- Detail
- Parts
- Name
- CI for GRP 111-27-7135-1 (SR 51-A22)
- Index
- 1
- Counties
- Allegheny County
- Sr Section
- 51/A22
- Project Time
- Day and Night time
- Anticipated Ntp
- March 1, 2027
- Project Description
- ECMS 108640, GRP 111-27-7135-1 (SR 51-A22): For the milling, resurfacing, shoulder repair, base repair, drainage, guide rail, pavement marking, and other miscellaneous construction, on various routes totaling a length of 15,312 linear feet (2.9 miles) as indicated on the approved drawings included in the bid package for GROUP PROJECT 111-27-7135-1 in ALLEGHENY COUNTY, CORAOPOLIS BOROUGH, MOON TOWNSHIP and STOWE TOWNSHIP, Commonwealth of Pennsylvania.This project being situated as follows:SR 0051 WB - Fourth Avenue / University Boulevard (WB) from 150 ft east of Vine Street (0670/0000) to Thorn Street (0720/0720)SR 0051 EB - Fifth Avenue (EB) from 150 ft East of Vine Street (0671/0000) to Barn Street (0691/0358).SR 3092 - Broadway Street / 7th Street / Tunnel Way from Pine Hollow Rd (0010/0000) to SR 51 (0040/1923).Anticipated Completion Date: October 13, 2027
- Staff
- Resumes
- 3
- Inspectors
- 3
- Description
- TCI (Transportation Construction Inspector)
- Resumes
- 1
- Inspectors
- 1
- Description
- TCIS (Transportation Construction Inspector Supervisor)
- Status
- Published
- Heading
- Advertisement - Project Specific - Construction Inspection Services
- History
- Published
- 10/26/2026
- Soi Deadline
- 11/05/2026
- Contacts
- Org
- 1100
- Name
- Nicole R. Perry
- Email
- niperry@pa.gov
- Phone
- (412) 429-4881
- Criteria
- Weight
- 30%
- Description
- Review of inspector's resumes, including the length of employment with the submitting firm, with emphasis on construction inspection capabilities and specific project work assignments and timeframes.
- Weight
- 15%
- Description
- Work experience and supervisory experience on PennDOT projects indicating an understanding of PennDOT's requirements, policies, and specifications.
- Weight
- 10%
- Description
- Firm's commitment to a quality control and quality assurance process as demonstrated in the firm's Statement of Interest and the firm's QA/QC Plan on file in ECMS with PennDOT.
- Weight
- 10%
- Description
- Number of NICET, NECEPT Bituminous, and PennDOT Concrete Field Testing Technician Certified Inspectors in each classification.
- Weight
- 10%
- Description
- How will Management and Inspection staff work with PennDOT to assure the contractor meets the project milestones?
- Weight
- 10%
- Description
- How did the team perform on past projects?
- Weight
- 10%
- Description
- Describe the consultant team's commitment to providing continuing education for the inspection staff.
- Weight
- 5%
- Description
- How will the Inspection staff work with PennDOT to assure contractor compliance with environmental commitments, mitigation and permit conditions?
- Weight
- 100%
- Description
- Weight Total:
- Equipment
- Qty
- 4
- Description
- iPads
- Max Reimbursement
- As per invoice (iPad Usage)
- Qty
- 4
- Description
- Cellular Phones
- Max Reimbursement
- As per invoice (Cell Phone Usage)
- Agreements
- Name
- Construction Inspection for GRP 111-27-7135-1 (SR 51-A22)
- Number
- E06828
- Staff Intro
- The qualifications and experience required of the firm's inspectors will be established by the Department, and the qualifications of the firm's proposed employees will be reviewed and approved by the Department.
It is anticipated that a supplementary construction inspection staff for this assignment will consist of the following number of inspectors who meet the requirements for the inspection classifications as detailed in the General Requirements and any additional requirements set forth in this advertisement. The classifications of TCIS, TCI and TA have been amended to identify multiple levels of compensation based on experience and training. Please refer to the General Requirements for the changes. For these three classifications, the submitting firm may propose either a TCIS-1 or 2 for each TCIS required, either a TCI-1, 2, or 3 for each TCI required and either a TA-1 or 2 for each TA required. The maximum hourly rate for each of these sub-classifications is stated later in this advertisement. The Maximum Straight Time Hourly Payroll Rate shown in the following table is the maximum rate for the highest sub-classification.
- Soi Deadline
- 11/05/2026
- State Funded
- Yes
- Requirements
- Pad Device Requirements:
Monthly cost for data ($30/month/device) is an estimate only.
- All inspection staff are required to have iPads with 5G service capable of running the latest version of iOS.
- PennDOT apps are designed to support devices which are running the latest version of iOS.
- iPad’s must have at least a minimum of 256 GB internal storage.
- Cost of device and IT support services will be the responsibility of the consultant.
- Cellular service costs may be reimbursed if the firm can provide a written policy to ensure direct project costs. This documentation must be attached to the technical proposal for each firm charging cellular service.
-All PennDOT apps will be made available via the Apple App Store for free and user accounts will be needed for access. For any questions related to the PennDOT approval process or ECMS credentials, please visit [https://www.dot2.state.pa.us](https://www.dot2.state.pa.us)
**Design work for these projects was performed under E06379.**
All questions and answers are required to go through ECMS's "Questions and Responses" forum.
