- South Dakota Department of Transportation - Bid Letting Information SDEBS Lettings Regional Lettings Bidding Information NEW Electronic Bidding Contractor Information Bid Letting Staff Error Message An error has occurred on the page you requested. Please contact the bid letting office at 605-773-3275 to report this error. Bid Letting Home Bid Letting Log In
- Pdf Text
- Planning & Engineering
Office of Project Development
700 East Broadway Avenue
Pierre, South Dakota 57501-2586
O: 605.773.3275
dot.sd.gov
_____________________________________________________________________________________
September 11, 2026
To Whom it May Concern,
Beginning with the 10/7/2026 letting, the SDDOT will be using the new Electronic Standard
Specifications for Roads and Bridges, 10-7-26 Version. The Standard Specifications for Roads
and Bridges is available for download and viewing at https://dot.sd.gov/doing-
business/contractors/standard-specifications . A printed version of the Standard Specifications
for Roads and Bridges will not be provided.
A revised Buy America specification is in effect beginning with the 10/7/26 letting, which aligns
with the expiration of the Federal Manufactured Products General Waiver. Contractors should
be aware that new provisions for manufactured products, along with updates to material
classifications, documentation requirements, and compliance procedures, are included in
Section 6.9 of the Standard Specifications (10/07/2026 version). All contractors and suppliers
are strongly encouraged to review the updated specification in full. Contractors are encouraged
to attend the Buy America Informational Webinar being put on by the SDDOT and AGC.
Information on the webinar can be found at:
https://dot.sd.gov/doing-business/contractors/webinars/
FHWA has updated the FHWA-1273 commonly known as the “Pink Sheets”. The new FHWA-
1273 will be incorporated into all contracts awarded after 10/7/26. Additional information
regarding the updated FHWA-1273 can be found at:
https://www.fhwa.dot.gov/construction/cqit/form1273.cfm
Sincerely,
SDDOT – Bid Letting Office
3
DEPARTMENT OF TRANSPORTATION
NOTICE TO CONTRACTORS,
PROPOSAL, SPECIAL PROVISIONS,
CONTRACT AND CONTRACT BOND
FOR
URBAN GRADING, CURB & GUTTER, LIGHTING, SIDEWALK, STORM
SEWER, ASPHALT CONCRETE SURFACING
FEDERAL PROJECT NO. NH 0018(260)425
(PCN 06G3)
US HIGHWAY 18
IN TURNER COUNTYNovember 4, 2026
DEPARTMENT OF
TRANSPORTATION
NOTICE TO ALL BIDDERS
TO REPORT BID RIGGING ACTIVITIES, CALL: 1-800-424-9071
THE U.S. DEPARTMENT OF TRANSPORTATION (DOT) OPERATES THE ABOVE TOLL-
FREE “HOTLINE” MONDAY THROUGH FRIDAY, 8:00 A.M. TO 5:00 P.M., EASTERN TIME.
ANYONE WITH KNOWLEDGE OF POSSIBLE BID RIGGING, BIDDER COLLUSION, OR
OTHER FRAUDULENT ACTIVITIES SHOULD USE THE “HOTLINE” TO REPORT SUCH
ACTIVITIES.
THE “HOTLINE” IS PART OF THE DOT’S CONTINUING EFFORT TO IDENTIFY AND
INVESTIGATE HIGHWAY CONSTRUCTION CONTRACT FRAUD AND ABUSE AND IS
OPERATED UNDER THE DIRECTION OF THE DOT INSPECTOR GENERAL.
ALL INFORMATION WILL BE TREATED CONFIDENTIALLY, AND CALLER ANONYMITY
WILL BE RESPECTED.
* * * *
PLANS, PROPOSALS AND ADDENDA
AFTER AWARD OF CONTRACT, THE LOW BIDDER WILL RECEIVE TEN (10)
COMPLIMENTARY SETS OF PLANS, PROPOSALS, PROJECT Q & A FORUM, AND
ADDENDA FOR FIELD AND OFFICE USE. AN ELECTRONIC COPY WILL ALSO BE
PROVIDED. ANY ADDITIONAL COPIES REQUIRED WILL BE THE RESPONSIBILITY OF THE
CONTRACTOR.
* * * *
Project Number: NH 0018(260)425 Revised 10/8/25
PCN 06G3
NOTICE TO CONTRACTORS
Bid proposals for this project will be prepared, transmitted, and received electronically by the
South Dakota Department of Transportation (SDDOT) via the South Dakota Electronic Bid
System until 10 A.M. Central time, on November 4, 2026, at which time the SDDOT will open
bids. All bids will be checked for qualifications with results posted on the SDDOT website. The
South Dakota Transportation Commission will consider all bids at a scheduled Commission
meeting.
