The principal items of work and approximate quantities are:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction
Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32”
Diameter), 8,034 L.F.
Implementation of the Erosion and Sediment Pollution Control Plan -Weighted Sediment Filter
Tube, 260 L.F.
Fence, 1,742 L.F.
Clearing and Grubbing, 56.3 ACRE
Brush Barrier, 3,900 L.F.
Dewatering Impoundment, 1 L.S.
Subsurface Drain, 3,083 L.F.
Grading – Grading, 509,000 C.Y.
Grading – Hummocky Piles, 19.5 ACRE
Grading – Ripping, 15.9 ACRE
Channel Excavation - Permanent Channel Excavation, 574 C.Y.
Channel Lining - Erosion Matting, 1,432 S.Y.
Planting – Planting Preparation, 56.3 ACRE
Planting – Tree Seedlings, 24,072 EACH
Planting – Grass Seed, 1,136 LB.
Construction Surveying, 1 L.S.
Beginning on the Issue Date, free copies of bid documents can be obtained by going to www.BidExpress.com, PA Department of Environmental Protection.
The principal items are implementation of the erosion and sediment pollution control plan including rock construction entrance, 8,034 L.F. compost filter sock (32” diameter) and 260 L.F. weighted sediment filter tube, 1,742 L.F. fence, 56.3 ACRE clearing and grubbing, 3,900 L.F. brush barrier, dewatering impoundment, 3,083 L.F. subsurface drain, 509,000 C.Y. grading, 19.5 ACRE hummocky piles, 15.9 ACRE ripping, 574 C.Y. permanent channel excavation, 1,432 S.Y. erosion matting, 56.3 ACRE planting preparation, 24,072 tree seedlings, 1,136 LB. grass seed, and construction surveying.
We post new excavating opportunities in Pennsylvania as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Pennsylvania work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: PA eMarketplace (solicitation OSM 10(0670)101.1,102.1), retrieved via the Pennsylvania eMarketplace statewide procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.