The statement of interest, at a minimum, should indicate how the selected firm will accomplish the tasks outlined and provide the services as detailed. The anticipated duration of the agreement is 1 year.
Documentation of good faith efforts to solicit subconsultants that are diverse businesses (DBs) shall be made by the Consultant and be subject to the concurrence of the Department. A list of the requirements constituting good faith efforts and additional information concerning DB participation in this agreement is contained in Pub. 442, Section 1.9, Diverse Business Participation for Non-Federally Funded Projects.
Additional information regarding this Agreement/Advertisement and Statement of Interest requirements are contained in the [General Requirements](SVCOMFileCabinet?action=GETURL&FILE_NAME=Advertisement General Requirements - Construction Inspection Services&FILE_DATE=06/26/2026) document.
- Agreement Type
- Project Specific
- Detail Fetched
- Yes
- Initiating Org
- Engineering District 11-0
- Services Intro
- The Department of Transportation will retain an engineering firm to provide supplementary construction inspection staff of approximately 4 inspectors under the 1100 Inspector-in-Charge, for construction inspection and documentation services on the following project(s):
- Equipment Intro
- The firm selected will be required to supply the following equipment for use by the consultant inspection staff at their actual cost not to exceed the maximum direct reimbursement shown below:
- Selection Prose
- The Department will establish an order of ranking of a minimum of (3 ) firms for the purpose of negotiating an agreement based on the Department's evaluation of the statements of interest received in response to this solicitation. The final ranking will be established directly from the statements of interest. Technical proposals will not be requested prior to the establishment of the final ranking.
The following factors, listed in order of importance, will be considered by the Department during the evaluation of the business partners submitting statements of interest:
- Special Comments
- There are no special comments.
- Contract Duration
- 1 year
- Selection Process
- Modified
- Services Requested
- Construction Inspection
- General Requirements
- Id
- 3,080
- Ts
- 06/26/2026 10:52:01 AM
- Type
- 10
- File Date
- 06/26/2026
- File Name
- Advertisement General Requirements - Construction Inspection Services
- Listing
- Adv Id
- 19383
- Soi Due
- Nov 6, 2026
- Soi Raw
- 11/05/2026
- Adv Id Raw
- 19,383
- Agreement
- E06828
- Short Desc
- Construction Inspection for GRP 111-27-7135-1 (SR 51-A22)
- External Id
- PENNDOT_ADV_19383
- As Published Id
- 1
- Initiating Org
- Engineering District 11-0
- Type Of Service
- Construction Inspection
- Fetched At
- Nov 2, 2026
- Detail Html
- Advertisement - Project Specific - Construction Inspection Services</td></tr></table> <table class="Section1" ><tr class="Section1" ><td class="Section1" ><table class="Section1Title" ><tr class="Section1Title" ><td class="Section1Title" >Special Comments</td></tr></table><table class="Section1Body" ><tr class="Section1Body" ><td class="Section1Body" ><table class="body"> <colgroup> <col WIDTH='100%'> </colgroup> <tr class="body"> <td class="data"> There are no special comments. </td> </tr></table></td></tr></table></td></tr></table><table class="header1"> <tr class="header1"> <td class="header1"> <table class="header1title"> <tr class="header1title"> <td class="header1title">General</td> </tr> </table> <table class="header1body"> <colgroup> <col WIDTH='25%'> <col WIDTH='75%'> </colgroup> <tr class="header1body"> <td class="label"> Initiating Organization: </td> <td class="body"> <table class="body"> <colgroup> <col WIDTH='50%'> <col WIDTH='15%'> <col WIDTH='35%'> </colgroup> <tr class="body"> <td class="data"> <label class="PDLabel" >Engineering District 11-0</label><input type=hidden name=INIT_ORG_CODE value='1100'> </td> <td class="label">Status:</td> <td class="status" nowrap> Published <A href="SVADVPublish?action=ShowPublishedAdvertisement &ADV_ID=19,383" class="results"> <img border="0" src="images/i_preview.gif" alt="Show Published Advertisement" name="lnkShowPublishedAdvertisement" style="vspace=5;" class="PDImage"> </A> </td> </tr> </table> </td> </tr> <tr class="header1body"> <td class="label">Agreement Type:</td> <td class="data"> Project Specific </td> </tr> <!-- Naga Added code for CQ#32259 --> <tr class="body"> <td class="label">100% State Funded:</td> <td><label class="PDLabel" >Yes</label><input type=hidden name=STATE_FUND_100_PERCENT value='Y'> </td> </tr> <tr class="header1body"> <td class="label">Services Requested:</td> <td class="data"> Construction Inspection </td> </tr> <tr class="header1body"> <td class="label">Selection Process:</td> <td class="data"> Modified </td> </tr> <tr class="header1body"> <td class="label">SOI Deadline:</td> <td class="data"> 11/05/2026 </td> </tr> <tr class="header1body"> <td class="label top"> Agreements: </td> <td class="data"> <table class="body"> <colgroup> <col WIDTH='5%'> <col WIDTH='2%'> <col WIDTH='0*'> <col WIDTH='*'> </colgroup> <tr class="body"> <td class="dataleft"> <A class="PDLink" href="SVAGR?action=SHOWAGRINFO&AGR=E06828&">E06828</A> </td> <td> </td> <td class="dataleft"> Construction Inspection for GRP 111-27-7135-1 (SR 51-A22) </td> <td class="dataleft"> </td> </tr> </table> </td> </tr> <tr class="header1body"> <td class="info" colspan="2"> <br> * This advertisement was created from Agreement <A