The work for which proposals are hereby requested is to be completed within the following
requirement(s):
FIELD WORK COMPLETION: OCTOBER 29, 2027
The project category is Category III
The project type is Grading
The geographic zone is Zone 6
THE DBE GOAL FOR THIS PROJECT IS: N/A
WORK TYPE FOR THIS PROJECT IS: WORK TYPE 2 OR WORK TYPE 12 OR WORK TYPE
14
Bidding package for the work may be obtained at:
http://apps.sd.gov/hc65bidletting/ebslettings1.aspx#no-back-button
The South Dakota Standard Specifications for Roads and Bridges, 10-7-26 Version, may be
obtained at https://dot.sd.gov/doing-business/contractors/standard-specifications/ .
The electronic bid proposal must be submitted by a valid bidder as designated by their
company’s https://apps.sd.gov/HC65C2C/EBS/BidAdminAuthorizationForm.pdf. A bidding
administrator will have privileges in the SDEBS to prepare bids, submit bids, and authorize
additional company employees to prepare and submit bids. Additionally, a bidding
administrator will be responsible for maintaining the list of authorized bidders for the company
and will have the ability to add employees, remove employees, and set-up bidder
identifications and passwords within the SDEBS. Bidding Administrator authorization will
remain in full force and effect until written notice of termination of this authorization is sent by
an Officer of the company and received by the Department.
A bidder identification and password, coupled with a company identification previously
assigned by the Department, will serve as authentication that an individual is a valid bidder for
the company.
Contact information to schedule a preconstruction meeting prior to commencing with the work
on this project.
Harry Johnston
5316 W 60th St N
Sioux Falls, SD 57107
Phone: 605/367-5680
PROPOSAL Revised 8/10/11
SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION, STATE OF SOUTH DAKOTA:
Ladies / Gentlemen:
The following proposal is made on behalf of the undersigned and no others. It is in all respects
fair and is made without collusion on the part of any other person, firm or corporation not
appearing in the signature to this proposal.
The undersigned certifies that she / he has carefully examined the plans listed herein, the
Specifications hereinbefore referred to, the Special Provisions and the form of contract, both of
which are attached hereto. The undersigned further certifies that she / he has personally
inspected the actual location of the work, together with the local sources of supply and that she /
he understands the conditions under which the work is to be performed, or, that if she / he has
not so inspected the actual location of the work, that she / he waives all right to plea any
misunderstanding regarding the location of the work or the conditions peculiar to the same.
On the basis of the plans, Specifications, Special Provisions and form of contract proposed for
use, the undersigned proposes to furnish all necessary machinery, tools, apparatus and other
means of construction, to do all the work and furnish all the materials in the manner specified, to
finish the entire project within the contract time specified and to accept as full compensation
therefore the amount of the summation of the products of the actual quantities, as finally
determined, multiplied by the unit prices bid.
The undersigned understands that the quantities as shown in the Bid Schedule are subject to
increase or decrease, and hereby proposes to perform all quantities of work, as increased or
decreased, in accordance with the provisions of the specifications, and subject to any applicable
special provisions, and at the unit prices bid.
The undersigned understands that the "Total or Gross Amount Bid" as immediately hereinbefore
set forth is not the final amount which will be paid if this proposal is accepted and the work done,
but that such amount is computed for the purpose of comparison of the bids submitted and the
determination of the amount of the performance bond.
The undersigned further proposes to perform all extra work that may be required on the basis
provided in the specifications, and to give such work personal attention in order to see that it is
economically performed.
The undersigned further proposes to both execute the contract agreement and to furnish a
satisfactory performance bond, in accordance with the terms of the specifications, within twenty
(20) calendar days after the date of Notice of Award from the South Dakota Department of
Transportation that this proposal has been accepted.
CERTIFICATION REGARDING LOBBYING
I certify, to the best of my knowledge and belief, that: No Federal appropriated funds have
been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or
attempting to influence an officer or employee of any agency, a member of Congress, an
officer or employee of Congress, or an employee of a member of Congress in connection with
the awarding of any Federal contract, the making of any Federal grant, the making of any
Federal loan, the entering into of any cooperative agreement, and the extension, continuation,
renewal, amendment, or modification of a Federal contract, grant, loan, or cooperative
agreement. If any funds other than Federal appropriated funds have been paid or will be paid
to any of the above mentioned parties, the undersigned shall complete and submit Standard
Form LLL, “Disclosure Form to Report Lobbying,” in accordance with its instructions.
