- Detail
- Parts
- Name
- SR0422-RDP, Lebanon County, MPMS #97271
- Index
- 1
- Counties
- Lebanon County
- Sr Section
- 0422/RDP
- Project Time
- Day and Night time
- Anticipated Ntp
- 3/29/2027
- Project Description
- SR0422-RDP, MPMS #97271. Roadway. Resurfacing of SR0422 from east of Halfway House Drive to the Berks County line in Jackson Township and Myerstown Borough, Lebanon County. Anticipated staffing: TCIS: 1; TCI: 1; and TA: 1. Anticipated duration: 3/29/2027 to 10/31/2027.
- Name
- SR0222-RDP, Lancaster County, MPMS #107030
- Index
- 2
- Counties
- Lancaster County
- Sr Section
- 0222/RDP
- Project Time
- Day and Night time
- Anticipated Ntp
- 3/29/2027
- Project Description
- SR0222-RDP, MPMS #107030. Roadway. Resurfacing of SR0222 in Fulton Township, Lancaster County. Anticipated staffing: TCIS: 1; TCI: 1; and TA: 1. Anticipated duration: 3/29/2027 to 10/31/2027.
- Name
- SR0441-RDP, Lancaster County, MPMS #124435
- Index
- 3
- Counties
- Lancaster County
- Sr Section
- 0441/RDP
- Project Time
- Day and Night time
- Anticipated Ntp
- 3/29/2027
- Project Description
- SR0441-RDP, MPMS #124435. Roadway. Resurfacing of SR0441, SR0030 to Wickersham Road, West Hempfield and East Donegal Townships, Lancaster County. Anticipated staffing: TCIS: 1 (shared); TCI: 1; and TA: 1. Anticipated duration: 3/29/2027 to 10/31/2027.
- Name
- SR4008-RDP, Lancaster County, MPMS #109979
- Index
- 4
- Counties
- Lancaster County
- Sr Section
- 1037/RDP
- Project Time
- Day and Night time
- Anticipated Ntp
- 3/29/2027
- Project Description
- SR1037-RDP, MPMS #124433. Roadway. Resurfacing of SR1037 (Elm Road) starting at W. Newport Road to SR0501, in Penn, Elizabeth, and Warwick Townships, Lancaster County. Anticipated staffing: TCIS: 1 (shared); TCI: 1; and TA: 1. Anticipated duration: 3/29/2027 to 10/31/2027.
- Staff
- Resumes
- 0
- Inspectors
- 4
- Description
- TA (Transportation Assistant)
- Resumes
- 4
- Inspectors
- 4
- Description
- TCI (Transportation Construction Inspector)
- Resumes
- 3
- Inspectors
- 3
- Description
- TCIS (Transportation Construction Inspector Supervisor)
- Status
- Published
- Dbe Goal
- 0
- Heading
- Advertisement - Project Specific - Construction Inspection Services
- History
- Published
- 09/28/2026
- Soi Deadline
- 10/15/2026
- Contacts
- Fax
- (717) 772-0397
- Org
- 0800
- Name
- Brian J. Blake
- Email
- bblake@pa.gov
- Phone
- (717) 783-7973
- Criteria
- Weight
- 20%
- Description
- 1. Review of inspector's resumes, including the length of employment with the submitting firm, with emphasis on construction inspection capabilities and specific project work assignments and timeframes.
- Weight
- 20%
- Description
- 2. Work experience and supervisory experience on PennDOT projects indicating an understanding of PennDOT's requirements, policies, and specifications.
- Weight
- 15%
- Description
- 3. Number of NICET (by level), NECEPT Bituminous Certification and NECEPT Concrete Field Technician Certification in each classification. Staff in each classification with Guiderail Certification, and Traffic Barrier/End Treatment Certification.
- Weight
- 15%
- Description
- 4. Firm's commitment to a quality control and quality assurance process as demonstrated in the firm's Statement of Interest and the firm's QA/QC Plan on file in ECMS with PennDOT. Demonstrate a formalized training program to develop field staff.
- Weight
- 15%
- Description
- 5. How will the inspection staff work with PennDOT to assure contractor compliance with environmental permit conditions?
- Weight
- 10%
- Description
- 6. How will the inspection staff work with PennDOT to assure the contractor meets the project milestones?
- Weight
- 5%
- Description
- 7. How did the team perform on past projects?
- Weight
- 100%
- Description
- Weight Total:
- Equipment
- Qty
- 11
- Description
- Cellular Phones
- Max Reimbursement
- As per invoice (Cell Phone Usage)
- Qty
- 11
- Description
- iPads
- Max Reimbursement
- As per invoice (iPad Usage)
- Agreements
- Name
- Lancaster Lebanon Rapid Pavement Projects
- Number
- E06817
- Staff Intro
- The qualifications and experience required of the firm's inspectors will be established by the Department, and the qualifications of the firm's proposed employees will be reviewed and approved by the Department.
It is anticipated that a supplementary construction inspection staff for this assignment will consist of the following number of inspectors who meet the requirements for the inspection classifications as detailed in the General Requirements and any additional requirements set forth in this advertisement. The classifications of TCIS, TCI and TA have been amended to identify multiple levels of compensation based on experience and training. Please refer to the General Requirements for the changes. For these three classifications, the submitting firm may propose either a TCIS-1 or 2 for each TCIS required, either a TCI-1, 2, or 3 for each TCI required and either a TA-1 or 2 for each TA required. The maximum hourly rate for each of these sub-classifications is stated later in this advertisement. The Maximum Straight Time Hourly Payroll Rate shown in the following table is the maximum rate for the highest sub-classification.
- Soi Deadline
- 10/15/2026
- State Funded
- No
- Requirements
- **iPad Requirements**
Monthly cost for data ($30/month/device) is an estimate only.