class="PDLink" href="SVAGR?action=SHOWAGRINFO&AGR=E06828"> E06828 </A> </td> </tr> </table> </td> </tr></table><table class="Section1" ><tr class="Section1" ><td class="Section1" ><table class="Section1Title" ><tr class="Section1Title" ><td class="Section1Title" >Services</td></tr></table><table class="Section1Body" ><tr class="Section1Body" ><td class="Section1Body" > <table class="body"> <tr class="body"> <td class="data"> The Department of Transportation will retain an engineering firm to provide supplementary construction inspection staff of approximately 4 inspectors under the 1100 Inspector-in-Charge, for construction inspection and documentation services on the following project(s): </td> </tr> </table> <br><table class="results"> <colgroup> <col WIDTH='100%' class="results"> </colgroup> <tr class="body"> <td class="body"> <table class="results"> <colgroup> <col WIDTH="15%" class="left"> <col WIDth="50%" class="left"> <col WIDth="*" class="left"> </colgroup> <tr> <th class="results"> Part 1 </th> <th class="results"></th> <th class="results"></th> </tr> <tr> <td colspan="3"> <br> </td> </tr> <tr class="results"> <td> </td> <td> <table class="results"> <colgroup> <col WIDTH="30%" class="left"> <col WIDTH="20%" class="left"> </colgroup> <tr class="resultsheader"> <th class="results"> <label class="PDLabel" >Location Description</label> </th> <th class="results"> <label class="PDLabel" >State Route/Section</label> </th> </tr> <tr class='PDEvenRow' onMouseOver="this.className="highlight"" onMouseOut="this.className="PDEvenRow"" > <td class="results"> Allegheny County </td> <td class="results center"> 51/A22 </td> </tr> </table> </td> <td> </td> </tr> <tr> <td colspan="3"> <br> </td> </tr> <tr> <td class="label"> Part Name: </td> <td class="data" colspan="2"> CI for GRP 111-27-7135-1 (SR 51-A22) </td> </tr> <tr> <td class="label top" nowrap> Project Description: </td> <td class="data" colspan="2"> ECMS 108640, GRP 111-27-7135-1 (SR 51-A22): For the milling, resurfacing, shoulder repair, base repair, drainage, guide rail, pavement marking, and other miscellaneous construction, on various routes totaling a length of 15,312 linear feet (2.9 miles) as indicated on the approved drawings included in the bid package for GROUP PROJECT 111-27-7135-1 in ALLEGHENY COUNTY, CORAOPOLIS BOROUGH, MOON TOWNSHIP and STOWE TOWNSHIP, Commonwealth of Pennsylvania.This project being situated as follows:SR 0051 WB - Fourth Avenue / University Boulevard (WB) from 150 ft east of Vine Street (0670/0000) to Thorn Street (0720/0720)SR 0051 EB - Fifth Avenue (EB) from 150 ft East of Vine Street (0671/0000) to Barn Street (0691/0358).SR 3092 - Broadway Street / 7th Street / Tunnel Way from Pine Hollow Rd (0010/0000) to SR 51 (0040/1923).Anticipated Completion Date: October 13, 2027 </td> </tr> <tr> <td class="label top" nowrap> Anticipated NTP: </td> <td class="data" colspan="2"> March 1, 2027 </td> </tr> <tr> <td class="label"> Project Time: </td> <td class="data" colspan="2"> Day and Night time </td> </tr> </table> </td> </tr></table></td></tr></table></td></tr></table><table class="Section1" ><tr class="Section1" ><td class="Section1" ><table class="Section1Title" ><tr class="Section1Title" ><td class="Section1Title" >Selection Criteria</td></tr></table><table class="Section1Body" ><tr class="Section1Body" ><td class="Section1Body" > <table class="body"> <colgroup> <col WIDTH='100%'> </colgroup> <tr class="body"> <td class="data"> The Department will establish an order of ranking of a minimum of (3 ) firms for the purpose of negotiating an agreement based on the Department's evaluation of the statements of interest received in response to this solicitation. The final ranking will be established directly from the statements of interest. Technical proposals will not be requested prior to the establishment of the final ranking. <br><br> The following factors, listed in order of importance, will be considered by the Department during the evaluation of the business partners submitting statements of interest:<br> </td> </tr> </table> <br><table class="results"> <colgroup> <col WIDTH='95%' class="left"> <col WIDTH='5%' class="left"> </colgroup> <tr class="resultsheader"> <th class="results" nowrap> <label class="PDLabel" >Criteria Description</label> </th> <th class="results center"> <label class="PDLabel" >Weight</label> </th> </tr> <tr class='PDEvenRow' onMouseOver="this.className="highlight"" onMouseOut="this.className="PDEvenRow"" > <td class="results"> Review of inspector's resumes, including the length of employment with the submitting firm, with emphasis on construction inspection capabilities and specific project work assignments and timeframes. </td> <td class="results right"> 30%<input type=hidden name=SELECT_CRITERIA_WEIGHT_PCT value='30'> </td> </tr> <tr class='PDOddRow' onMouseOver="this.className="highlight"" onMouseOut="this.className="PDOddRow"" > <td class="results"> Work experience and supervisory experience on PennDOT projects indicating an understanding of PennDOT's requirements, policies, and specifications. </td> <td class="results right"> 15%<input type=hidden name=SELECT_CRITERIA_WEIGHT_PCT value='15'> </td> </tr> <tr class='PDEvenRow' onMouseOver="this.className="highlight"" onMouseOut="this.className="PDEvenRow"" > <td class="results"> Firm's commitment to a quality control and quality assurance process as demonstrated in the firm's Statement of Interest and the firm's QA/QC Plan on file in ECMS with PennDOT. </td> <td class="results right"> 10%<input type=hidden