The undersigned shall require that the language of this certification be included in the award
documents for all subawards at all tiers (including subcontracts, subgrants, and contracts
under grants, loans, and cooperative agreements) and that all subrecipients shall certify and
disclose accordingly. This certification is a material representation of fact upon which reliance
was placed when this transaction was made or entered into. Submission of this certification is
a prerequisite for making or entering into this transaction imposed by section 1352, title 31,
U.S. Code. Any person who fails to file the required certification shall be subject to a civil
penalty or not less than $10,000 and not more than $100,000 for each such failure.
REV 9/1/26
INDEX OF SPECIAL PROVISIONS
PROJECT NUMBER(S): NH 0018(260)425 PCN: 06G3
TYPE OF WORK: URBAN GRADING, CURB & GUTTER, LIGHTING, SIDEWALK, STORM
SEWER, ASPHALT CONCRETE SURFACING
COUNTY: TURNER
The following clauses have been prepared subsequent to the Standard Specifications for Roads
and Bridges and refer only to the above described improvement, for which the following
Proposal is made.
The Contractor’s attention is directed to the need for securing from the Department of
Environment & Natural Resources, Foss Building, Pierre, South Dakota, permission to remove
water from public sources (lakes, rivers, streams, etc.). The Contractor should make his request
as early as possible after receiving his contract, and insofar as possible at least 30 days prior to
the date that the water is to be used.
Sara Garbe is the official in charge of the Sioux Falls Career Center for Turner County.
THE FOLLOWING ITEMS ARE INCLUDED IN THIS PROPOSAL FORM:
Special Provision for Contract Time, dated 9/28/26.
Special Provision for Contractor Staking, dated 9/28/26.
List of Utilities.
Special Provision for Acknowledgment and Certification Regarding Article 3, Section 12 of the
South Dakota Constitution, dated 8/24/23.
Fuel Adjustment Affidavit, DOT form 208 dated 11/25.
Standard Title VI Assurance, dated 3/1/16
Special Provision for Equal Employment Opportunity Requirements for Highway Construction
Contracts, dated 10/7/26.
Special Provision for Contract Provisions for Federal-Aid Construction Contracts, Form
FHWA 1273 (Rev. June 25, 2026), dated 10/7/26.
Contract Provisions for Federal-Aid Construction Contracts, Form FHWA 1273 (Rev. 6/25/26).
Special Provision Regarding Minimum Wage on Federal-Aid Projects, dated 10/24/19.
Wage and Hour Division US Department of Labor Washington DC. - US Dept. of Labor
DecisionNumber SD20260001, dated 1/30/26.
Special Provision Regarding Stormwater Discharges to Waters of the State, dated 11/5/25.
General Permit Authorizing Stormwater Discharges Associated with Construction
Activities, dated 11/1/23.
https://danr.sd.gov/OfficeOfWater/SurfaceWaterQuality/stormwater/StormWater
Construction.aspx
STATE OF SOUTH DAKOTA
DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISION
FOR
CONTRACT TIME
PROJECT NH 0018(260)425, PCN 06G3
TURNER COUNTY
SEPTEMBER 28, 2026
Sta. 232+73 to Sta. 241+49.4 Working Day Count
The Contractor will be allowed to reduce SD 18 to one lane with use of temporary traffic
signals from Sta. 232+73 to Sta. 241+49.4 for a maximum of 50 working days. During this
period, traffic will be allowed to be placed on a gravel surface. The Department will begin
to count working days when the Contractor begins any work affecting traffic at this
location. The Department will continue to count working days until traffic is restored 1 lane
in each direction on a hard asphalt surface. The Department will count working days in
accordance with Section 8.7 C.
If the Contractor does not complete the work within the working day completion
requirement, the Department will make a disincentive assessment in the amount of $1000
per working day. A contract item for incentive/disincentive pay is included in the bid
schedule for the Department’s use in assessing disincentive. The Department will use a
negative quantity of days for assessing disincentives. The Department will count working
days in accordance with Section 8.7 C.
Field Work Completion
The Contractor will complete the project by the October 29, 2027 field work completion
date.
The Contractor will complete all work on the project prior to the field work completion
requirement. If the Contractor does not complete all work by the field work completion
requirement, the Department will assess liquidated damages in accordance with Section
8.9. The Department will assess liquidated damages for each working day the work
(project) is late until the Contractor completes all field work.
In the event the Contractor does not complete all field work on time, the Department will
count working days in accordance with Section 8.7 B.
