The Office of the State Engineer (OSE) is updating the list of firms qualified to perform environmental studies for state land acquisitions in South Carolina.
The place of performance is statewide in South Carolina.
Resumes are due by December 3, 2026, at 3:00 PM.
The solicitation was posted on November 3, 2026.
Firms must submit a Standard Federal Form 330, contact information, a residency certification, and a response to selection criteria per SC Code § 11-35-3220.
Requirement: To be considered for selection, persons or firms must be properly licensed in accordance with the requirements of Title 40 of the SC Code of Laws, as amended at the time of resume submission.
Licence
properly licensed in accordance with the…
Documents
1 file
These takeaways are AI-generated and may be incomplete or wrong. Always verify every detail against the official documents before you bid.
Bidding this one? Get the bid bond — free.The documents here don’t name one, so read them yourself — but public work almost always wants a bid bond with the bid.
Submit a current Standard Federal Form 330 (SF 330) demonstrating qualifications.
Provide the name and contact information, including email, of a primary contact.
Submit a certification stating whether the firm is a resident of South Carolina per SC Code § 11-35-3215.
Respond to the selection criteria set forth in SC Code § 11-35-3220.
Requirements
From the documents
Licence
properly licensed in accordance with the requirements of Title 40 of the SC Code of Laws
Posted Scope of Work
In accordance with SFAA Policy For Obtaining Environmental Studies for State Land Acquisitions, OSE needs to update the list of firms qualified to perform these studies. Firms already on this list DO NOT need to resubmit information. (Current list is located at: https://procurement.sc.gov/files/2024-26List_0.pdf) Firms that have multiple offices must list complete information for each office they need listed, including a contact with email address.
Delivery Method: N/A
Scope, read from the documentsAI-generated
Firms are invited to submit qualifications to be placed on a list for performing environmental studies for state land acquisitions. The studies must follow ASTM E1527-13 or ASTM E2247-08 (or more current versions) and the SFAA Policy. Firms already on the current list do not need to resubmit.
More architecture and design bids in South Carolina, weekly.
We post new architecture and design opportunities in South Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Questions & answers
AI-generated
What is the deadline for submitting qualifications?
The resume deadline date is 12/03/2026 at 03:00 PM.
Who is the agency project coordinator for this solicitation?
The agency project coordinator is Michael Cooper, email mcooper@mmo.sc.gov, telephone (803) 737-1683.
What must firms submit to be considered?
Firms must submit a current Standard Federal Form 330, the name and contact information including email of a primary contact, a certification stating whether the firm is a resident of South Carolina, and a response to selection criteria set forth in SC Code § 11-35-3220.
What licensing is required?
Persons or firms must be properly licensed in accordance with the requirements of Title 40 of the SC Code of Laws, as amended at the time of resume submission.
Full source recordEvery field Office of the State Engineer published, untouched
In accordance with SFAA Policy For Obtaining Environmental Studies for State Land Acquisitions, OSE needs to update the list of firms qualified to perform these studies. Firms already on this list DO NOT need to resubmit information. (Current list is located at: https://procurement.sc.gov/files/2024-26List_0.pdf) Firms that have multiple offices must list complete information for each office they need listed, including a contact with email address.
Surety · through Light RFPprequal free · bid bond free · p&p 3%
Need a bond for this one? The bid bond is free.
Most South Carolina work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
You can have the bid bond before the deadline — one form, soft credit pull, A-rated surety. Prequalify instead and you skip the application on every bond after this one.Get the bid bond — free →Prequalify once instead (free) →What’s a good guy letter?
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Not finding it?Describe the work in your own words and we’ll search the whole site.Search with AI →
Source: Office of the State Engineer (solicitation E55-N001-MC), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.