- All inspection staff are required to have iPads with 5G service capable of running the latest version of iOS.
- PennDOT apps are designed to support devices which are running the latest version of iOS.
- iPad’s must have at least a minimum of 256 GB internal storage.
- Cost of device and IT support services will be the responsibility of the consultant.
- Cellular service costs may be reimbursed if the firm can provide a written policy to ensure direct project costs. This documentation must be attached to the technical proposal for each firm charging cellular service.
-All PennDOT apps will be made available via the Apple App Store for free and user accounts will be needed for access. For any questions related to the PennDOT approval process or ECMS credentials, please visit [http://www.dotdom3.state.pa.us/ecms/BP_Reg/index.html](http://www.dotdom3.state.pa.us/ecms/BP_Reg/index.html).
Design work for these projects was performed in-house.
All questions and answers are required to go through ECMS's "Questions and Responses" forum.
The statement of interest, at a minimum, should indicate how the selected firm will accomplish the tasks outlined and provide the services as detailed. The anticipated duration of the agreement is 1 year.
The goal for Disadvantaged Business Enterprise (DBE) participation in this agreement shall be 0 of the total agreement cost. Cost included in a DBE firm's price proposal as direct cost of work and services by others shall not count as DBE participation in this agreement, unless completed by a DBE firm. Additional information concerning DBE participation in this agreement is contained in the General Requirements and Information Section referenced below.
Additional information regarding this Agreement/Advertisement and Statement of Interest requirements are contained in the [General Requirements](SVCOMFileCabinet?action=GETURL&FILE_NAME=Advertisement General Requirements - Construction Inspection Services&FILE_DATE=06/26/2026) document.
- Agreement Type
- Project Specific
- Detail Fetched
- Yes
- Initiating Org
- Engineering District 8-0
- Services Intro
- The Department of Transportation will retain an engineering firm to provide supplementary construction inspection staff of approximately 11 inspectors under the 0800 Inspector-in-Charge, for construction inspection and documentation services on the following project(s):
- Equipment Intro
- The firm selected will be required to supply the following equipment for use by the consultant inspection staff at their actual cost not to exceed the maximum direct reimbursement shown below:
- Selection Prose
- The Department will establish an order of ranking of a minimum of (3 ) firms for the purpose of negotiating an agreement based on the Department's evaluation of the statements of interest received in response to this solicitation. The final ranking will be established directly from the statements of interest. Technical proposals will not be requested prior to the establishment of the final ranking.
The following factors, listed in order of importance, will be considered by the Department during the evaluation of the business partners submitting statements of interest:
- Contract Duration
- 1 year
- Selection Process
- Modified
- Services Requested
- Construction Inspection
- General Requirements
- Id
- 3,080
- Ts
- 06/26/2026 10:52:01 AM
- Type
- 10
- File Date
- 06/26/2026
- File Name
- Advertisement General Requirements - Construction Inspection Services
- Listing
- Adv Id
- 19309
- Soi Due
- Oct 16, 2026
- Soi Raw
- 10/15/2026
- Adv Id Raw
- 19,309
- Agreement
- E06817
- Short Desc
- Lancaster Lebanon Rapid Pavement Projects
- External Id
- PENNDOT_ADV_19309
- As Published Id
- 1
- Initiating Org
- Engineering District 8-0
- Type Of Service
- Construction Inspection
- Fetched At
- Oct 11, 2026
- Detail Html
- Advertisement - Project Specific - Construction Inspection Services</td></tr></table> <table class="Section1" ><tr class="Section1" ><td class="Section1" ><table class="Section1Title" ><tr class="Section1Title" ><td class="Section1Title" >Special Comments</td></tr></table><table class="Section1Body" ><tr class="Section1Body" ><td class="Section1Body" ><table class="body"> <colgroup> <col WIDTH='100%'> </colgroup> <tr class="body"> <td class="data"> <table border="0" cellpadding="0" cellspacing="0" style="display: none;"> <tbody> <tr> <td> </td> </tr> </tbody></table><p> </p><p> </p><p> </p> </td> </tr></table></td></tr></table></td></tr></table><table class="header1"> <tr class="header1"> <td class="header1"> <table class="header1title"> <tr class="header1title"> <td class="header1title">General</td> </tr> </table> <table class="header1body"> <colgroup> <col WIDTH='25%'> <col WIDTH='75%'> </colgroup> <tr class="header1body"> <td class="label"> Initiating Organization: </td> <td class="body"> <table class="body"> <colgroup> <col WIDTH='50%'> <col WIDTH='15%'> <col WIDTH='35%'> </colgroup> <tr class="body"> <td class="data"> <label class="PDLabel" >Engineering District 8-0</label><input type=hidden name=INIT_ORG_CODE value='0800'> </td> <td class="label">Status:</td> <td class="status" nowrap> Published <A href="SVADVPublish?action=ShowPublishedAdvertisement &ADV_ID=19,309" class="results"> <img border="0" src="images/i_preview.gif" alt="Show Published Advertisement" name="lnkShowPublishedAdvertisement" style="vspace=5;" class="PDImage"> </A> </td> </tr> </table> </td> </tr> <tr class="header1body"> <td class="label">Agreement Type:</td> <td class="data"> Project Specific </td> </tr> <!