* * * * *
94131326.docx 1
STATE OF SOUTH DAKOTA
DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISION
FOR
CONTRACTOR STAKING
PROJECT NH 0018(260)425, PCN 06G3
TURNER COUNTY
SEPTEMBER 28, 2026
Delete Section 5.8 of the specifications and insert the following:
SECTION 5.8
CONSTRUCTION STAKES, LINES AND GRADES
CONTRACTOR GRADE STAKING
A. DESCRIPTION
The Contractor will perform all construction staking. The staking work includes, but
is not limited to, establishing or re-establishing the project centerline; establishing
control points and benchmarks as needed; setting additional benchmarks as
needed; taking original and final cross sections of all Contractor secured borrow
sources and State designated borrow sources; taking cross sections of all topsoil
stockpiles; and staking right-of-way, easements, and fence.
The Contractor will perform all construction layout and reference staking necessary
for the accurate control and completion of all grading, paving, drainage, median
crossovers, signing, pavement marking, permanent benchmarks, detours, fence,
and all other appurtenances required for the complete construction and
acceptance of the work. The layout will include, but is not limited to, staking
easement line, staking clearing line, grade staking (blue tops), and performing the
miscellaneous staking as described in the plans and in this specification.
Horizontal and vertical control has been established as shown on the plans. Each
horizontal and vertical control point will be preserved or reset out of the work limits
and available during and after construction is complete. Prior to the Department’s
final acceptance of the project, the Contractor will replace or reset any control that
is disturbed during the construction of the project. The Contractor will provide the
Department a list of the in-place control points, including coordinates and
elevations relevant to the project control, at the end of the project.
94131326.docx 2
The Contractor will perform the staking work in accordance with the Department’s
Survey Manual, except as modified by this specification.
B. MATERIALS
The Contractor will furnish all staking materials of adequate quality for the purpose
intended including all stakes, stake chasers, paint, field note books, and all other
materials and equipment necessary to perform the required work.
C. CONSTRUCTION REQUIREMENTS
1. General: The Contractor will perform all staking work under the supervision of
a qualified surveyor or engineer who is experienced and competent in road and
bridge construction surveying and staking. The surveyor or engineer will be
available to review work, resolve problems, and make decisions in a timely
manner. A crew chief, competent to perform all required surveying duties, will
supervise the staking in the absence of the surveyor or engineer from the
project. The Contractor will submit the qualifications and work experience
history of the surveyor or engineer who will supervise the construction survey
work to the Engineer for review at least 14 calendar days prior to beginning the
staking work.
The Contractor will also submit the proposed starting date of the staking and
the anticipated surveying work schedule.
The Contractor will furnish, set, and properly reference all stakes, references,
lines, grades, and batter boards required. Minimum reference notations will be
for type, location, and alignment (when there are multiple alignments in the
same area). The Contractor will perform the survey and staking work in a
manner consistent with standard engineering practices and approved by the
Engineer.
The Contractor is solely responsible for the accuracy of the survey and staking
work. The Contractor will notify the Engineer of any errors and discrepancies
found in previous surveys, plans, specifications, or special provisions prior to
proceeding with the survey work.
The Contractor will be responsible for the supervision of the construction
staking personnel. The Contractor will correct any deficient survey or staking
work that results in construction errors at no additional cost to the Department.
The Contractor will keep field notes in conventional handwritten notebooks or
in a computerized form acceptable to the Engineer in a clear, orderly, and neat
manner. The notebooks will become the property of the Department upon
completion of the project. The notebooks will provide enough information such
94131326.docx 3
that quantity measurements are verifiable by the Department. Field notes are
subject to inspection by the Engineer at any time.
The Contractor is required to submit any remaining required quantity
calculations and notes to the Engineer no later than 60 calendar days after
completion of the survey and staking work.
The Department will set reference control points. The Contractor is responsible
for the preservation of ties and references to all control points necessary for the
accurate re-establishment of all base lines and centerlines shown in the plans,
whether established by the Contractor or found on or adjacent to the project.
The Department will also establish benchmark elevations. It is the responsibility
of the Contractor to verify the accuracy of the benchmark elevations prior to
use on the project.
The Contractor will furnish stakes and wooden hubs or steel pins of sufficient
length to provide a solid set in the ground. The Contractor will place half-length
lath stakes or stake chasers or an alternate, acceptable to the Engineer,
adjacent to or on the blue top hubs for guards. Stakes set not meeting these
requirements will be reset at the Contractors expense. The Contractor will
replace stakes damaged, destroyed, illegible, or made unusable at no
additional expense to the Department.