name=SELECT_CRITERIA_WEIGHT_PCT value='10'> </td> </tr> <tr class='PDOddRow' onMouseOver="this.className="highlight"" onMouseOut="this.className="PDOddRow"" > <td class="results"> Number of NICET, NECEPT Bituminous, and PennDOT Concrete Field Testing Technician Certified Inspectors in each classification. </td> <td class="results right"> 10%<input type=hidden name=SELECT_CRITERIA_WEIGHT_PCT value='10'> </td> </tr> <tr class='PDEvenRow' onMouseOver="this.className="highlight"" onMouseOut="this.className="PDEvenRow"" > <td class="results"> How will Management and Inspection staff work with PennDOT to assure the contractor meets the project milestones? </td> <td class="results right"> 10%<input type=hidden name=SELECT_CRITERIA_WEIGHT_PCT value='10'> </td> </tr> <tr class='PDOddRow' onMouseOver="this.className="highlight"" onMouseOut="this.className="PDOddRow"" > <td class="results"> How did the team perform on past projects? </td> <td class="results right"> 10%<input type=hidden name=SELECT_CRITERIA_WEIGHT_PCT value='10'> </td> </tr> <tr class='PDEvenRow' onMouseOver="this.className="highlight"" onMouseOut="this.className="PDEvenRow"" > <td class="results"> Describe the consultant team's commitment to providing continuing education for the inspection staff. </td> <td class="results right"> 10%<input type=hidden name=SELECT_CRITERIA_WEIGHT_PCT value='10'> </td> </tr> <tr class='PDOddRow' onMouseOver="this.className="highlight"" onMouseOut="this.className="PDOddRow"" > <td class="results"> How will the Inspection staff work with PennDOT to assure contractor compliance with environmental commitments, mitigation and permit conditions? </td> <td class="results right"> 5%<input type=hidden name=SELECT_CRITERIA_WEIGHT_PCT value='5'> </td> </tr> <tr class='PDOddRow' onMouseOver="this.className="highlight"" onMouseOut="this.className="PDOddRow"" > <td class="label"> Weight Total: </td> <td class="results right"> 100% </td> </tr></table> </td></tr></table></td></tr></table><table class="Section1" ><tr class="Section1" ><td class="Section1" ><table class="Section1Title" ><tr class="Section1Title" ><td class="Section1Title" >Staff Classification</td></tr></table><table class="Section1Body" ><tr class="Section1Body" ><td class="Section1Body" ><table class="body"> <colgroup> <col WIDTH='100%'> </colgroup> <tr class="body"> <td class="data"> The qualifications and experience required of the firm's inspectors will be established by the Department, and the qualifications of the firm's proposed employees will be reviewed and approved by the Department. <br><br> It is anticipated that a supplementary construction inspection staff for this assignment will consist of the following number of inspectors who meet the requirements for the inspection classifications as detailed in the General Requirements and any additional requirements set forth in this advertisement. The classifications of TCIS, TCI and TA have been amended to identify multiple levels of compensation based on experience and training. Please refer to the General Requirements for the changes. For these three classifications, the submitting firm may propose either a TCIS-1 or 2 for each TCIS required, either a TCI-1, 2, or 3 for each TCI required and either a TA-1 or 2 for each TA required. The maximum hourly rate for each of these sub-classifications is stated later in this advertisement. The Maximum Straight Time Hourly Payroll Rate shown in the following table is the maximum rate for the highest sub-classification. </td> </tr></table><br> <table class="results"> <colgroup> <col WIDTH='80%' class="left"> <col WIDTH='10%' class="left"> <col WIDTH='10%' class="left"> </colgroup> <tr class="results"> <th class="results" nowrap> <label class="PDLabel" >Staff Description</label> </th> <th class="results" nowrap> <label class="PDLabel" >Inspectors</label> </th> <th class="results" nowrap> <label class="PDLabel" >Resumes</label> </th> </tr> <tr class='PDEvenRow' onMouseOver="this.className="highlight"" onMouseOut="this.className="PDEvenRow"" > <td class="results"> TCI (Transportation Construction Inspector) </td> <td class="results"> 3 </td> <td class="results"> 3 </td> </tr> <tr class='PDOddRow' onMouseOver="this.className="highlight"" onMouseOut="this.className="PDOddRow"" > <td class="results"> TCIS (Transportation Construction Inspector Supervisor) </td> <td class="results"> 1 </td> <td class="results"> 1 </td> </tr> </table><table class="body"> <colgroup> <col WIDTH='100%'> </colgroup> <tr class="body"> <td class="data"> <br> Maximum straight time payroll reimbursement per hour for subsequent calendar years, if applicable, will be established at the scope of work meeting.<P>In order to be capable of addressing any tasks associated with the contractor's activities over the life of the project, the Department reserves the right to increase or decrease inspection staff on each part (or work order).