1.01 PROJECT OVERVIEW
A. Perform the following Electrical Studies for the electrical power system in accordance with the Contract Document. The following studies will be referred to as Electrical Studies: Short Circuit Study, Load Flow Study, Equipment Evaluation Study, Coordination Study, Arc Flash Hazard Analysis and Mitigation Report, and Protective Relaying Device Analysis. The Electrical Studies shall be using the latest version of SKM Systems Analysis, Inc., Power Tools for Windows (PTW) software programs.
B. The Engineering Firm shall perform a full electrical study or a Five-Year Review for DOU facilities.
A Full Electrical Study will be conducted as specified in these specifications and include data collection and the creation of all SKM files. A full electrical study will require all work listed in 1.01A.
The Five-Year Review Study will be conducted as specified in these specifications with the exception of data collection. The City will provide the existing SKM files for each facility where a Five-Year Review will be conducted. The City will verify the validity of the single line provided and the overcurrent protective devices. The City will provide all data collection. A five-year electrical study will require all work listed in 1.01A.
C. Provide an electronic copy of the electrical studies on USB or shared drive. In addition, electronic files shall include all SKM files, library backup files, and all scenarios used to create the study.
Additional Details
Department: DOU - Utilities Department
License Required: Professional Engineer License (PE)
Q&A Deadline: October 28, 2026 at 3:00 PM
Required Submittals: Cost File, Response File
Perform Short Circuit Study, Load Flow Study, Equipment Evaluation Study, Coordination Study, Arc Flash Hazard Analysis and Mitigation Report, and Protective Relaying Device Analysis using the latest version of SKM Power Tools for Windows; perform Full Electrical Studies including data collection and creation of SKM files or Five-Year Reviews using City-provided SKM files and data collection; provide electronic copies on USB or shared drive including SKM files, library backup files and scenarios.
We post new roofing opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most California work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Contact names and phone numbers are on the official posting.