The Engineer may check the accuracy and control of the Contractor's survey
and staking work at any time. The checks performed by the Engineer will not
relieve the Contractor of the responsibility for the accuracy of the survey layout
or the construction work. If the random checks show the grade is out of
tolerance, the Engineer may require the Contractor to set additional stakes at
the discretion of the Engineer, at no additional cost to the Department. If the
Engineer orders additional stakes, the Contractor will perform the additional
staking until the Contractor can show the staking operations achieve the
specified grade tolerances.
Prior to any project staking, the Contractor will run a level circuit to check the
plan benchmarks the full length of the project.
2. Grade Staking: The Contractor will set grade finishing stakes (blue tops) for
grade elevations and horizontal alignment on the roadway centerline and at
each shoulder at the top of the subgrade. Where additional lanes or turnouts
are to be constructed, the Contractor will set blue tops at centerline, the normal
shoulder distance, and the extended shoulder distance or outside the additional
lane edge.
The transverse distance between blue tops will not exceed 20 feet. The
Contractor will be required to set intermediate blue tops when the transverse
distance is greater than 20 feet. When intermediate blue tops are required, the
94131326.docx 4
Contractor will set the intermediate blue tops at locations approved by the
Engineer.
The blue top grade stakes will be set at 100-foot intervals on tangents and 50-
foot intervals on horizontal curves. The horizontal tolerance for blue tops is ±0.2
foot and the vertical tolerance is ±0.02 foot.
The Contractor will retain the shoulder blue tops and guards through placement
of the granular material.
The Contractor will not be required to set grade stakes at the top of the base
course. If the Contractor deems it necessary to place grade stakes to achieve
typical section as per section 260.3 A of the specifications, the staking will be
incidental to the contract unit price for base course.
The Department will not provide grade stake notes. The Contractor is
responsible to generate the grade staking notes using the typical sections and
the existing field conditions.
3. Miscellaneous Staking: Miscellaneous staking includes the following work:
a. Easement line for items including, but not limited to, setting temporary
fence, utility relocation, and landowner reference and property use;
b. Clearing line for items identified by the clearing contract unit item when
provided in the plans;
c. Approach road staking and all tie-in checks. The Contractor will submit
profiles and elevations of all approach roads and other tie-ins throughout
the project to the Engineer at least 3 business days prior to staking;
d. Topsoil measurement and computation of quantities;
e. Special ditch staking;
f. Staking of signs, delineators, pavement markings, guardrail, curb & gutter,
light poles, conduit, junction boxes, and related items (Staking is for all
aspects, i.e. detours, temporary and permanent);
g. Right-of-way staking including fence post panels;
h. Pipe and storm sewer staking including drop inlets, manholes, cattle
passes, and related items. If additional pipe, storm sewer, drop inlets,
manholes, or cattle passes are required which are not shown on the plans,
the staking will be paid for at the contract unit price per hour for Engineer
Directed Surveying/Staking;
i. Mark limits of removal items (trees, foundations, curb & gutter, sidewalk,
etc.);
j. Detours, roadway diversions, and crossovers. (This work includes all design
and staking notes required to design and stake the detour, roadway
diversion, or crossover in accordance with the plan requirements. The
Contractor will submit the completed design including profile and alignment
and staking notes to the Engineer at least 3 business days prior to staking.);
94131326.docx 5
k. Final and original cross sections of Contractor and State furnished borrow
pits and computations. The Contractor will perform earthwork computations
by the average end area method, surface-to-surface method, or alternate
computation method approved by the Engineer;
l. Resetting horizontal and vertical control, if disturbed;
m. Approach slab and sleeper slab staking;
n. Staking of sidewalks and curb ramps; and,
o. Staking of steps and wheel chair ramps.
The Contractor will perform the pipe staking so the pipe will fit the field
conditions. The plans show only approximate pipe locations and grades. The
Contractor will not install pipe prior to gaining the Engineer’s approval of minor
location and grade adjustments necessary for proper staking of the pipe.
The Contractor will stake the slope catch points to determine the inlet and outlet
locations, set reference stakes for the inlet and outlet locations, and stake
ditches and special inlet and outlet grades to ensure proper drainage. The
staking of manholes and drop inlets will be included in pipe and storm sewer
staking. The Contractor will stake precast cattle passes similar to drainage
pipes.
The horizontal tolerance for the pipe and storm sewer staking is 0.05 foot and
the vertical tolerance is 0.03 foot.
The Contractor will keep pipe staking notes on a DOT Form 214.
