This project consists of the replacement of the bridge that carries S.R. 4019 (Leger Road) over Brush Creek. Also included will be roadway approach work, drainage upgrades, guide rail upgrades, signing upgrades, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 4019, SECTION C10, in Westmoreland COUNTY North Huntingdon TOWNSHIP from approximately one-hundred sixty-six (166) feet south of the intersection of S.R. 4019 (Leger Road) and T-839 (Ardara Road) at segment 0060 offset 2200 to approximately 736 feet east of the same intersection at segment 0070 offset 0720.
Additional Information: This is an ECMS project. All Addenda will be electronically posted. The location of the public bid opening is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg. Allow sufficient time before the bid opening to obtain a visitor pass on the 5th Floor and to be escorted to the 7th Floor Contract Awards Room.
Replacement of the bridge that carries S.R. 4019 (Leger Road) over Brush Creek, including roadway approach work, drainage upgrades, guide rail upgrades, signing upgrades, and other miscellaneous construction as indicated on the approved drawings for State Route 4019, Section C10, from approximately 166 feet south of the intersection with T-839 to approximately 736 feet east of the same intersection.
We post new structural work opportunities in Pennsylvania as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Pennsylvania work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Pennsylvania Department of Transportation (PennDOT) (solicitation PENNDOT_89066_1), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.