paver Feeder; Pugmill; Skid Steer 30.16 0.00
Group G02
Concrete Paving Cure Machine; Concrete Paving Joint Sealer; Bull Dozer 80 HP or less; Front End Loader 1.25
CY or less; Self Propelled Roller (except Hot Mix); Sheepsfoot/Pneumatic Roller; Pneumatic Tired Tractor or
Crawler (includes Water Wagon and Power Spray units); Wagon Drill (Air Trac – Trac Drill); Truck Type Auger;
Concrete Paving Saw; Concrete Grooving
31.73 0.00
Group G03
Asphalt Distributor; Bull Dozer over 80 HP; Backhoes/ Excavators 20 tons or less; Crusher (may include internal
screening plant); Front End Loader over 1.25 CY; Rough Motor Grader; Self Propelled Hot Mix Roller; Push or
Pull Tractor; Off-Highway Haul Trucks; Material Spreader or Placer; Rumble Strip Machine; Pavement Marking
Grinding Equipment
31.56 0.00
Group G04
Concrete Paving Finishing Machine; Asphalt Paving Machine Screed; Asphalt Paving Machine; Cranes/Derricks/
Draglines/Pile Drivers/Shovels 30 to 50 tons; Backhoes/Excavators 21 to 40 tons; Maintenance Mechanic;
Scrapers (wheel or tracks); Concrete Pump Truck
32.49 0.00
Group G05
Asphalt Plant; Concrete Batch Plant; Backhoes/Excavators over 40 Tons; Cranes/ Derricks/Draglines/Pile
Drivers/Shovels over 50 tons; Heavy Duty Mechanic; Finish Motor Grader; Automatic Fine Grader; Milling
Machine; Bridge Welder
34.96 8.36
TRUCK DRIVERS
Group GT1
Tandem Truck without trailer or pup; Single Axle Truck over 26,000 GVW with Trailer 30.01 0.00
Group GT2
Semi-Tractor and Trailer; Tandem Truck with Pup or Trailer 32.07 8.42
P a g e 2 | 3
Wage and Hour Division
U.S. Department of Labor (DOL)
200 Constitution Avenue, N.W.
Washington, DC 20210
Davis-Bacon Act Wage Decision
State: South Dakota
Construction Types: Heavy and Highway
Counties: South Dakota Statewide Agency: U.S. DOL
Wage Decision Number: SD20260001 SD1
Counties: SD Statewide
Wage Decision Date: 01/30/2026 (Mod-0)
*SASD2025-001 12/12/2024
ELECTRICIANS Rates Fringes
Group E01
Electrician 35.43 8.69
IRON WORKERS
Group I01
Position and secure steel bars or mesh in concrete for reinforcement, steel tiers, saw. Carrying, placing, tying,
reinforcing steel under supervision, cutting. Placing steel or prefabricated reinforcement assembly for placement
in concrete forms.
26.93 0.00
Group I02
Erect, place and join steel girders, columns, structural framework, air wrenches, spud bars, grinders, drills,
sledgehammers, tag lines, plumb bobs, lasers, levels, bolts, wire, welds, shears, rod-bending machines, torches. 28.97 0.00
PAINTERS
Group P01
Line striping machine, paint trucks, epoxy trucks, thermoplastic trucks, cold applied plastic/and preformed
thermoplastic pavement marking equipment. Operate pavement marking equipment to include epoxies, paints,
primers, sealers, cold applied tapes, thermoplastics used for traffic marking purposes.
26.96 0.00
Group P02
Painting or protective coating bridges, apply varnish, anti-rust materials, prepare steel or other surfaces with
primer or sandblasting, paints structural framework of bridges, guardrails and cables of bridges and other
structures.
29.81 0.00
WELDERS – Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award, pursuant to 29 CFR
5.5(a)(1)(ii); contractors are responsible for requesting SDDOT to secure necessary additional work classifications and rates.
The "SA” identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R.
1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year
during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination. The date, 01/03/2024 in the example, reflects the date on which the classifications and
rates under the “SA” identifier took effect under state law in the state from which the rates were adopted.
For SDDOT Defined Work Classifications, please visit: https://dot.sd.gov/doing-business/contractors/labor-compliance
A COPY OF THIS DOCUMENT, COLORED GREEN, MUST BE CONSPICUOUSLY POSTED AT THE PROJECT SITE
P a g e 3 | 3
Wage and Hour Division
U.S. Department of Labor (DOL)
200 Constitution Avenue, N.W.
Washington, DC 20210
Davis-Bacon Act Wage Decision
State: South Dakota
Construction Types: Heavy and Highway
Counties: South Dakota Statewide SD20260001 SD1 01/30/2026 (Mod-0)
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on a wage determination matter
d) an initial conformance (additional classification and rate) determination
On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage
Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD
Branch of Construction Wage Determinations. Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request
review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Requests for review and
reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project
description, area practice material, etc.) that the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the
Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210.
END OF GENERAL DECISION
South Dakota Department of Transportation - Bid Letting Information SDEBS Lettings Regional Lettings Bidding Information NEW Electronic Bidding Contractor Information Bid Letting Staff Error Message An error has occurred on the page you requested. Please contact the bid letting office at 605-773-3275 to report this error. Bid Letting Home Bid Letting Log In
- Enriched
- Yes
- Pdf Pages
- 28
- Work Desc
- Structure Cleaning
- Work Type
- Work Type 8 or Work Type 13 or Work Type 15
- Addendums
- 0
- Project No
- IM 0020(00)
- Questions
- 3
- List Url Hint
- hc65bidletting/ebslettings1.aspx
- Letting Label
- December 9, 2026
- Categorized By
- llm