4. Engineer Directed Surveying/Staking: The use of the engineer directed
surveying/staking contract item is intended for surveying/staking not included
in the plan notes and this special provision. The Contractor may use a survey
crew to perform additional survey/staking work caused or required by the
Department. The Engineer will use a written order to authorize the hourly
engineer directed surveying/staking item and describe the surveying/staking
work required of the Contractor.
D. METHOD OF MEASUREMENT
Refer to the Table of Contractor Staking in the plans for more detail on how
quantities were calculated.
1. Grade Staking: The Department will not measure grade staking. The
Department will pay the plan quantity as the final quantity unless the Engineer
orders additional grade staking in writing.
The Department will consider a two-lane roadway as one set of grade stakes.
The Department will proportionately increase the plan quantity for multi-lane
roadways in excess to two-lanes as shown in the table of construction staking
94131326.docx 6
(lane factor). For example, a three-lane roadway is equivalent to 1.5 times the
quantity for a two-lane roadway. On projects requiring grade staking on ramps,
the Department will consider ramps as a two-lane roadway for measurement
as shown in the table of construction staking. The Department will not consider
Acceleration/deceleration lanes and turning lanes for intersecting roads, and
median crossovers as an additional roadway.
2. Miscellaneous Staking: The Department will not measure miscellaneous
staking. The Department will pay the plan quantity as the final quantity.
3. Engineer Directed Surveying/Staking: The Department will measure
engineer directed surveying/staking to the nearest 0.1 hour with the following
restrictions:
The use of engineer directed surveying/staking will be for the work ordered by
the Engineer. The measured quantity will be the actual time the survey crew is
working on the project, physically performing the field survey/staking work and
office time dedicated to the work specific to engineer directed
surveying/staking. The Department will not include travel time for the survey
crew in the measurement.
The Contractor will provide the Engineer documentation, such as an invoice,
showing the actual days/hours worked.
E. BASIS OF PAYMENT
Payment for all of the survey items will be considered full compensation for
furnishing all necessary personnel, vehicles, surveying equipment, supplies,
materials, recording fees, transportation, and incidentals to accurately and
satisfactory complete the work.
The Department reserves the right to omit any of these bid items without providing
compensation to the contractor if the Department deems the bid prices are
unreasonable.
1. Grade Staking: The Department will pay grade staking at the contract unit
price per mile. All cost for additional grade staking for acceleration/deceleration
lanes, turning lanes, intersecting roads, grade adjustments, and median
crossovers will be incidental to the contract unit price for grade staking. All
additional grade staking for intersections and medians will be incidental to the
roadway grade staking. Any additional staking the Contractor feels necessary
to complete the grade staking work is the responsibility of the contractor and
will be incidental to the contract unit price for grade staking.
2. Miscellaneous Staking: The Department will pay miscellaneous staking at the
contract unit price per mile.
94131326.docx 7
The Department will make partial payment as follows:
a. Upon submission of the name, experience, and qualifications of the
surveyor or engineer who will supervise the staking, the proposed starting
date, and the staking schedule, the Department will pay the Contractor 25
percent of the plan quantity for the miscellaneous staking.
b. The Department will make intermediate payments based on the amount of
the staking work completed.
c. The Department will make full payment at the plan quantity for
miscellaneous staking upon completion of all surveying and staking and
when the Contractor has furnished all field notebooks and records to the
Engineer.
The Department will not adjust the contract unit price or plan quantity for
miscellaneous staking due to overruns or under runs in the other contract items.
3. Engineer Directed Surveying/Staking: The Department will pay engineer
directed surveying/staking on an hourly basis as per the Price Schedule for
Miscellaneous Items. The value listed in the Price Schedule for Miscellaneous
Items includes salaries, travel time, equipment, staking supplies, payroll
additive, and all incidental expenses related to providing the survey crew.
* * * * *
South Dakota Department of Transportation
Better Lives Through Better Transportation
THE FOLLOWING UTILITY COMPANIES ARE INVOLVED ON
PROJECT: NH 0018(260)425, Turner County, PCN 06G3
The contractor shall contact the following utilities in a sufficient amount of time prior to starting work. The
companies will identify their facilities, and it is the responsibility of the contractor and the company to coordinate
their work to avoid damage to existing facilities and to allow for relocation of facilities as may be required for
grading work:
The following utilities were determined to be involved and were formally notified on October 8th, 2025, that if
their facility is located within the existing public right-of-way, any adjustment of their facility would have to be
accomplished at no cost to the State, within 90 days from receipt of the notice, unless other arrangements are
made with the Area Engineer.