-- Naga Added code for CQ#32259 --> <tr class="body"> <td class="label">100% State Funded:</td> <td><label class="PDLabel" >No</label><input type=hidden name=STATE_FUND_100_PERCENT value='N'> </td> </tr> <tr class="header1body"> <td class="label">Services Requested:</td> <td class="data"> Construction Inspection </td> </tr> <tr class="header1body"> <td class="label">Selection Process:</td> <td class="data"> Modified </td> </tr> <tr class="header1body"> <td class="label">SOI Deadline:</td> <td class="data"> 10/15/2026 </td> </tr> <tr class="header1body"> <td class="label top"> Agreements: </td> <td class="data"> <table class="body"> <colgroup> <col WIDTH='5%'> <col WIDTH='2%'> <col WIDTH='0*'> <col WIDTH='*'> </colgroup> <tr class="body"> <td class="dataleft"> <A class="PDLink" href="SVAGR?action=SHOWAGRINFO&AGR=E06817&">E06817</A> </td> <td> </td> <td class="dataleft"> Lancaster Lebanon Rapid Pavement Projects </td> <td class="dataleft"> </td> </tr> </table> </td> </tr> <tr class="header1body"> <td class="info" colspan="2"> <br> * This advertisement was created from Agreement <A class="PDLink" href="SVAGR?action=SHOWAGRINFO&AGR=E06817"> E06817 </A> </td> </tr> </table> </td> </tr></table><table class="Section1" ><tr class="Section1" ><td class="Section1" ><table class="Section1Title" ><tr class="Section1Title" ><td class="Section1Title" >Services</td></tr></table><table class="Section1Body" ><tr class="Section1Body" ><td class="Section1Body" > <table class="body"> <tr class="body"> <td class="data"> The Department of Transportation will retain an engineering firm to provide supplementary construction inspection staff of approximately 11 inspectors under the 0800 Inspector-in-Charge, for construction inspection and documentation services on the following project(s): </td> </tr> </table> <br><table class="results"> <colgroup> <col WIDTH='100%' class="results"> </colgroup> <tr class="body"> <td class="body"> <table class="results"> <colgroup> <col WIDTH="15%" class="left"> <col WIDth="50%" class="left"> <col WIDth="*" class="left"> </colgroup> <tr> <th class="results"> Part 1 </th> <th class="results"></th> <th class="results"></th> </tr> <tr> <td colspan="3"> <br> </td> </tr> <tr class="results"> <td> </td> <td> <table class="results"> <colgroup> <col WIDTH="30%" class="left"> <col WIDTH="20%" class="left"> </colgroup> <tr class="resultsheader"> <th class="results"> <label class="PDLabel" >Location Description</label> </th> <th class="results"> <label class="PDLabel" >State Route/Section</label> </th> </tr> <tr class='PDEvenRow' onMouseOver="this.className="highlight"" onMouseOut="this.className="PDEvenRow"" > <td class="results"> Lebanon County </td> <td class="results center"> 0422/RDP </td> </tr> </table> </td> <td> </td> </tr> <tr> <td colspan="3"> <br> </td> </tr> <tr> <td class="label"> Part Name: </td> <td class="data" colspan="2"> SR0422-RDP, Lebanon County, MPMS #97271 </td> </tr> <tr> <td class="label top" nowrap> Project Description: </td> <td class="data" colspan="2"> SR0422-RDP, MPMS #97271. Roadway. Resurfacing of SR0422 from east of Halfway House Drive to the Berks County line in Jackson Township and Myerstown Borough, Lebanon County. Anticipated staffing: TCIS: 1; TCI: 1; and TA: 1. Anticipated duration: 3/29/2027 to 10/31/2027. </td> </tr> <tr> <td class="label top" nowrap> Anticipated NTP: </td> <td class="data" colspan="2"> 3/29/2027 </td> </tr> <tr> <td class="label"> Project Time: </td> <td class="data" colspan="2"> Day and Night time </td> </tr> <tr> <th class="results"> Part 2 </th> <th class="results"></th> <th class="results"></th> </tr> <tr> <td colspan="3"> <br> </td> </tr> <tr class="results"> <td> </td> <td> <table class="results"> <colgroup> <col WIDTH="30%" class="left"> <col WIDTH="20%" class="left"> </colgroup> <tr class="resultsheader"> <th class="results"> <label class="PDLabel" >Location Description</label> </th> <th class="results"> <label class="PDLabel" >State Route/Section</label> </th> </tr> <tr class='PDEvenRow' onMouseOver="this.className="highlight"" onMouseOut="this.className="PDEvenRow"" > <td class="results"> Lancaster County </td> <td class="results center"> 0222/RDP </td> </tr> </table> </td> <td> </td> </tr> <tr> <td colspan="3"> <br> </td> </tr> <tr> <td class="label"> Part Name: </td> <td class="data" colspan="2"> SR0222-RDP, Lancaster County, MPMS #107030 </td> </tr> <tr> <td class="label top" nowrap> Project Description: </td> <td class="data" colspan="2"> SR0222-RDP, MPMS #107030. Roadway. Resurfacing of SR0222 in Fulton Township, Lancaster County. Anticipated staffing: TCIS: 1; TCI: 1; and TA: 1. Anticipated duration: 3/29/2027 to 10/31/2027. </td> </tr> <tr> <td class="label top" nowrap> Anticipated NTP: </td> <td class="data" colspan="2"> 3/29/2027 </td> </tr> <tr> <td class="label"> Project Time: </td> <td class="data" colspan="2"> Day and Night time </td> </tr> <tr> <th class="results"> Part 3 </th> <th class="results"></th> <th class="results"></th> </tr> <tr> <td colspan="3"> <br> </td> </tr> <tr class="results"> <td> </td> <td> <table class="results"> <colgroup> <col WIDTH="30%" class="left"> <col WIDTH="20%" class="left"> </colgroup> <tr class="resultsheader"> <th class="results"> <label class="PDLabel" >Location Description</label> </th> <th class="results"> <label class="PDLabel" >State Route/Section</label> </th> </tr> <tr class='PDEvenRow' onMouseOver="this.className="highlight"" onMouseOut="this.className="PDEvenRow"" > <td class="results"> Lancaster County </td> <td class="results center"> 0441/RDP </td> </tr> </table> </td> <td> </td> </tr> <tr> <td colspan="3"> <br> </td> </tr> <tr> <td class="label"> Part Name: </td> <td class="data" colspan="2"> SR0441-RDP, Lancaster County, MPMS #124435 </td> </tr> <tr> <td class="label top" nowrap> Project Description: </td> <td class="data" colspan="2"> SR0441-RDP, MPMS #124435. Roadway. Resurfacing of SR0441, SR0030 to Wickersham Road, West Hempfield and East Donegal Townships, Lancaster County. Anticipated staffing: TCIS: 1 (shared); TCI: 1; and TA: 1. Anticipated duration: 3/29/2027 to 