The project t includes the complete installation of 580 linear feet of 24” HDPE drain line. Included in this installation is 5 catch basins along with aprons to accept the stormwater runoff from the roadway section. The connection to the existing catch basin shall be at the southerly side of the entrance to the existing commercial use. As installation of the drain line progresses, it will be necessary to remove the existing line.
Delivery Method: Other
Documents: https://www.cityofeasley.com
Complete installation of 580 linear feet of 24-inch HDPE drain line, including 5 catch basins with aprons to accept stormwater runoff from the roadway section, connection to the existing catch basin at the southerly side of the entrance to the existing commercial use, and removal of the existing line as installation progresses.
We post new plumbing opportunities in South Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most South Carolina work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: City of Easley, retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.