(1) Mr. John Euchner
Southeastern Electric Cooperative, Inc.
47077 276th St
Lennox, SD 57039
O: (800) 333-2859
P: (605) 310-2684
E: JohnE@Southeastern.coop
Onsite Construction Contact:
Duane Pulse
P: 605-421-9769
E: duane@southeastern.coop
Southeastern has identified multiple underground powerline facilities within the project limits. Southeastern
has stated their facilities were placed at approximately a 4’ depth. Southeastern stated they have an
underground powerline crossing US Hwy 18 at approximately STA. 233+15, STA. 233+25, STA. 236+40 and STA.
246+26. At all four of these crossings Southeastern has requested to work with the SDDOT contractor to
relocate their facilities at these locations throughout the construction process. Southeastern stated that the
SDDOT plans showed one other underground powerline crossing at approximately STA. 235+40, Southeastern
stated that this is an abandoned powerline and does not have an active crossing at this location. Southeastern
currently provides electrical services for US Hwy 18 streetlighting. Southeastern intends to coordinate work
with the SDDOT contractor to disconnect and take down streetlights as needed. Southeastern has requested
a 2-week notice prior to construction. Southeastern’s onsite contact is Duane Pulse at 605-421-9769 or
duane@southeastern.coop. After Southeastern’s review of the highway construction plans,
adjustments/relocations will be necessary. Southeastern’s facilities cross US Hwy 18 are in existing public
right-of-way, any relocation/adjustment necessary to accommodate the highway construction will be
accomplished at no cost to the State and performed in coordination with the highway construction.
South Dakota Department of Transportation
Better Lives Through Better Transportation
(2) Mr. Jay Jorgensen
TM Rural Water District
110 North Main Street
PO BOX 445
PARKER, SD 57053-0445
O: (605)-297-3334
F: (605)-297-3332
jay.jorgensen@tmruralwater.com
Onsite Construction Contact:
Greg Simmermon
Cell: 605-321-5708
Greg.Simmermon@tmruralwater.com
TM Rural Water District (TM Rural Water) – TM Rural Water has identified 2 underground waterline crossings
within the project limits within the intersections of (Present US Hwy 18 and Iowa Avenue) and (Present US
Hwy 18 and Nebraska Avenue). TM Rural Water stated they potholed both crossings to obtain accurate depths
and locations. The first crossing at approximately STA. 236+78, TM Rural waterline was found to be at
approximately 69” depth or approximately 10” – 12” lower than the SDDOT’s new storm sewer elevation that
is to be placed. TM Rural Water understands that this waterline is in close proximity and has requested to
Protect-In-Place this waterline. TM Rural Water stated that this waterline is a 6” or 8” waterline encased in a
10” or 12” thick-walled PVC. TM Rural Water has stated that they will have an onsite technician present while
the SDDODT contractor works over the top of this waterline. The onsite contact TM Rural Water has
designated is Greg Simmermon and he can be reached by Cell: 605-321-5708 or by email at
Greg.Simmermon@tmruralwater.com. The second waterline identified by TM Rural Water is at approximately
STA. 241+70 and is a 4” waterline. TM Rural Water stated this waterline was found at approximately 79” depth
which, is approximately 20” below the SDDOT’s new storm sewer elevation. TM Rural Water stated that this
waterline is not in conflict at this location and should have plenty of clearance. After TM Rural Water’s review
of the highway construction plans, no adjustments/relocations should be necessary. As TM Rural Water’s
facilities cross Present US Hwy 18 and are in existing public right-of-way, any relocation/adjustment necessary
to accommodate the highway construction will be accomplished at no cost to the State and performed in
coordination with the highway construction.
(3) Mr. Jordan Huber
Bluepeak
5100 S Broadband Rd
Sioux Falls, SD 57108
O: (605) 498-4922
P: (605) 366-1360
E: Jordan.Huber@MyBluepeak.com
South Dakota Department of Transportation
Better Lives Through Better Transportation
Bluepeak has underground copper and fiber telecommunication cables located throughout the project limits.
Bluepeak has identified copper facilities (150 pr. - 24 ga. & a 50 pr. - 22 ga.) at approximately STA. 232+73.00
– 35’L to STA. 233+90 – 37’L. Lumen stated that these copper lines are out of the project limits and are not in
conflict with SDDOT construction. Bluepeak also identified a fiber crossing US Hwy 18 at approximately STA.
