The description and location of the project is as follows: For the bridge preservations, paving, drainage, guide rail, curb and sidewalk, signing and pavement markings, and other miscellaneous construction, all within a length of 4,471.08 linear feet (0.847 miles) as indicated on the approved drawings included in the bid package for CORAOPOLIS-NEVILLE ISLAND BRIDGE, SHADES RUN BRIDGE NO. 3, TURTLE CREEK BRIDGE NO. 19, and SUTERSVILLE BRIDGE, in ALLEGHENY and WESTMORELAND COUNTIES, MUNICIPALITY OF MONROEVILLE, CORAOPOLIS and SUTERSVILLE BOROUGHS, NEVILLE, PENN HILLS, ELIZABETH, PENN and SEWICKLEY TOWNSHIPS, Commonwealth of Pennsylvania. This project being situated as follows: Coraopolis-Neville Island Bridge: From a point approximately 140 feet north of Fifth Avenue (State Route 51) at Station 1+35 to a point approximately 40 feet east of Von Stein Lane at Station 23+00. Shades Run Bridge No. 3: From a point approximately 710 feet east of Lincoln Avenue Extension at Station 5+00 to a point approximately 40 feet west of Lincoln Avenue Extension at Station 13+37. Turtle Creek Bridge No. 19: From a point approximately 175 feet north of Sycamore Lane at Station 6+00 to a point approximately 35 feet south of Westmoreland Heritage Trail at Station 11+66. Sutersville Bridge (State Routes 2020 and 3045): From a point approximately 110 feet south of Blythedale Road (State Route 2017) at Station 8+73 to a point approximately 80 feet east of First Avenue (State Route 3039) at Station 21+78.
Additional Information: This is an ECMS project. All Addenda will be electronically posted. The location of the public bid opening is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg. Allow sufficient time before the bid opening to contact Contract Awards and be escorted to the 7th Floor Contract Awards Room. Contract Awards can be reached at 717-395-9754. Due to recent changes in the Keystone Building, there is no longer a reception on the 5th Floor to greet and check-in visitors.
The work includes bridge preservations, paving, drainage, guide rail, curb and sidewalk, signing and pavement markings, and other miscellaneous construction, all within a length of 4,471.08 linear feet (0.847 miles) as indicated on the approved drawings included in the bid package for CORAOPOLIS-NEVILLE ISLAND BRIDGE, SHADES RUN BRIDGE NO. 3, TURTLE CREEK BRIDGE NO. 19, and SUTERSVILLE BRIDGE, in ALLEGHENY and WESTMORELAND COUNTIES, MUNICIPALITY OF MONROEVILLE, CORAOPOLIS and SUTERSVILLE BOROUGHS, NEVILLE, PENN HILLS, ELIZABETH, PENN and SEWICKLEY TOWNSHIPS, Commonwealth of Pennsylvania.
We post new asphalt opportunities in Pennsylvania as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Pennsylvania work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Pennsylvania Department of Transportation (PennDOT) (solicitation PENNDOT_28426_1), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.