<P>The number of inspectors and classifications listed above is solely for the selection process. This is an estimate based on available information at the time of the advertisement. Understandably, the number and classifications may vary depending on various factors. Adjustments can be made provided the staffing requested is within the standard scope of work. <br> <br> The Maximum straight time hourly payroll rate is the maximum straight time hourly rate paid to an employee in a specific Department Payroll Classification. The Department reserves the right to negotiate hourly payroll rates of individuals based on knowledge, experience and education up to the payroll classification maximum hourly payroll rate. <br><br> The maximum straight time hourly payroll rate for each specific Department Payroll Classification as of July 1, 2026 is as follows: <br> <br> <table class="results"> <tr class="results"> <td class="results">1. Transportation Construction Manager: TCM-2 $46.01, TCM-1 $40.35</td> </tr> <tr class="results"> <td class="results">2. Transportation Construction Inspector Supervisor: TCIS-2 $37.77, TCIS-1 $36.08</td> </tr> <tr class="results"> <td class="results">3. Transportation Construction Inspector: TCI-3 $33.03, TCI-2 $31.66, TCI-1 $30.24</td> </tr> <tr class="results"> <td class="results">4. Transportation Assistant: TA-2 $25.47, TA-1 $21.65</td> </tr> <tr class="results"> <td class="results">5. Coatings Inspector: CI-3 $50.20, CI-2 $42.16, CI-1 $30.95</td> </tr> </table> </td> </tr></table></td></tr></table></td></tr></table> <table class="Section1" ><tr class="Section1" ><td class="Section1" ><table class="Section1Title" ><tr class="Section1Title" ><td class="Section1Title" >Work Task</td></tr></table><table class="Section1Body" ><tr class="Section1Body" ><td class="Section1Body" > <table class="body"> <colgroup> <col WIDTH='100%'> </colgroup> <tr class="body"> <td class="data"> <p><span style="font-size:13.3333px; text-align:start; -webkit-text-stroke-width:0px"><span style="color:#000000"><span style="font-family:Arial, Tahoma, Helvetica, sans-serif"><span style="font-style:normal"><span style="font-variant-ligatures:normal"><span style="font-variant-caps:normal"><span style="font-weight:400"><span style="letter-spacing:normal"><span style="orphans:2"><span style="text-transform:none"><span style="widows:2"><span style="word-spacing:0px"><span style="white-space:normal"><span style="text-decoration-thickness:initial"><span style="text-decoration-style:initial"><span style="text-decoration-color:initial"><span style="display:inline !important"><span style="float:none">Certified inspectors needed to be included are a minimum of one (1) TCIS, two (2) TCI's for field, and one (1) TCI for office, </span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span><span style="font-size:13.3333px; text-align:start; -webkit-text-stroke-width:0px"><span style="color:#000000"><span style="font-family:Arial, Tahoma, Helvetica, sans-serif"><span style="font-style:normal"><span style="font-variant-ligatures:normal"><span style="font-variant-caps:normal"><span style="font-weight:400"><span style="letter-spacing:normal"><span style="orphans:2"><span style="text-transform:none"><span style="widows:2"><span style="word-spacing:0px"><span style="white-space:normal"><span style="text-decoration-thickness:initial"><span style="text-decoration-style:initial"><span style="text-decoration-color:initial"><span style="color:#000000"><span style="font-family:Arial, Tahoma, Helvetica, sans-serif"><span style="font-style:normal"><span style="font-variant-ligatures:normal"><span style="font-variant-caps:normal"><span style="font-weight:400"><span style="letter-spacing:normal"><span style="orphans:2"><span style="text-transform:none"><span style="widows:2"><span style="word-spacing:0px"><span style="white-space:normal"><span style="text-decoration-thickness:initial"><span style="text-decoration-style:initial"><span style="text-decoration-color:initial"><span style="orphans:2"><span style="widows:2"><span style="text-decoration-thickness:initial"><span style="text-decoration-style:initial"><span style="text-decoration-color:initial"><span style="orphans:2"><span style="widows:2"><span style="text-decoration-thickness:initial"><span style="text-decoration-style:initial"><span style="text-decoration-color:initial"><span style="display:inline !important"><span style="float:none"><font color="#000000"><font face="Arial, Tahoma, Helvetica, sans-serif"><span style="font-size:13.3333px">of which two (2) of the field only inspectors are NECEPT Bituminous Field Technician certified, and one (1) of the field only inspectors are </span></font></font></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span><span style="font-size:13.3333px; -webkit-text-stroke-width:0px; text-align:left"><span style="color:#000000"><span style="font-family:Arial, Tahoma, Helvetica, sans-serif"><span style="font-style:normal"><span style="font-variant-ligatures:normal"><span style="font-variant-caps:normal"><span style="font-weight:400"><span style="letter-spacing:normal"><span style="orphans:2"><span style="text-transform:none"><span style="widows:2"><span style="word-spacing:0px"><span style="white-space:normal"><span style="text-decoration-thickness:initial"><span style="text-decoration-style:initial"><span style="text-decoration-color:initial"><span style="color:#000000"><span style="font-family:Arial, Tahoma, Helvetica, sans-serif"><span style="font-style:normal"><span style="font-variant-ligatures:normal"><span style="font-variant-caps:normal"><span style="font-weight:400"><span style="letter-spacing:normal"><span style="orphans:2"><span style="text-transform:none"><span style="widows:2"><span style="word-spacing:0px"><span style="white-space:normal"><span style="text-decoration-thickness:initial"><span style="text-decoration-style:initial"><span style="text-decoration-color:initial"><span style="display:inline !important"><span style="float:none">PennDOT Certified Concrete Field Testing certified</span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span><span style="font-size:13.3333px; text-align:start; -webkit-text-stroke-width:0px"><span