The following statements will supersede the standard language in the Selection Criteria concerning a minimum of three (3) ranked firms: The District will establish an order of ranking of four (4) firms from one (1) Statement of Interest in regard to the agreements: E06556 & E06557. The top two (2) Teams will each be ranked 1st per Bridge Group/Agreement. The 3th & 4th ranked Teams will become #2 & #3 under each agreement. At a minimum a Team can focus their SOI on the structures in E06556 if they choose to. If a Team is not interested in one of the agreements, then this should be clearly stated.
The Department of Transportation will retain engineering firms for the following:
The Department will establish an order of ranking of a minimum of (3 ) firms for the purpose of negotiating agreements based on the Department's evaluation of the statements of interest received in response to this solicitation. The final ranking will be established directly from the statements of interest. Technical proposals will not be requested prior to the establishment of the final ranking.
The following factors, listed in order of importance, will be considered by the Department during the evaluation of the business partners submitting statements of interest:
Work to include the preservation, rehab or replacement of structures. Preliminary Engineering, Environmental Services, Final Design, Right of Way Acquisition and Construction Services including but not limited to the following tasks: survey, line & grade, utilities, environmental studies, wetland delineation, pavement design, TS&L, design field view, right of way plans, traffic control plans, cultural resource studies, roadway plans, foundation reports, structure plans, constructability reviews, PS&E.
Projects could follow the Minor Projects Design Procedures, this will be decided during the Scope of Work Meeting.
Firms responding to this advertisement that are providing ROW services must be registered ECMS business Partners and on the Department's current ITQ for acquisition consultants.
REVISION TO GENERAL REQUIREMENTS
CHANGE:
TO:
Limited to a maximum of five (5) (8 1/2" x 11") pages, typed using 12 font size or larger. The font size will be checked for the entire pdf document (including body of SOI, page numbers, headers, footers, tables and charts) by using Adobe Pro or similar software. If Adobe Pro is unavailable, the project manager (PM) will convert the pdf document to a word document. The PM will open the word document and verify the text size. The first four (4) pages will contain the consultant's approach to the project. The only information allowed on the fifth page is the conflict of interest statements and the consultant's position regarding content that it considers to be confidential proprietary information, trade secrets or otherwise exempt from public access.
All questions and answers are required to go through ECMS's "Questions and Responses" forum.
The statement of interest, at a minimum, should indicate how the selected firm will accomplish the tasks outlined and provide the services as detailed. The anticipated duration of the agreement is 6 years.
The goal for Disadvantaged Business Enterprise (DBE) participation in this agreement shall be 0 of the total agreement cost. Cost included in a DBE firm's price proposal as direct cost of work and services by others shall not count as DBE participation in this agreement, unless completed by a DBE firm. Additional information concerning DBE participation in this agreement is contained in the General Requirements and Information Section referenced below.
Additional information regarding this Agreement/Advertisement and Statement of Interest requirements are contained in the [General Requirements](SVCOMFileCabinet?action=GETURL&FILE_NAME=Advertisement General Requirements - Non Construction Inspection Services&FILE_DATE=06/26/2026) document.
Work includes Preliminary Engineering, Environmental Services, Final Design, Right of Way Acquisition and Construction Services for 12 parts: SR 1015/270 over I-81 (PE, FD, ROW, CS), SR 247/252 over Tunkhannock Creek (PE, FD, ROW, CS), and SR 2002 BR W BR Wallenpaupak Creek (PE, FD, ROW, CS). Tasks include survey, line & grade, utilities, environmental studies, wetland delineation, pavement design, TS&L, design field view, right of way plans, traffic control plans, cultural resource studies, roadway plans, foundation reports, structure plans, constructability reviews, and PS&E.
We post new architecture and design opportunities in Pennsylvania as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Pennsylvania work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Pennsylvania Department of Transportation (PennDOT) (solicitation PENNDOT_ADV_19424), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.