The project shall consist of extending hot water service toward the new STEM building and Thomas Cooper Library (TCL). The AE shall provide investigation, engineering, design, permitting support, bid documents and construction-phase services for the West Energy Tunnel Low Temperature Hot Water (LTHW) piping installation.
Delivery Method: N/A
The AE shall provide investigation, engineering, design, permitting support, bid documents and construction-phase services for the West Energy Tunnel Low Temperature Hot Water (LTHW) piping installation, extending hot water service toward the new STEM building and Thomas Cooper Library (TCL).
We post new plumbing opportunities in South Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most South Carolina work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: University of South Carolina (solicitation H27-N462-LC), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.