style="color:#000000"><span style="font-family:Arial, Tahoma, Helvetica, sans-serif"><span style="font-style:normal"><span style="font-variant-ligatures:normal"><span style="font-variant-caps:normal"><span style="font-weight:400"><span style="letter-spacing:normal"><span style="orphans:2"><span style="text-transform:none"><span style="widows:2"><span style="word-spacing:0px"><span style="white-space:normal"><span style="text-decoration-thickness:initial"><span style="text-decoration-style:initial"><span style="text-decoration-color:initial"><span style="color:#000000"><span style="font-family:Arial, Tahoma, Helvetica, sans-serif"><span style="font-style:normal"><span style="font-variant-ligatures:normal"><span style="font-variant-caps:normal"><span style="font-weight:400"><span style="letter-spacing:normal"><span style="orphans:2"><span style="text-transform:none"><span style="widows:2"><span style="word-spacing:0px"><span style="white-space:normal"><span style="text-decoration-thickness:initial"><span style="text-decoration-style:initial"><span style="text-decoration-color:initial"><span style="color:#000000"><span style="font-family:Arial, Tahoma, Helvetica, sans-serif"><span style="font-style:normal"><span style="font-variant-ligatures:normal"><span style="font-variant-caps:normal"><span style="font-weight:400"><span style="letter-spacing:normal"><span style="orphans:2"><span style="text-transform:none"><span style="widows:2"><span style="word-spacing:0px"><span style="white-space:normal"><span style="text-decoration-thickness:initial"><span style="text-decoration-style:initial"><span style="text-decoration-color:initial"><span style="color:#000000"><span style="font-family:Arial, Tahoma, Helvetica, sans-serif"><span style="font-style:normal"><span style="font-variant-ligatures:normal"><span style="font-variant-caps:normal"><span style="font-weight:400"><span style="letter-spacing:normal"><span style="orphans:2"><span style="text-transform:none"><span style="white-space:normal"><span style="widows:2"><span style="word-spacing:0px"><span style="text-decoration-thickness:initial"><span style="text-decoration-style:initial"><span style="text-decoration-color:initial"><span style="display:inline !important"><span style="float:none">.</span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span><strong style="color:#000000; font-family:Arial, Tahoma, Helvetica, sans-serif; font-size:13.3333px; font-style:normal; font-variant-ligatures:normal; font-variant-caps:normal; letter-spacing:normal; orphans:2; text-align:start; text-transform:none; widows:2; word-spacing:0px; -webkit-text-stroke-width:0px; white-space:normal; text-decoration-thickness:initial; text-decoration-style:initial; text-decoration-color:initial"> One of the inspectors is to be a Qualified Visual Site Inspector (QVSI) through the DEP’s Clean Water Academy</strong><span style="font-size:13.3333px; text-align:start; -webkit-text-stroke-width:0px"><span style="color:#000000"><span style="font-family:Arial, Tahoma, Helvetica, sans-serif"><span style="font-style:normal"><span style="font-variant-ligatures:normal"><span style="font-variant-caps:normal"><span style="font-weight:400"><span style="letter-spacing:normal"><span style="orphans:2"><span style="text-transform:none"><span style="widows:2"><span style="word-spacing:0px"><span style="white-space:normal"><span style="text-decoration-thickness:initial"><span style="text-decoration-style:initial"><span style="text-decoration-color:initial"><span style="display:inline !important"><span style="float:none">. The office TCI is to be proficient in the use of ECMS and knowledgeable about and capable of ensuring the quality and accuracy of all necessary office documentation including but not limited to: materials documentation, labor compliance documentation, safety documentation, processing estimates, work orders, and adjustments, reviewing and verifying PSA's, and all other necessary office duties. The office TCI may be utilized in both the field and office.</span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></p><p>The firm selected may be required to attend a pre-construction conference with the Department and the construction contractor for this project. Under the supervision and direction of the department the selected firm will be required to keep records and document the construction work prepare current and final estimates for payment to the construction contractor assist the Department in obtaining compliance with the labor standards safety and accident prevention and equal opportunity provisions of the contract item. The selected firm may also be required to perform other duties as needed.