The City of Georgetown is requesting fee proposals and qualifications from South Carolina state-licensed professional electrical engineering firms to address some of the electrical system deficiencies identified in the 2025 WWTP Electrical System Condition Assessment report. The study must be performed in all four electrical rooms located in the lab/office building, press building, electrical MCC building, and chlorine feed building.
Delivery Method: N/A
The contractor must provide all parts and labor to install a 4 ton split system at the Saleeby Center, including removing and disposing of the old HVAC unit. Specific tasks include removing the existing 4 ton split system, installing a new 4 ton split system heat pump with a minimum SEER2 rating of 14.3 using R454B refrigerant, installing a new line set, relocating the thermostat, installing a Siemens RDY 2000BN thermostat, installing a new drain pan and safety switches, reconnecting duct to existing duct work, and replacing the outside disconnect.
We post new hvac opportunities in South Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most South Carolina work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: City of Georgetown, retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.