2027 CLARENDON PAVEMENT IMPROVEMENT
Counties: Clarendon
SC File No.: 1478230
Project No.: P045465
Completion Date: 10/31/2027
Funding: ST
DBE Goal: 0.00%
Approx. Length: 13.2100 miles
Letting: November 10, 2026 at 2:00 pm
The work includes mobilization, bonds and insurance, construction stakes, removal and disposal of existing pavement, removal of existing guardrail, unclassified excavation, borrow excavation, additional rock for full depth reclamation, maintenance stone, cement modified recycled base, Portland cement for cement modified recycled base course, HMA shoulder widening course, liquid asphalt binder PG64-22, aramid fiber, full depth asphalt pavement patching (4" and 8" uniform), milling existing asphalt pavement (1.5", 1.75", 2.0", and variable), asphalt surface courses (Type B, C, D), driveway paving, traffic control, permanent construction signs, pavement markings (fast dry paint and permanent thermoplastic), bike lane symbols and arrows, permanent pavement markers, milled-in rumble strips, conduit and copper wire installation, sawcut for loop detector, concrete sidewalk, detectable warning material, concrete median, pedestrian ramp construction, surface applied detectable warning, reseal deck expansion joint, guardrail and end treatments, permanent grassing, and silt fence.
We post new asphalt opportunities in South Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: South Carolina Department of Transportation (solicitation 20261110-040), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.