The City of Georgetown seeks proposals from qualified, licensed contractors to provide landscape improvements along the shoreline within the Morgan Park beachfront area. In partnership with the Boyd Living Shoreline Restoration Group, the City is implementing enhancements to improve shoreline stability, environmental sustainability, and the site's overall appearance. The project will remove existing temporary sediment fencing and install a vegetated upland buffer along the shoreline.
Delivery Method: Other
Documents: https://www.georgetownsc.gov/governmental_services/departments/finance/bids__rfps.php
The contractor must provide all parts and labor to install a 4 ton split system at the Saleeby Center, including removing and disposing of the old HVAC unit. Specific tasks include removing the existing 4 ton split system, installing a new 4 ton split system heat pump with a minimum SEER2 rating of 14.3 using R454B refrigerant, installing a new line set, relocating the thermostat, installing a Siemens RDY 2000BN thermostat, installing a new drain pan and safety switches, reconnecting duct to existing duct work, and replacing the outside disconnect.
We post new hvac opportunities in South Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most South Carolina work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: City of Georgetown, retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.