10/31/2027. </td> </tr> <tr> <td class="label top" nowrap> Anticipated NTP: </td> <td class="data" colspan="2"> 3/29/2027 </td> </tr> <tr> <td class="label"> Project Time: </td> <td class="data" colspan="2"> Day and Night time </td> </tr> <tr> <th class="results"> Part 4 </th> <th class="results"></th> <th class="results"></th> </tr> <tr> <td colspan="3"> <br> </td> </tr> <tr class="results"> <td> </td> <td> <table class="results"> <colgroup> <col WIDTH="30%" class="left"> <col WIDTH="20%" class="left"> </colgroup> <tr class="resultsheader"> <th class="results"> <label class="PDLabel" >Location Description</label> </th> <th class="results"> <label class="PDLabel" >State Route/Section</label> </th> </tr> <tr class='PDEvenRow' onMouseOver="this.className="highlight"" onMouseOut="this.className="PDEvenRow"" > <td class="results"> Lancaster County </td> <td class="results center"> 1037/RDP </td> </tr> </table> </td> <td> </td> </tr> <tr> <td colspan="3"> <br> </td> </tr> <tr> <td class="label"> Part Name: </td> <td class="data" colspan="2"> SR4008-RDP, Lancaster County, MPMS #109979 </td> </tr> <tr> <td class="label top" nowrap> Project Description: </td> <td class="data" colspan="2"> SR1037-RDP, MPMS #124433. Roadway. Resurfacing of SR1037 (Elm Road) starting at W. Newport Road to SR0501, in Penn, Elizabeth, and Warwick Townships, Lancaster County. Anticipated staffing: TCIS: 1 (shared); TCI: 1; and TA: 1. Anticipated duration: 3/29/2027 to 10/31/2027. </td> </tr> <tr> <td class="label top" nowrap> Anticipated NTP: </td> <td class="data" colspan="2"> 3/29/2027 </td> </tr> <tr> <td class="label"> Project Time: </td> <td class="data" colspan="2"> Day and Night time </td> </tr> </table> </td> </tr></table></td></tr></table></td></tr></table><table class="Section1" ><tr class="Section1" ><td class="Section1" ><table class="Section1Title" ><tr class="Section1Title" ><td class="Section1Title" >Selection Criteria</td></tr></table><table class="Section1Body" ><tr class="Section1Body" ><td class="Section1Body" > <table class="body"> <colgroup> <col WIDTH='100%'> </colgroup> <tr class="body"> <td class="data"> The Department will establish an order of ranking of a minimum of (3 ) firms for the purpose of negotiating an agreement based on the Department's evaluation of the statements of interest received in response to this solicitation. The final ranking will be established directly from the statements of interest. Technical proposals will not be requested prior to the establishment of the final ranking. <br><br> The following factors, listed in order of importance, will be considered by the Department during the evaluation of the business partners submitting statements of interest:<br> </td> </tr> </table> <br><table class="results"> <colgroup> <col WIDTH='95%' class="left"> <col WIDTH='5%' class="left"> </colgroup> <tr class="resultsheader"> <th class="results" nowrap> <label class="PDLabel" >Criteria Description</label> </th> <th class="results center"> <label class="PDLabel" >Weight</label> </th> </tr> <tr class='PDEvenRow' onMouseOver="this.className="highlight"" onMouseOut="this.className="PDEvenRow"" > <td class="results"> 1. Review of inspector's resumes, including the length of employment with the submitting firm, with emphasis on construction inspection capabilities and specific project work assignments and timeframes. </td> <td class="results right"> 20%<input type=hidden name=SELECT_CRITERIA_WEIGHT_PCT value='20'> </td> </tr> <tr class='PDOddRow' onMouseOver="this.className="highlight"" onMouseOut="this.className="PDOddRow"" > <td class="results"> 2. Work experience and supervisory experience on PennDOT projects indicating an understanding of PennDOT's requirements, policies, and specifications. </td> <td class="results right"> 20%<input type=hidden name=SELECT_CRITERIA_WEIGHT_PCT value='20'> </td> </tr> <tr class='PDEvenRow' onMouseOver="this.className="highlight"" onMouseOut="this.className="PDEvenRow"" > <td class="results"> 3. Number of NICET (by level), NECEPT Bituminous Certification and NECEPT Concrete Field Technician Certification in each classification. Staff in each classification with Guiderail Certification, and Traffic Barrier/End Treatment Certification. </td> <td class="results right"> 15%<input type=hidden name=SELECT_CRITERIA_WEIGHT_PCT value='15'> </td> </tr> <tr class='PDOddRow' onMouseOver="this.className="highlight"" onMouseOut="this.className="PDOddRow"" > <td class="results"> 4. Firm's commitment to a quality control and quality assurance process as demonstrated in the firm's Statement of Interest and the firm's QA/QC Plan on file in ECMS with PennDOT. Demonstrate a formalized training program to develop field staff. </td> <td class="results right"> 15%<input type=hidden name=SELECT_CRITERIA_WEIGHT_PCT value='15'> </td> </tr> <tr class='PDEvenRow' onMouseOver="this.className="highlight"" onMouseOut="this.className="PDEvenRow"" > <td class="results"> 5. How will the inspection staff work with PennDOT to assure contractor compliance with environmental permit conditions? </td> <td class="results right"> 15%<input type=hidden name=SELECT_CRITERIA_WEIGHT_PCT value='15'> </td> </tr> <tr class='PDOddRow' onMouseOver="this.className="highlight"" onMouseOut="this.className="PDOddRow"" > <td class="results"> 6. How will the inspection staff work with PennDOT to assure the contractor meets the project milestones? </td> <td class="results right"> 10%<input type=hidden name=SELECT_CRITERIA_WEIGHT_PCT value='10'> </td> </tr> <tr class='PDEvenRow' onMouseOver="this.className="highlight"" onMouseOut="this.className="PDEvenRow"" > <td class="results"> 7. How did the team perform on past projects? </td> <td class="results right"> 5%<input type=hidden name=SELECT_CRITERIA_WEIGHT_PCT value='5'> </td> </tr> <tr