Read this notice and pull out the scope, the deadlines and what you have to submit.
The SR 0083-091 project consists of the widening, realignment, and reconstruction of I-83, with three lanes in each direction throughout the project limits plus 12-foot median and outside shoulders. Additional roadway improvements include the relocation of Ramps X and Z at Exit 21 and the reconstruction of SR 4055 (Toronita Street), T-511 (Queen Street), T-509/T-513 (10th Avenue), and Columbia Avenue. The I-83 bridge over Mill Creek (2-span) will be replaced with a single-span bridge. Three bridges carrying I-83 over the Norfolk Southern Yard (5-span), SR 1033 (Loucks Mill Road) (3-span), and Codorus Creek (7-span) will be replaced with a single 8-span structure. Other structure work includes the lengthening of an existing culvert running under I-83, the construction of a new culvert under relocated Ramp X, and the construction of a new pedestrian culvert providing access to the east and west sides of I-83. This project will also relocate roughly 1,450 linear feet of Channel 31 located along Columbia Avenue. Other work includes: four overhead sign structures, highway lighting, ITS, signal upgrades, pavement markings, sidewalk & pedestrian ramps, incorporated utility relocation work, planting/landscaping, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0083, SECTION 091, in YORK COUNTY, SPRINGETTSBURY, MANCHESTER, & SPRING GARDEN TOWNSHIPS and NORTH YORK BOROUGH, from 1,700 feet south of the Eberts Lane overpass at Segment 0184/0185 Offset 1146/1146 to just south of the I-83 overpass of SR 0030 at Segment 0210/0211 Offset 0487/0487. The SR 0083-090 project consists of the relocation of roughly 4,600 linear feet of Mill Creek which runs adjacent to I-83. The Mill Creek relocation will include the installation of numerous in-stream structures and extensive planting in the adjacent floodplain. Additional improvements include the grading and installation of floodplain wetland basins adjacent to Eden Road and Graham Street. Other work includes: incorporated utility relocation work, planting/landscaping, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0083, SECTION 090, in YORK COUNTY, SPRINGETTSBURY, MANCHESTER, & SPRING GARDEN TOWNSHIPS, from 750 feet east (upstream) of the Eberts Lane bridge over Mill Creek to a point just north (downstream) of the I-83 overpass of Mill Creek. Overall project length is 16,901.26 linear feet (3.201 miles).
Additional Information: This is an ECMS project. All Addenda will be electronically posted. The location of the public bid opening is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg. Allow sufficient time before the bid opening to obtain a visitor pass on the 5th Floor and to be escorted to the 7th Floor Contract Awards Room.
We post new asphalt opportunities in Pennsylvania as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Pennsylvania work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: Pennsylvania Department of Transportation (PennDOT) (solicitation PENNDOT_112550_1), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.