The project consists of safety improvements of three on-ramps to Route 78 in Westerly, Rhode Island.
These improvements primarily consist of full-depth pavement widening of the roadway, constructing
acceleration lanes for these ramps, extending the merging space available, and removing and relocating
light poles.
The three (3) project locations are as follows:
• RI Route 78 Westbound On-Ramp, at High Street/Upper High Street
• RI Route 78 Eastbound On-Ramp, at RI Route 3/Nooseneck Hill Road/Ashaway Road
• RI Route 78 Eastbound On-Ramp, at RI Route 91/Westerly-Bradford Road/Oak Street
The project provides safety improvements at three Route 78 on-ramps in Westerly, primarily full-depth pavement widening, constructing acceleration lanes, extending merging space, and removing and relocating light poles, with associated earthwork, drainage, guardrail, curb, retaining wall, lighting and electrical, signing, pavement markings, erosion controls, plantable soil and seeding, field office, mobilization and traffic protection.
We post new asphalt opportunities in Rhode Island as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"N""2026-CT-047 ADV CS Pages.pdf"1795012949000179501294900019936821795012949000"Y"1120002185936684"application/pdf"1993682"ORG""2026-CT-047 ADV CS Pages.pdf""N""2026-CT-047 ADV JS Pages.pdf"1795009625000179500962500019935821795009625000"Y"1120002246295"application/pdf"1993582"ORG""2026-CT-047 ADV JS Pages.pdf""N""2026_February_Standard_Specification.pdf"1794237159000179423715900019869491794237159000"Y"112000224317332"application/pdf"1986949"ORG""2026_February_Standard_Specification.pdf""N""2026-CT-047 ADV Plans.pdf"1795009712000179500971200019935831795009712000"Y"112000239365386"application/pdf"1993583"ORG""2026-CT-047 ADV Plans.pdf""N""2026-CT-047 ADV DOQ.pdf"1795009622000179500962200019935811795009622000"Y"11200024023009"application/pdf"1993581"ORG""2026-CT-047 ADV DOQ.pdf""N""2026-CT-047 Federal Wage Rates.pdf"1794243230000179424323000019873211794243230000"Y"112000257154"application/pdf"1987321"ORG""2026-CT-047 Federal Wage Rates.pdf""N""RIDOT_Required_Forms_Federal.pdf"1794249027000179424902700019874591794249027000"Y"1120002754893"application/pdf"1987459"ORG""RIDOT_Required_Forms_Federal.pdf"2164340{"name":"each","unit":19,"abbrev":"EA"}"201.0303"019"Y""Y"0191514536770888111458961305731701792{"name":"each","unit":19,"abbrev":"EA"}"201.0610"019"N""N"0191114536770888111460491305731711922{"name":"lump sum","unit":860,"abbrev":"LS"}"937.0100"0860"N""N"0860114536770888111460781305732117795{"name":"each","unit":19,"abbrev":"EA"}"702.0502"019"Y""Y"019314536770888111460651305731707749{"name":"each","unit":19,"abbrev":"EA"}"702.0501"019"N""N"019314536770888111488571305731747466{"name":"each","unit":19,"abbrev":"EA"}"T15.0200"019"Y""Y"-119814536770888111488611305731713976{"name":"each","unit":19,"abbrev":"EA"}"T05.0101"019"N""N"019814536770888111460851305731715566{"name":"each","unit":19,"abbrev":"EA"}"T08.0100"019"N""N"019814536770888111460911305731912187{"name":"square yard","unit":70,"abbrev":"YDK"}"401.0510"070"Y""Y"0701289014536770888111461001305731908272{"name":"each","unit":19,"abbrev":"EA"}"707.0100"019"Y""Y"019614536770888111460681305731506465{"name":"each","unit":19,"abbrev":"EA"}"919.0101"019"Y""Y"019414536770888111460741305731711802{"name":"square yard","unit":70,"abbrev":"YDK"}"401.0520"070"N""N"070228014536770888111460561305731701753{"name":"linear foot","unit":34,"abbrev":"LF"}"201.0414"034"N""N"0348014536770888111460451305731247741{"name":"linear foot","unit":34,"abbrev":"LF"}"206.0301"019"Y""Y"019407014536770888111460511305731722096{"name":"linear foot","unit":34,"abbrev":"LF"}"906.0320"034"N""N"03445014536770888111460721305731911992{"name":"each","unit":19,"abbrev":"EA"}"704.0500"019"Y""Y"019514536770888111460671305731711588{"name":"each","unit":19,"abbrev":"EA"}"T16.0200"019"N""N"0191314536770888111460961305731604288{"name":"month","unit":895,"abbrev":"MON"}"929.0110"019"Y""Y"0193614536770888111460761305731529079{"name":"cubic