233+86, Bluepeak stated that this fiber was placed at approximately 60” depth. Bluepeak stated that their
fiber does not conflict with the SDDOT construction. The final crossing that Bluepeak identified an
underground copper facility (50pr. – 22 ga.) is at approximately STA. 241+52 where Bluepeak stated that at
this crossing the copper line was at an approximate 42” depth at the curbs and an a approximate 60” depth at
the middle of the road. Bluepeak stated that this location they found their facilities to not conflict with US
Highway 18’s construction. Bluepeak has facilities in existing public right-of-way which, after Bluepeak’s review
of the highway construction plans, no adjustment/relocation should be necessary. Bluepeak’s facilities are in
existing public Right-of-Way, any relocation/adjustment necessary to accommodate the highway construction
will be accomplished at no cost to the State and performed in coordination with the highway construction.
(4) City of Davis (City Council)
Bonnie Ballinger
P: 605-214-3108
E: cityofdavis@yahoo.com
The City has storm water sewers throughout the project limits. These facilities have been discussed and
disclosed to the SDDOT Road Designer. The City has stated that all conflicts with necessary relocations will be
coordinated and handled throughout the SDDOT construction process.
The requirements relating to Cooperation Between Contractors, as set forth in Section 5.7 of the Standards
Specifications for Roads and Bridges, 2025 edition, shall prevail throughout the limits of this project.
1
STATE OF SOUTH DAKOTA
DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISION
FOR
ACKNOWLEDGEMENT AND CERTIFICATION REGARDING
ARTICLE 3, SECTION 12
OF THE SOUTH DAKOTA CONSTITUTION
AUGUST 24, 2023
In accordance with the State of South Dakota Office of the Governor Executive Order
2023-13, the following will apply to all contracts:
The Contractor acknowledges and certifies that the following information is correct:
CERTIFICATION OF NO STATE LEGISLATOR INTEREST:
Contractor (i) understands neither a state legislator nor a business in
which a state legislator has an ownership interest may be directly or
indirectly interested in any contract with the State that was authorized
by any law passed during the term for which that legislator was
elected, or within one year thereafter, and (ii) has read South Dakota
Constitution Article 3, Section 12 and has had the opportunity to seek
independent legal advice on the applicability of that provision to this
contract. By signing this contract, Contractor hereby certifies that this
contract is not made in violation of the South Dakota Constitution
Article 3, Section 12.
It is understood and agreed that, if this certification is false, such false certification
will constitute grounds for the Department to terminate the contract.
The Contractor further agrees to provide immediate written notice to the
Department if during the term of the contract it no longer complies with this
certification and agrees such noncompliance may be grounds for contract
termination.
* * * * *
DOT-208
(11/25)
FUEL ADJUSTMENT AFFIDAVIT
Project Number
PCN
County
For projects let using the SDEBS) and in accordance with Section 9.10, the bidder is not required to notify
the Department at the time of submitting bids whether the Contractor will or will not participate in the fuel
cost adjustment program. Prior to execution of the contract, the successful bidder must submit this completed
form to the Department for approval. The Fuel Adjustment Affidavit will include the anticipated fuel cost of
subcontractors.
Does your company elect to participate in a fuel adjustment for this contract for the fuels that do not have a
fixed price? No adjustments in fuel prices will be made if “No” is checked.
Yes No
If yes, provide the total dollars for each of the applicable fuels. No adjustments in fuel price will be made for
the fuel types that are left blank or completed with a $0.00 value.
Diesel (x) $
Unleaded (y) $
Burner Fuel (z) $ Type of Burner Fuel Used:
Sum (x + y + z) = $
Note: The sum of the x, y, and z must not exceed 15% of the original contract amount.
The following must be completed regardless of whether the Contractor elects to participate in the fuel
adjustment affidavit
Under the penalty of law for perjury or falsification, the undersigned, ,
(Printed Name)
of ,
(Title) (Contractor)
hereby certifies that the documentation is submitted in good faith, that the information provided is accurate
and complete to the best of their knowledge and belief, and that the monetary amount identified accurately
reflects the cost for fuel, and that they are duly authorized to certify the above documentation on behalf of
the company.
I hereby agree that the Department or its authorized representative will have the right to examine and copy
all Contractor records, documents, work sheets, bid sheets, and other data p
- Enriched
- Yes
- Pdf Pages
- 61
- Work Desc
- Grading, C&G, Strm Swr, Light, SW & ACC
- Work Type
- Work Type 2 or Work Type 12 or Work Type 14
- Addendums
- 0
- Project No
- NH 0018(260)425
- Questions
- 0
- List Url Hint
- hc65bidletting/ebslettings1.aspx
- Letting Label
- November 4, 2026
- Categorized By
- llm