The Work will include hydroexcavation of 577 LF of open channel at the Country Club II / Harbor View Rd drainage outfall, including traffic control and any necessary matting and dewatering, in order to re-establish the channel back to design conditions, as shown in the Drawings.
Delivery Method: Design-Bid-Build
Documents: https://www.charleston-sc.gov/bids.aspx?bidID=912
The Work will include hydroexcavation of 577 LF of open channel at the Country Club II / Harbor View Rd drainage outfall, including traffic control and any necessary matting and dewatering, in order to re-establish the channel back to design conditions, as shown in the Drawings. The contractor is to procure, install, and maintain the traffic control devices, including set-up, break-down and storage, as shown in the Traffic Control Plan, while the City acquires the SCDOT encroachment permit. Work is restricted to Monday through Friday, 9:00 a.m. to 2:00 p.m., during low tide events only.
We post new excavating opportunities in South Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most South Carolina work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: City of Charleston, retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.