The description and location of the project is as follows: Scope of work includes 8.0 miles of I-80 eastbound reconstruction,1.6 miles of I-80 westbound reconstruction, 0.3 miles of SR 309 reconstruction at the I-80 interchange with the addition of traffic signals, ramp reconstruction at I-80 and SR 309, and eastbound rest area and ramp reconstruction at Mile 270. The project includes 4 structure replacements on I-80 EB, 3 structure replacements on I-80 WB, 5 culvert rehabilitations, roadway barrier upgrades, drainage updates, new signing and pavement markings, a new area-wide ITS system, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE I-80 / SR 309, SECTION 311, in LUZERNE COUNTY, BOROUGH OF WHITE HAVEN and BUTLER, DENNISON, AND FOSTER TOWSNHIPS from approximately 1.5 MILES WEST of SR 309 from I-80 EB/WB segment 2610/2605 offset 1248/0201 to approximately 0.1 MILES EAST of SR 940 from I-80 EB/WB segment 2724/2725 offset 0093/0570 and from approximately 0.4 MILES SOUTH of I-80 from SR 309 NB/SB segment 280/0281 offset 0639/0639 to approximately 0.3 MILES NORTH of I-80 from SR 309 segment 0290 offset 1652.
Additional Information: This is an ECMS project. All Addenda will be electronically posted. The location of the public bid opening is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg. Allow sufficient time before the bid opening to obtain a visitor pass on the 5th Floor and to be escorted to the 7th Floor Contract Awards Room.
Scope of work includes 8.0 miles of I-80 eastbound reconstruction, 1.6 miles of I-80 westbound reconstruction, 0.3 miles of SR 309 reconstruction at the I-80 interchange with the addition of traffic signals, ramp reconstruction at I-80 and SR 309, and eastbound rest area and ramp reconstruction at Mile 270. The project includes 4 structure replacements on I-80 EB, 3 structure replacements on I-80 WB, 5 culvert rehabilitations, roadway barrier upgrades, drainage updates, new signing and pavement markings, a new area-wide ITS system, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE I-80 / SR 309, SECTION 311, in LUZERNE COUNTY, BOROUGH OF WHITE HAVEN and BUTLER, DENNISON, AND FOSTER TOWSNHIPS from approximately 1.5 MILES WEST of SR 309 from I-80 EB/WB segment 2610/2605 offset 1248/0201 to approximately 0.1 MILES EAST of SR 940 from I-80 EB/WB segment 2724/2725 offset 0093/0570 and from approximately 0.4 MILES SOUTH of I-80 from SR 309 NB/SB segment 280/0281 offset 0639/0639 to approximately 0.3 MILES NORTH of I-80 from SR 309 segment 0290 offset 1652.
We post new asphalt opportunities in Pennsylvania as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Pennsylvania work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Pennsylvania Department of Transportation (PennDOT) (solicitation PENNDOT_107495_1), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.