We'll email you new excavating opportunities in Florida as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
Murphy Pipeline Contractors seeks MBE/WBE and Section 3 certified subs/suppliers for Highlands Homes Water Distribution Upgrades, Sebring, FL: as-built survey, MOT, erosion control, HDPE pipe/fittings, valves/hydrants, directional bore, services/meters, grout/abandon mains, testing, asphalt/concr
Place of Performance: Florida
The work for the Highlands Homes Water Distribution Upgrades in Sebring, FL includes as-built survey, maintenance of traffic (MOT), erosion control, HDPE pipe and fittings, valves and hydrants, directional bore, services and meters, grout and abandonment of mains, testing, asphalt and concrete repair, and sod.
Most Florida work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Murphy Pipeline Contractors, LLC (SUBNet), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.