yard","unit":1089,"abbrev":"YDQ"}"202.0100"019"Y""Y"019184014536770888111460501305731713877{"name":"each","unit":19,"abbrev":"EA"}"708.9044"019"N""N"0191014536770888111460701305732164475{"name":"lump sum","unit":860,"abbrev":"LS"}"999.9902"019"N""N"019114536770888111460801305731721682{"name":"each","unit":19,"abbrev":"EA"}"T08.0050"019"N""N"019814536770888111488601305732164477{"name":"linear foot","unit":34,"abbrev":"LF"}"T06.9901"019"N""N"019672014536770888111460871305731528260{"name":"cubic yard","unit":1089,"abbrev":"YDQ"}"302.0100"019"Y""Y"01980014536770888111460541305731705813{"name":"linear foot","unit":34,"abbrev":"LF"}"T06.0102"034"N""N"-13485814536770888111460861305731703765{"name":"each","unit":19,"abbrev":"EA"}"T18.0410"019"N""N"0191514536770888111460971305731365450{"name":"actual ton","unit":113,"abbrev":"26"}"401.3100"019"Y""Y"019112014536770888111460581305732164429{"name":"lump sum","unit":860,"abbrev":"LS"}"911.9901"019"N""N"019114536770888111459951305731758866{"name":"square yard","unit":70,"abbrev":"YDK"}"920.0320"019"Y""Y"0191014536770888111488581305731703769{"name":"lump sum","unit":860,"abbrev":"LS"}"T20.0102"019"Y""Y"019114536770888111460991305731720126{"name":"square yard","unit":70,"abbrev":"YDK"}"201.0321"070"N""N"070104014536770888111460441305731726104{"name":"each","unit":19,"abbrev":"EA"}"702.1000"019"N""N"019214536770888111460661305731745455{"name":"linear foot","unit":34,"abbrev":"LF"}"901.1000"019"Y""Y"01972014536770888111460711305732167203{"name":"actual ton","unit":113,"abbrev":"26"}"401.1000"019"Y""Y"019144014536770888111460571305731722140{"name":"each","unit":19,"abbrev":"EA"}"T07.0101"019"N""N"019314536770888111460881305731380819{"name":"linear foot","unit":34,"abbrev":"LF"}"708.9040"019"Y""Y"019152014536770888111460691305732164478{"name":"lump sum","unit":860,"abbrev":"LS"}"T08.9901"019"N""N"019114536770888111460931305732164474{"name":"lump sum","unit":860,"abbrev":"LS"}"999.9901"019"N""N"019114536770888111460791305731575716{"name":"each","unit":19,"abbrev":"EA"}"209.0200"019"N""N"0191514536770888111460521305731713863{"name":"each","unit":19,"abbrev":"EA"}"701.7711"019"N""N"019114536770888111460631305731430766{"name":"cubic yard","unit":1089,"abbrev":"YDQ"}"603.1000"019"Y""Y"019614536770888111460611305731747465{"name":"square foot","unit":74,"abbrev":"FTK"}"T15.0100"019"Y""Y"01920014536770888111460941305731705220{"name":"square yard","unit":70,"abbrev":"YDK"}"L01.0104"070"Y""Y"0701000014536770888111460821305731723623{"name":"linear foot","unit":34,"abbrev":"LF"}"T04.5001"034"N""N"034300314536770888111488591305731715413{"name":"lump sum","unit":860,"abbrev":"LS"}"936.0110"0860"N""N"0860114536770888111460771305732164479{"name":"linear foot","unit":34,"abbrev":"LF"}"201.0415"019"Y""Y"01973014536770888111460461305732164471{"name":"linear foot","unit":34,"abbrev":"LF"}"701.0300"019"N""N"0196014536770888111460621305731717916{"name":"each","unit":19,"abbrev":"EA"}"211.0200"019"N""N"019414536770888111460531305731705834{"name":"linear foot","unit":34,"abbrev":"LF"}"T20.0101"019"Y""Y"0191100014536770888111460981305732117816{"name":"square yard","unit":70,"abbrev":"YDK"}"L02.0107"019"Y""Y"0191000014536770888111460831305731703761{"name":"each","unit":19,"abbrev":"EA"}"T15.3000"019"N""N"0191214536770888111460951305731760371{"name":"linear foot","unit":34,"abbrev":"LF"}"201.0436"019"Y""Y"01937014536770888111460481305732167198{"name":"each","unit":19,"abbrev":"EA"}"201.0428"019"Y""Y"019214536770888111460471305732167221{"name":"actual ton","unit":113,"abbrev":"26"}"402.9901"019"N""N"019112014536770888111488621305731913191{"name":"lump sum","unit":860,"abbrev":"LS"}"212.2200"019"Y""Y"019114536770888111460431305731725766{"name":"each","unit":19,"abbrev":"EA"}"T08.2031"019"N""N"019314536770888111460921305731120002111200025Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: State of Rhode Island (bid 145367), retrieved via the Rhode Island WebProcure bid board. View the official posting, and always confirm requirements and deadlines with the issuing agency.