LNA Southside Redevelopment Program Phase 3
The work generally consists of: The expansion of the existing airfield electrical vault by approximately 2,500 square feet and includes interior renovation of the existing structure and replacement of the existing roof. The work includes modifications to the existing HVAC system and Fire Protection system. The expansion increases the vault electrical capacity also includes the relocation of the existing regulators, ALCMS control system, fiber optic cable power and communication wiring. Replacement of the standby emergency power generator is included as an additive alternate bid item.
The work generally consists of: The expansion of the existing airfield electrical vault by approximately 2,500 square feet and includes interior renovation of the existing structure and replacement of the existing roof. The work includes modifications to the existing HVAC system and Fire Protection system. The expansion increases the vault electrical capacity also includes the relocation of the existing regulators, ALCMS control system, fiber optic cable power and communication wiring. Replacement of the standby emergency power generator is included as an additive alternate bid item. Additional work includes demolition of existing structures, site clearing and grubbing, concrete work, asphalt paving, utility installation (water, sanitary sewer, storm drainage), electrical conduit and wiring, lighting, fencing, landscaping, and irrigation.
We post new electrical opportunities in Florida as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Florida work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Airports (solicitation IFB-120-LN 26-13-7), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.