</p><table border="0" cellpadding="0" cellspacing="0" style="display: none;"> <tbody> <tr> <td> </td> </tr> </tbody></table><p> </p> </td> </tr> </table></td></tr></table></td></tr></table> <table class="Section1" ><tr class="Section1" ><td class="Section1" ><table class="Section1Title" ><tr class="Section1Title" ><td class="Section1Title" >Equipment</td></tr></table><table class="Section1Body" ><tr class="Section1Body" ><td class="Section1Body" ><table class="body"> <colgroup> <col WIDTH='100%'> </colgroup> <tr class="body"> <td class="data"> The firm selected will be required to supply the following equipment for use by the consultant inspection staff at their actual cost not to exceed the maximum direct reimbursement shown below: <br> </td> </tr></table> <table class="results"> <colgroup> <col WIDTH='45%' class="left"> <col WIDTH='45%' class="left"> <col WIDTH='10%' class="left"> </colgroup> <tr class="resultsheader"> <th class="results" nowrap> <label class="PDLabel" >Description</label> </th> <th class="results" nowrap> <label class="PDLabel" >Max Reimbursement</label> </th> <th class="results" nowrap> <label class="PDLabel" >Qty</label> </th> </tr> <tr class='PDEvenRow' onMouseOver="this.className="highlight"" onMouseOut="this.className="PDEvenRow"" > <td class="results"> iPads </td> <td class="results"> As per invoice (iPad Usage) </td> <td class="results"> 4 </td> </tr> <tr class='PDOddRow' onMouseOver="this.className="highlight"" onMouseOut="this.className="PDOddRow"" > <td class="results"> Cellular Phones </td> <td class="results"> As per invoice (Cell Phone Usage) </td> <td class="results"> 4 </td> </tr> </table><table class="body"> <colgroup> <col WIDTH='100%'> </colgroup> <tr class="body"> <td class="data"> <br> If the equipment is self-owned, reimbursement will be based on actual cost of ownership not to exceed the maximum allowable. If equipment is from an outside supplier, the engineer must secure a minimum of three written quotes. The Department reserves the right to request additional quotes.<br><br>A maximum daily reimbursement amount for mileage to and from the work site will be established by multiplying 150 miles by the maximum Department allowable mileage rate per mile. The maximum reimbursed mileage is 75 miles each way for any given day. Mileage will be reimbursed for the shortest distance route from the inspector's residence to the work site and return using primarily state routes. A commuting distance of 15 miles each direction will be considered a normal commuting distance from the inspector's residence and will not be eligible for mileage reimbursement. An inspector will be reimbursed for either mileage to and from the work site or lodging, but will not be reimbursed for a combination of the two during the same day.<br><br>If using Lodging:<br><br>The only exception to the mileage above would be the first day of the work week if lodging is used. Mileage to the jobsite, up to 75 miles, and lodging for the first night will be allowed. Lodging will be reimbursed up to the current GSA maximum allowable lodging rates for the area where the inspector is working in lieu of mileage. Receipts for all costs must be provided to the Department upon request. Lodging will be reimbursed only for employees whose homes are more than 65 miles from the work site. The current GSA maximum allowable lodging rate for the month invoiced is required to be submitted with each invoice when lodging reimbursement is requested. Mileage home on the last day of the week would be reimbursed up to 75 miles home.<br><br>If using extended stay lodging through a hotel or apartment lodging for projects of long duration (60 days or more) the following management directive will apply:<br><br>The Department will need to approve the specifics regarding the rental costs. The documentation include calculations supporting the proposed costs prior to the firm actually using an apartment/hotel as extended lodging. The analysis should include the cost breakdown that shows the cost savings for renting an apartment as opposed to staying in a hotel daily. Therefore, the firm would need to show the cost benefit vs. paying for the normal lodging. The firm should come up with the total cost as a monthly cost (this being lower than lodging for a month) and the cost would be entered under Other Costs at a number of months (units) at the given cost. If the price proposal is already developed then you can enter the cost in the Commute/Lodging Miles category and include a comment that this cost includes the apartment lodging.<br><br>The following rule has been adopted from the Commonwealth Travel Manual 230.1<br><br>"Reimbursement will be limited to lodging, necessary utilities (cable and phone are excluded), and mileage or transportation costs for a biweekly roundtrip between the worksite and the traveler's permanent residence or headquarters. Subsistence expenses are not allowed. Mileage is not paid between lodging and temporary worksite." </td> </tr></table></td></tr></table></td></tr></table> <table class="Section1" ><tr class="Section1" ><td class="Section1" ><table class="Section1Title" ><tr class="Section1Title" ><td class="Section1Title" >Requirements</td></tr></table><table class="Section1Body" ><tr class="Section1Body" ><td class="Section1Body" > <table class="body"> <colgroup> <col WIDTH='100%'> </colgroup> <tr class="body"> <td class="data"> <table> <tbody> <tr> <td> <table> <tbody> <tr> <td> <p><u>Pad Device Requirements:</u><br /> Monthly cost for data ($30/month/device) is an estimate only.<br /> - All inspection staff are required to have iPads with 5G service capable of running the latest version of iOS.<br /> - PennDOT apps are designed to support devices which are running the latest version of iOS.<br /> - iPad’s must have at least a minimum of 256 GB internal storage.<br /> - Cost of device and IT support services will be the responsibility of the consultant.