The scope of work for ECEP Cooling Tower Basin Improvements includes, but is not limited to: **A. ** Provide and Install sluice gates at (3) existing basin openings in between cooling tower cells 3 and 4 **B. ** Provide and Install a 24" CWR bypass pipe between the north side header to the south side header **C. ** Provide and Install butterfly valves at the connection to the existing north header and at the connection to the existing south header **D. ** Replace the pneumatic actuators with electric actuators on the existing cooling tower inlet valves for Cooling Towers 1,2, and 3 **E. ** Replace the butterfly valve and pneumatic actuator with an electric actuator at the tower inlet for Cooling Tower 4 **F. ** Provide and install isolation butterfly valves in the main condenser water header between the takeoffs for CT-1 and CT-2, between the takeoffs for CT-2 and CT-3, and between the takeoffs for CT-3 and CT-4 **G. ** Provide and install solenoid valves at the chemical treatment discharge pipes for each cooling tower basin **H. ** Provide control modifications for operation of the sluice gates, tower isolation valves, header isolation valves, and chemical treatment discharge valves You must be a registered bidder through PlanetBids™ to obtain the supporting attachments to this project. BID LINK HERE: https://vendors.planetbids.com/portal/62171/bo/bo-detail/146496 Commodities: Heating and cooling and air conditioning HVAC construction and maintenance services; Insulation of pipes and boilers service; Heat exchanger maintenance or repair service; Fin fan cooling tower maintenance and repair service; Pipefitting maintenance or repair service
The scope of work includes providing and installing sluice gates at three existing basin openings between cooling tower cells 3 and 4; providing and installing a 24" CWR bypass pipe between the north side header to the south side header; providing and installing butterfly valves at connections to existing north and south headers; replacing pneumatic actuators with electric actuators on existing cooling tower inlet valves for Cooling Towers 1, 2, and 3; replacing the butterfly valve and pneumatic actuator with an electric actuator at the tower inlet for Cooling Tower 4; providing and installing isolation butterfly valves in the main condenser water header between takeoffs for CT-1 and CT-2, CT-2 and CT-3, and CT-3 and CT-4; providing and installing solenoid valves at the chemical treatment discharge pipes for each cooling tower basin; and providing control modifications for operation of the sluice gates, tower isolation valves, header isolation valves, and chemical treatment discharge valves.
We post new plumbing opportunities in Florida as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Florida work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Central Florida Tourism Oversight District (solicitation 17067), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.