S-978 TUGALOO ROAD BRIDGE REPLACEMENT IN GREENVILLE
Counties: Greenville
SC File No.: 2378290
Project No.: P043981
Completion Date: 7/31/2027
Funding: FED
DBE Goal: 0.00%
Approx. Length: 0.1000 miles
Letting: October 13, 2026 at 2:00 pm
The work includes mobilization, bonds and insurance, construction stakes, utility staking, CPM progress schedule, clearing and grubbing, removal and disposal of fence, existing asphalt pavement, and existing bridge, unclassified excavation, borrow excavation, fine grading, maintenance stone, liquid asphalt binder, full depth asphalt patching, asphalt base, intermediate, and surface courses, traffic control, barricades, permanent construction signs, flashing lights, pavement markings (temporary and permanent), flat sheet signs, U-section posts, furnish and install PVC conduit, concrete for structures, reinforcing steel for bridge, cored slabs, MASH concrete barrier parapet/railing wall, pile driving set-up, pile tips, steel H bearing piling, smooth wall pipe, beveling of pipe end, slope flume, concrete curb and gutter, elastomeric bearing, liquid membrane waterproofing, temporary pipe slope drain, rip-rap, geotextile, guardrail end treatments, thrie-beam barrier connector, flume inlet, non-mow strip, barbed wire fence, temporary barrier fence, resetting steel gates, right of way markers and plat, permanent and temporary cover, fertilizer, agricultural granular lime, selective watering, mowing, turf reinforcement matting, hydraulic erosion control product, sediment tubes, silt fence, cleaning silt basins and inlet structure filters, aggregate for erosion control, and stabilized construction entrance.
We post new asphalt opportunities in South Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most South Carolina work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: South Carolina Department of Transportation (solicitation 20261013-030), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.