class='PDEvenRow' onMouseOver="this.className="highlight"" onMouseOut="this.className="PDEvenRow"" > <td class="label"> Weight Total: </td> <td class="results right"> 100% </td> </tr></table> </td></tr></table></td></tr></table><table class="Section1" ><tr class="Section1" ><td class="Section1" ><table class="Section1Title" ><tr class="Section1Title" ><td class="Section1Title" >Staff Classification</td></tr></table><table class="Section1Body" ><tr class="Section1Body" ><td class="Section1Body" ><table class="body"> <colgroup> <col WIDTH='100%'> </colgroup> <tr class="body"> <td class="data"> The qualifications and experience required of the firm's inspectors will be established by the Department, and the qualifications of the firm's proposed employees will be reviewed and approved by the Department. <br><br> It is anticipated that a supplementary construction inspection staff for this assignment will consist of the following number of inspectors who meet the requirements for the inspection classifications as detailed in the General Requirements and any additional requirements set forth in this advertisement. The classifications of TCIS, TCI and TA have been amended to identify multiple levels of compensation based on experience and training. Please refer to the General Requirements for the changes. For these three classifications, the submitting firm may propose either a TCIS-1 or 2 for each TCIS required, either a TCI-1, 2, or 3 for each TCI required and either a TA-1 or 2 for each TA required. The maximum hourly rate for each of these sub-classifications is stated later in this advertisement. The Maximum Straight Time Hourly Payroll Rate shown in the following table is the maximum rate for the highest sub-classification. </td> </tr></table><br> <table class="results"> <colgroup> <col WIDTH='80%' class="left"> <col WIDTH='10%' class="left"> <col WIDTH='10%' class="left"> </colgroup> <tr class="results"> <th class="results" nowrap> <label class="PDLabel" >Staff Description</label> </th> <th class="results" nowrap> <label class="PDLabel" >Inspectors</label> </th> <th class="results" nowrap> <label class="PDLabel" >Resumes</label> </th> </tr> <tr class='PDEvenRow' onMouseOver="this.className="highlight"" onMouseOut="this.className="PDEvenRow"" > <td class="results"> TA (Transportation Assistant) </td> <td class="results"> 4 </td> <td class="results"> 0 </td> </tr> <tr class='PDOddRow' onMouseOver="this.className="highlight"" onMouseOut="this.className="PDOddRow"" > <td class="results"> TCI (Transportation Construction Inspector) </td> <td class="results"> 4 </td> <td class="results"> 4 </td> </tr> <tr class='PDEvenRow' onMouseOver="this.className="highlight"" onMouseOut="this.className="PDEvenRow"" > <td class="results"> TCIS (Transportation Construction Inspector Supervisor) </td> <td class="results"> 3 </td> <td class="results"> 3 </td> </tr> </table><table class="body"> <colgroup> <col WIDTH='100%'> </colgroup> <tr class="body"> <td class="data"> <br> Maximum straight time payroll reimbursement per hour for subsequent calendar years, if applicable, will be established at the scope of work meeting.<P>In order to be capable of addressing any tasks associated with the contractor's activities over the life of the project, the Department reserves the right to increase or decrease inspection staff on each part (or work order).<P>The number of inspectors and classifications listed above is solely for the selection process. This is an estimate based on available information at the time of the advertisement. Understandably, the number and classifications may vary depending on various factors. Adjustments can be made provided the staffing requested is within the standard scope of work. <br> <br> The Maximum straight time hourly payroll rate is the maximum straight time hourly rate paid to an employee in a specific Department Payroll Classification. The Department reserves the right to negotiate hourly payroll rates of individuals based on knowledge, experience and education up to the payroll classification maximum hourly payroll rate. <br><br> The maximum straight time hourly payroll rate for each specific Department Payroll Classification as of July 1, 2026 is as follows: <br> <br> <table class="results"> <tr class="results"> <td class="results">1. Transportation Construction Manager: TCM-2 $46.01, TCM-1 $40.35</td> </tr> <tr class="results"> <td class="results">2. Transportation Construction Inspector Supervisor: TCIS-2 $37.77, TCIS-1 $36.08</td> </tr> <tr class="results"> <td class="results">3. Transportation Construction Inspector: TCI-3 $33.03, TCI-2 $31.66, TCI-1 $30.24</td> </tr> <tr class="results"> <td class="results">4. Transportation Assistant: TA-2 $25.47, TA-1 $21.65</td> </tr> <tr class="results"> <td class="results">5. Coatings Inspector: CI-3 $50.20, CI-2 $42.16, CI-1 $30.95</td> </tr> </table> </td> </tr></table></td></tr></table></td></tr></table> <table class="Section1" ><tr class="Section1" ><td class="Section1" ><table class="Section1Title" ><tr class="Section1Title" ><td class="Section1Title" >Work Task</td></tr></table><table class="Section1Body" ><tr class="Section1Body" ><td class="Section1Body" > <table class="body"> <colgroup> <col WIDTH='100%'> </colgroup> <tr class="body"> <td class="data"> <p style="margin-right:0in; margin-left:0in"><span style="font-size:10pt"><span style="background:white"><span style="font-family:Arial,sans-serif"><span style="color:black"><span style="font-size:11.0pt"><span style="font-family:"Times New Roman",serif">Please complete and attach an <b>Employee Summary Sheet</b> that shows the following breakdown of information. Please submit information in a chart format. Order chart by position (highest to lowest) then by name of the individual.<b> </b>This sheet will not count toward the maximum number of pages for a Statement of Interest.