The project is for repairs to 10 (Ten) Stormwater Control Measures (SCM) includes debris removal, regarding basin footprints, removal of invasive vegetation, repairing outlet structures, replacing pipes and underdrains, erosion and sinkhole repairs, reseeding basins for long term stabilization and other miscellaneous construction, as indicated on the approved drawings included in the bid package for the Districtwide SWM - MS4 Improvements Group 2 in (New Britain, Warrington and Doylestown Township in Bucks County), in (West Whiteland and Tredyffrin Township in Chester County), in (Upper Merion and Springfield Township in Montgomery County).
Additional Information: This is an ECMS project. All Addenda will be electronically posted. The location of the public bid opening is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg. Allow sufficient time before the bid opening to obtain a visitor pass on the 5th Floor and to be escorted to the 7th Floor Contract Awards Room.
Repairs to 10 Stormwater Control Measures including debris removal, regarding basin footprints, removal of invasive vegetation, repairing outlet structures, replacing pipes and underdrains, erosion and sinkhole repairs, reseeding basins for long term stabilization and other miscellaneous construction as indicated on the approved drawings in the bid package.
We post new excavating opportunities in Pennsylvania as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Pennsylvania work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Pennsylvania Department of Transportation (PennDOT) (solicitation PENNDOT_81915_1), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.