Demolish and replace the 4000A, 208V switchgear and replace with new. Demolish and replace multiple panels and miscellaneous apparatus on multiple building levels per GWA design drawings AD#68287 Cancellation of solicitation
Delivery Method: Design-Bid-Build
Construction Cost Range: 1.5M to 2.2M
Documents: Clemson University Facilities Website
Demolish and replace the 4000A, 208V switchgear and replace with new. Demolish and replace multiple panels and miscellaneous apparatus on multiple building levels per GWA design drawings.
Most South Carolina work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Clemson University (solicitation H12-9960-AiM-3604), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.