</span></span></span></span></span></span></p><p style="margin-right:0in; margin-left:0in"><span style="font-size:10pt"><span style="background:white"><span style="font-family:Arial,sans-serif"><span style="color:black"><b><span style="font-size:11.0pt"><span style="font-family:"Times New Roman",serif">Only names proposed on project should appear on chart:</span></span></b></span></span></span></span></p><p style="margin-right:0in; margin-left:0in"><span style="font-size:10pt"><span style="background:white"><span style="font-family:Arial,sans-serif"><span style="color:black"><span style="font-size:11.0pt"><span style="font-family:"Times New Roman",serif">1. APPLICANT NAME - indicate classification as shown on the current proposal.</span></span></span></span></span></span></p><p style="margin-right:0in; margin-left:0in"><span style="font-size:10pt"><span style="background:white"><span style="font-family:Arial,sans-serif"><span style="color:black"><span style="font-size:11.0pt"><span style="font-family:"Times New Roman",serif">2. YEARS WITH FIRM</span></span></span></span></span></span></p><p style="margin-right:0in; margin-left:0in"><span style="font-size:10pt"><span style="background:white"><span style="font-family:Arial,sans-serif"><span style="color:black"><span style="font-size:11.0pt"><span style="font-family:"Times New Roman",serif">3. YEARS WITH OTHER FIRMS PERFORMING HIGHWAY CONSTRUCTION INSPECTION</span></span></span></span></span></span></p><p style="margin-right:0in; margin-left:0in"><span style="font-size:10pt"><span style="background:white"><span style="font-family:Arial,sans-serif"><span style="color:black"><span style="font-size:11.0pt"><span style="font-family:"Times New Roman",serif">4. YEARS OF INSPECTION EXPERIENCE ON PennDOT PROJECTS</span></span></span></span></span></span></p><p style="margin-right:0in; margin-left:0in"><span style="font-size:10pt"><span style="background:white"><span style="font-family:Arial,sans-serif"><span style="color:black"><span style="font-size:11.0pt"><span style="font-family:"Times New Roman",serif">5. YEARS OF DISTRICT 8-0 INSPECTION EXPERIENCE</span></span></span></span></span></span></p><p style="margin-right:0in; margin-left:0in"><span style="font-size:10pt"><span style="background:white"><span style="font-family:Arial,sans-serif"><span style="color:black"><span style="font-size:11.0pt"><span style="font-family:"Times New Roman",serif">6. YEARS IN INSPECTION</span></span></span></span></span></span></p><p style="margin-right:0in; margin-left:0in"><span style="font-size:10pt"><span style="background:white"><span style="font-family:Arial,sans-serif"><span style="color:black"><span style="font-size:11.0pt"><span style="font-family:"Times New Roman",serif">7. NECEPT BITUMINOUS CERTIFICATION – indicate YES/NO</span></span></span></span></span></span></p><p style="margin-right:0in; margin-left:0in"><span style="font-size:10pt"><span style="background:white"><span style="font-family:Arial,sans-serif"><span style="color:black"><span style="font-size:11.0pt"><span style="font-family:"Times New Roman",serif">8. NECEPT CONCRETE TECHNICIAN CERTIFICATION - indicate YES/NO</span></span></span></span></span></span></p><p style="margin-right:0in; margin-left:0in"><span style="font-size:10pt"><span style="background:white"><span style="font-family:Arial,sans-serif"><span style="color:black"><span style="font-size:11.0pt"><span style="font-family:"Times New Roman",serif">9. NICET - indicate LEVEL</span></span></span></span></span></span></p><p style="margin-right:0in; margin-left:0in"><span style="font-size:10pt"><span style="background:white"><span style="font-family:Arial,sans-serif"><span style="color:black"><span style="font-size:11.0pt"><span style="font-family:"Times New Roman",serif">10. GUIDE RAIL INSTALLATION, REPLACEMENT AND MAINTENANCE CERTIFICATION - indicate YES/NO</span></span></span></span></span></span></p><p><span style="font-size:11.0pt"><span style="font-family:"Times New Roman",serif">11. PROPRIETARY TRAFFIC BARRIER and END TREATMENT CERTIFICATION - indicate YES/NO</span></span></p><p>The firm selected may be required to attend a pre-construction conference with the Department and the construction contractor for this project. Under the supervision and direction of the department the selected firm will be required to keep records and document the construction work prepare current and final estimates for payment to the construction contractor assist the Department in obtaining compliance with the labor standards safety and accident prevention and equal opportunity provisions of the contract item. The selected firm may also be required to perform other duties as needed.</p><table border="0" cellpadding="0" cellspacing="0" style="display: none;"> <tbody> <tr> <td> </td> </tr> </tbody></table><p> </p> <br><br> Firms applying must have qualified personnel capable of climbing structures during painting, rehabilitation, or construction. </td> </tr> </table></td></tr></table></td></tr></table> <table class="Section1" ><tr class="Section1" ><td class="Section1" ><table class="Section1Title" ><tr class="Section1Title" ><td class="Section1Title" >Equipment</td></tr></table><table class="Section1Body" ><tr class="Section1Body" ><td class="Section1Body" ><table class="body"> <colgroup> <col WIDTH='100%'> </colgroup> <tr class="body"> <td class="data"> The firm selected will be required to supply the following equipment for use by the consultant inspection staff at their actual cost not to exceed the maximum direct reimbursement shown below: <br> </td> </tr></table> <table class="results"> <colgroup> <col WIDTH='45%' class="left"> <col WIDTH='45%' class="left"> <col WIDTH='10%' class="left"> </colgroup> <tr class="resultsheader"> <th class="results" nowrap> <label class="PDLabel" >Description</label> </th> <th