The Town of Bluffton and Beaufort County are jointly undertaking construction of the Holly Hill Lane extension to the Beaufort County park property and the Anthem Drive extension to the Beaufort County park property in the New Riverside area in Bluffton, SC.
Bids are due November 24, 2026 at 2:00 pm; a non-mandatory pre-bid walk is scheduled for October 28, 2026 at 1:00 pm.
The procurement method is Design-Bid-Build.
Bids are received online via BidNet Direct.
The contact for this solicitation is Felicia Roth, Director of Compliance and Contracts, at froth@townofbluffton.com or 843-706-7816.
Pre-bid
Oct 28
Method
Design-Bid-Build
Documents
1 file
These takeaways are AI-generated and may be incomplete or wrong. Always verify every detail against the official documents before you bid.
Bidding this one? Get the bid bond — free.The documents here don’t name one, so read them yourself — but public work almost always wants a bid bond with the bid.
Submit a sealed bid for the construction of the Holly Hill Lane extension to the Beaufort County park property and the Anthem Drive extension to the Beaufort County park property in the New Riverside area.
Submit bids online via BidNet Direct by November 24, 2026 at 2:00 pm.
Posted Scope of Work
The Town of Bluffton and Beaufort County are jointly undertaking the construction of the right-of-way development, which is the Holly Hill Lane extension to the Beaufort County park property and the Anthem Drive extension to the Beaufort County park property in the New Riverside area. There is a non-mandatory bid walk on 10/28/2026 at 1:00 pm.
The Town of Bluffton and Beaufort County are jointly undertaking the construction of the right-of-way development, which is the Holly Hill Lane extension to the Beaufort County park property and the Anthem Drive extension to the Beaufort County park property in the New Riverside area. There is a non-mandatory bid walk on 10/28/2026 at 1:00 pm.
Surety · through Light RFPprequal free · bid bond free · p&p 3%
Need a bond for this one? The bid bond is free.
Most South Carolina work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
You can have the bid bond before the deadline — one form, soft credit pull, A-rated surety. Prequalify instead and you skip the application on every bond after this one.Get the bid bond — free →Prequalify once instead (free) →What’s a good guy letter?
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Not finding it?Describe the work in your own words and we’ll search the whole site.Search with AI →
Source: Town of Bluffton (solicitation 2027-17), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.