INTERSECTION IMPROVEMENT - SC 5 AT S- 358 (STEEL HILL ROAD)
Counties: Lancaster
SC File No.: 2973031
Project No.: P042284
Completion Date: 5/31/2028
Funding: FED
DBE Goal: 0.00%
Approx. Length: 0.6000 miles
Letting: October 13, 2026 at 2:00 pm
The work includes mobilization, bonds and insurance, construction stakes, utility staking, clearing and grubbing, removal and disposal of existing pavement, removal of existing guardrail, unclassified excavation, borrow excavation, fine grading, maintenance stone, liquid asphalt binder, full depth asphalt patching, milling existing asphalt pavement, asphalt base, intermediate, and surface courses, driveway paving, traffic control, permanent construction signs, pavement markings (temporary and permanent thermoplastic), pavement markers, milled-in rumble strips, flat sheet signs, U-section posts, drainage items (pipe, drop inlets, concrete collars, beveling, flume, bituminous curb), rip-rap, geotextile, guardrail systems, right-of-way markers, seeding, erosion control (blankets, hydraulic products, silt fence, cleaning basins, inlet filters, stabilized construction entrance), and related items.
We post new asphalt opportunities in South Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most South Carolina work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: South Carolina Department of Transportation (solicitation 20261013-040), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.