class="results" nowrap> <label class="PDLabel" >Max Reimbursement</label> </th> <th class="results" nowrap> <label class="PDLabel" >Qty</label> </th> </tr> <tr class='PDEvenRow' onMouseOver="this.className="highlight"" onMouseOut="this.className="PDEvenRow"" > <td class="results"> Cellular Phones </td> <td class="results"> As per invoice (Cell Phone Usage) </td> <td class="results"> 11 </td> </tr> <tr class='PDOddRow' onMouseOver="this.className="highlight"" onMouseOut="this.className="PDOddRow"" > <td class="results"> iPads </td> <td class="results"> As per invoice (iPad Usage) </td> <td class="results"> 11 </td> </tr> </table><table class="body"> <colgroup> <col WIDTH='100%'> </colgroup> <tr class="body"> <td class="data"> <br> If the equipment is self-owned, reimbursement will be based on actual cost of ownership not to exceed the maximum allowable. If equipment is from an outside supplier, the engineer must secure a minimum of three written quotes. The Department reserves the right to request additional quotes.<br><br>A maximum daily reimbursement amount for mileage to and from the work site will be established by multiplying 150 miles by the maximum Department allowable mileage rate per mile. The maximum reimbursed mileage is 75 miles each way for any given day. Mileage will be reimbursed for the shortest distance route from the inspector's residence to the work site and return using primarily state routes. A commuting distance of 15 miles each direction will be considered a normal commuting distance from the inspector's residence and will not be eligible for mileage reimbursement. An inspector will be reimbursed for either mileage to and from the work site or lodging, but will not be reimbursed for a combination of the two during the same day.<br><br>If using Lodging:<br><br>The only exception to the mileage above would be the first day of the work week if lodging is used. Mileage to the jobsite, up to 75 miles, and lodging for the first night will be allowed. Lodging will be reimbursed up to the current GSA maximum allowable lodging rates for the area where the inspector is working in lieu of mileage. Receipts for all costs must be provided to the Department upon request. Lodging will be reimbursed only for employees whose homes are more than 65 miles from the work site. The current GSA maximum allowable lodging rate for the month invoiced is required to be submitted with each invoice when lodging reimbursement is requested. Mileage home on the last day of the week would be reimbursed up to 75 miles home.<br><br>If using extended stay lodging through a hotel or apartment lodging for projects of long duration (60 days or more) the following management directive will apply:<br><br>The Department will need to approve the specifics regarding the rental costs. The documentation include calculations supporting the proposed costs prior to the firm actually using an apartment/hotel as extended lodging. The analysis should include the cost breakdown that shows the cost savings for renting an apartment as opposed to staying in a hotel daily. Therefore, the firm would need to show the cost benefit vs. paying for the normal lodging. The firm should come up with the total cost as a monthly cost (this being lower than lodging for a month) and the cost would be entered under Other Costs at a number of months (units) at the given cost. If the price proposal is already developed then you can enter the cost in the Commute/Lodging Miles category and include a comment that this cost includes the apartment lodging.<br><br>The following rule has been adopted from the Commonwealth Travel Manual 230.1<br><br>"Reimbursement will be limited to lodging, necessary utilities (cable and phone are excluded), and mileage or transportation costs for a biweekly roundtrip between the worksite and the traveler's permanent residence or headquarters. Subsistence expenses are not allowed. Mileage is not paid between lodging and temporary worksite." </td> </tr></table></td></tr></table></td></tr></table> <table class="Section1" ><tr class="Section1" ><td class="Section1" ><table class="Section1Title" ><tr class="Section1Title" ><td class="Section1Title" >Requirements</td></tr></table><table class="Section1Body" ><tr class="Section1Body" ><td class="Section1Body" > <table class="body"> <colgroup> <col WIDTH='100%'> </colgroup> <tr class="body"> <td class="data"> <p style="margin:0in 0in 8pt"><span style="font-size:12pt"><span style="line-height:107%"><span new="" roman="" style="font-family:" times=""><b><span style="font-size:11.0pt"><span style="line-height:107%">iPad Requirements</span></span></b></span></span></span></p><p style="margin:0in 0in 8pt"><span style="font-size:12pt"><span style="line-height:107%"><span new="" roman="" style="font-family:" times=""><span style="font-size:11.0pt"><span style="line-height:107%">Monthly cost for data ($30/month/device) is an estimate only.<br />- All inspection staff are required to have iPads<span style="color:#003e7e"> with 5G service</span> capable of running the latest version of iOS.<br />- PennDOT apps are designed to support devices which are running the latest version of iOS.<br />- iPad’s must have at least a minimum of 256 GB internal storage.<br />- Cost of device and IT support services will be the responsibility of the consultant.<br />- Cellular service costs may be reimbursed if the firm can provide a written policy to ensure direct project costs. This documentation must be attached to the technical proposal for each firm charging cellular service.