<br /> - Cellular service costs may be reimbursed if the firm can provide a written policy to ensure direct project costs. This documentation must be attached to the technical proposal for each firm charging cellular service. </p> <p> -All PennDOT apps will be made available via the Apple App Store for free and user accounts will be needed for access. For any questions related to the PennDOT approval process or ECMS credentials, please visit <span style="font-size:11.0pt"><span style="line-height:107%"><span style="font-family:"Calibri",sans-serif"><a href="https://www.dot2.state.pa.us" style="color:blue; text-decoration:underline"><span style="font-size:10.0pt"><span style="line-height:107%"><span style="font-family:"Verdana",sans-serif">https://www.dot2.state.pa.us</span></span></span></a></span></span></span></p> </td> </tr> </tbody> </table> </td> </tr> </tbody></table><p> </p><p><strong>Design work for these projects was performed under E06379.</strong></p><table border="0" cellpadding="0" cellspacing="0" style="display: none;"> <tbody> <tr> <td> </td> </tr> </tbody></table><p> </p> <br><br> All questions and answers are required to go through ECMS's "Questions and Responses" forum.<br><br><!-- CQ#11822-Naga --> The statement of interest, at a minimum, should indicate how the selected firm will accomplish the tasks outlined and provide the services as detailed. The anticipated duration of the agreement is <label class="PDLabel" >1 year</label><input type=hidden name=CONTRACT_DURATION_CODE value='01'>. <br><br> <!-- Naga-CQ#32260 --> Documentation of good faith efforts to solicit subconsultants that are diverse businesses (DBs) shall be made by the Consultant and be subject to the concurrence of the Department. A list of the requirements constituting good faith efforts and additional information concerning DB participation in this agreement is contained in Pub. 442, Section 1.9, Diverse Business Participation for Non-Federally Funded Projects. <br><br> Additional information regarding this Agreement/Advertisement and Statement of Interest requirements are contained in the <A class="pdlink" href="SVCOMFileCabinet?action=GETURL&FILE_NAME=Advertisement General Requirements - Construction Inspection Services&FILE_DATE=06/26/2026"> General Requirements</a> document. </td> </tr> </table></td></tr></table></td></tr></table><table class="Section1" ><tr class="Section1" ><td class="Section1" > <table class="Section1Title" ><tr class="Section1Title" ><td class="Section1Title" >Attachment</td></tr></table> <table class="Section1Body" ><tr class="Section1Body" ><td class="Section1Body" > <table class="body"> <tr class="body"> <td class="data"> There is no file attachment. </td> </tr> </table> </td></tr></table></td></tr></table>
<table class="Section1" ><tr class="Section1" ><td class="Section1" >
<table class="Section1Title" ><tr class="Section1Title" ><td class="Section1Title" >Questions and Responses
</td><td class="Section1Title Right" >
<button lang="javascript" name="New" class="PDButton" onmouseover="this.className='PDButton PDButtonHover'" onmouseout="this.className='PDButton'" title="New Question" onClick="return checkSelectionConfirmation('true', "setAction('CreateQuestion')", '') && doPDButton('submit', 'pdform', "");" >New</button>
</td></tr></table>
<table class="Section1Body" ><tr class="Section1Body" ><td class="Section1Body" >
<table class="body">
<tr class="body">
<td class="body"><i>No records found.</i></td>
</tr>
</table>
</td></tr></table>
</td></tr></table>
<table class="Section1" ><tr class="Section1" ><td class="Section1" >
<table class="Section1Title" ><tr class="Section1Title" ><td class="Section1Title" >Contact Information</td></tr></table>
<table class="results">
<colgroup>
<col WIDTH='25%' class="left">
<col WIDTH='35%' class="left">
<col WIDTH='15%' class="left">
<col WIDTH='15%' class="left">
<col WIDTH='10%' class="left">
</colgroup>
<tr class="resultsheader">
<th class="results" nowrap>
<label class="PDLabel" >Name</label>
</th>
<th class="results" nowrap>
<label class="PDLabel" >Email</label>
</th>
<th class="results" nowrap>
<label class="PDLabel" >Phone</label>
</th>
<th class="results" nowrap>
<label class="PDLabel" >Fax</label>
</th>
<th class="results" nowrap>
<label class="PDLabel" >Org</label>
</th>
</tr>
<tr class='PDEvenRow' onMouseOver="this.className="highlight"" onMouseOut="this.className="PDEvenRow"" >
<td class="results">
Nicole R. Perry
</td>
<td class="results" nowrap>
<a href="mailto:niperry@pa.gov" title="Send Email" class="PDLink">niperry@pa.gov</a><input type=hidden name=EMAIL_ADDRESS value='niperry@pa.gov'>
</td>
<td class="results">
(412) 429-4881
</td>
<td class="results">
</td>
<td class="results">
1100
</td>
</tr>
</table>
</td></tr></table>
<table class="Section1" ><tr class="Section1" ><td class="Section1" >
<table class="Section1Title" ><tr class="Section1Title" ><td class="Section1Title" >History</td></tr></table>
<table class="results">
<colgroup>
<col WIDTH='10%' class="left">
<col WIDTH='10%' class="left">
<col WIDTH='*' class="left">
</colgroup>
<tr class="resultsheader">
<th class="results" nowrap>
<label class="PDLabel" >Published</label>
</th>
<th class="results" nowrap>
<label class="PDLabel" >SOI Deadline</label>
</th>
<th class="results" nowrap>
<label class="PDLabel" >Revised Description</label>
</th>
</tr>
<tr class='PDEvenRow' onMouseOver="this.className="highlight"" onMouseOut="this.className="PDEvenRow"" >
<td class="results">
<A href="SVADVPublish?action=ShowPublishedAdvertisement&ADV_ID=19,383
&AS_PUBLISHED_ID=1" class="results"/>
10/26/2026
</A>
</td>
<td class="results">
11/05/2026
</td>
<td class="results">
</td>
</tr>
</table>
</td></tr></table>
</form>
<table class="footer">
<colgroup>
<col width="175px" nowrap/>
<col width="*" nowrap/>
<col width="175px" nowrap/>
</colgroup>
<tr class="footer">
<td class="footer" colspan="3">
You are currently logged in as
- Detail Fetched
- Yes