</span></span></span></span></span></p><p style="margin:0in 0in 8pt"><span style="font-size:12pt"><span style="line-height:107%"><span new="" roman="" style="font-family:" times=""><span style="font-size:11.0pt"><span style="line-height:107%">-All PennDOT apps will be made available via the Apple App Store for free and user accounts will be needed for access. For any questions related to the PennDOT approval process or ECMS credentials, please visit </span></span><a href="http://www.dotdom3.state.pa.us/ecms/BP_Reg/index.html" style="color:#0563c1; text-decoration:underline"><span style="font-size:11.0pt"><span style="line-height:107%">http://www.dotdom3.state.pa.us/ecms/BP_Reg/index.html</span></span></a><span class="MsoHyperlink" style="color:#0563c1"><span style="text-decoration:underline"><span style="font-size:11.0pt"><span style="line-height:107%">.</span></span></span></span></span></span></span></p><table border="0" cellpadding="0" cellspacing="0" style="display: none;"> <tbody> <tr> <td> </td> </tr> </tbody></table><p>Design work for these projects was performed in-house.</p> <br><br> All questions and answers are required to go through ECMS's "Questions and Responses" forum.<br><br><!-- CQ#11822-Naga --> The statement of interest, at a minimum, should indicate how the selected firm will accomplish the tasks outlined and provide the services as detailed. The anticipated duration of the agreement is <label class="PDLabel" >1 year</label><input type=hidden name=CONTRACT_DURATION_CODE value='01'>. <br><br> <!-- Naga-CQ#32260 --> The goal for Disadvantaged Business Enterprise (DBE) participation in this agreement shall be <label class="PDLabel" >0</label><input type=hidden name=DBE_GOAL_PCT value='0'> of the total agreement cost. Cost included in a DBE firm's price proposal as direct cost of work and services by others shall not count as DBE participation in this agreement, unless completed by a DBE firm. Additional information concerning DBE participation in this agreement is contained in the General Requirements and Information Section referenced below. <br><br> Additional information regarding this Agreement/Advertisement and Statement of Interest requirements are contained in the <A class="pdlink" href="SVCOMFileCabinet?action=GETURL&FILE_NAME=Advertisement General Requirements - Construction Inspection Services&FILE_DATE=06/26/2026"> General Requirements</a> document. </td> </tr> </table></td></tr></table></td></tr></table><table class="Section1" ><tr class="Section1" ><td class="Section1" > <table class="Section1Title" ><tr class="Section1Title" ><td class="Section1Title" >Attachment</td></tr></table> <table class="Section1Body" ><tr class="Section1Body" ><td class="Section1Body" > <table class="body"> <tr class="body"> <td class="data"> There is no file attachment. </td> </tr> </table> </td></tr></table></td></tr></table>
<table class="Section1" ><tr class="Section1" ><td class="Section1" >
<table class="Section1Title" ><tr class="Section1Title" ><td class="Section1Title" >Questions and Responses
</td><td class="Section1Title Right" >
<button lang="javascript" name="New" class="PDButton" onmouseover="this.className='PDButton PDButtonHover'" onmouseout="this.className='PDButton'" title="New Question" onClick="return checkSelectionConfirmation('true', "setAction('CreateQuestion')", '') && doPDButton('submit', 'pdform', "");" >New</button>
</td></tr></table>
<table class="Section1Body" ><tr class="Section1Body" ><td class="Section1Body" >
<table class="body">
<tr class="body">
<td class="body"><i>No records found.</i></td>
</tr>
</table>
</td></tr></table>
</td></tr></table>
<table class="Section1" ><tr class="Section1" ><td class="Section1" >
<table class="Section1Title" ><tr class="Section1Title" ><td class="Section1Title" >Contact Information</td></tr></table>
<table class="results">
<colgroup>
<col WIDTH='25%' class="left">
<col WIDTH='35%' class="left">
<col WIDTH='15%' class="left">
<col WIDTH='15%' class="left">
<col WIDTH='10%' class="left">
</colgroup>
<tr class="resultsheader">
<th class="results" nowrap>
<label class="PDLabel" >Name</label>
</th>
<th class="results" nowrap>
<label class="PDLabel" >Email</label>
</th>
<th class="results" nowrap>
<label class="PDLabel" >Phone</label>
</th>
<th class="results" nowrap>
<label class="PDLabel" >Fax</label>
</th>
<th class="results" nowrap>
<label class="PDLabel" >Org</label>
</th>
</tr>
<tr class='PDEvenRow' onMouseOver="this.className="highlight"" onMouseOut="this.className="PDEvenRow"" >
<td class="results">
Brian J. Blake
</td>
<td class="results" nowrap>
<a href="mailto:bblake@pa.gov" title="Send Email" class="PDLink">bblake@pa.gov</a><input type=hidden name=EMAIL_ADDRESS value='bblake@pa.gov'>
</td>
<td class="results">
(717) 783-7973
</td>
<td class="results">
(717) 772-0397
</td>
<td class="results">
0800
</td>
</tr>
</table>
</td></tr></table>
<table class="Section1" ><tr class="Section1" ><td class="Section1" >
<table class="Section1Title" ><tr class="Section1Title" ><td class="Section1Title" >History</td></tr></table>
<table class="results">
<colgroup>
<col WIDTH='10%' class="left">
<col WIDTH='10%' class="left">
<col WIDTH='*' class="left">
</colgroup>
<tr class="resultsheader">
<th class="results" nowrap>
<label class="PDLabel" >Published</label>
</th>
<th class="results" nowrap>
<label class="PDLabel" >SOI Deadline</label>
</th>
<th class="results" nowrap>
<label class="PDLabel" >Revised Description</label>
</th>
</tr>
<tr class='PDEvenRow' onMouseOver="this.className="highlight"" onMouseOut="this.className="PDEvenRow"" >
<td class="results">
<A href="SVADVPublish?action=ShowPublishedAdvertisement&ADV_ID=19,309
&AS_PUBLISHED_ID=1" class="results"/>
09/28/2026
</A>
</td>
<td class="results">
10/15/2026
</td>
<td class="results">
</td>
</tr>
</table>
</td></tr></table>
</form>
<table class="footer">
<colgroup>
<col width="175px" nowrap/>
<col width="*" nowrap/>
<col width="175px" nowrap/>
</colgroup>
<tr class="footer">
<td class="footer" colspan="3">
You are currently logged in as
- Detail Fetched
- Yes