OUC is seeking a supplier to Replace two septic systems at our Osceola facility located at 8400 Community Center Rd, St. Cloud, FL for the Orlando Utilities Commission. The scope includes but is not limited to: • Installation of (2) new septic tanks, pump tanks, and drain fields as specified in the engineering plans. • Confirm site conditions and critical elevations in the field before construction. • Obtain all required permits, including for abandonment of the existing system. • Follow Florida Code Chapter 62-6, Osceola County ordinances, and Florida Building Code. • Complete abandonment of (2) existing systems per regulatory procedures, including inspection. • Submit shop drawings for approval prior to fabrication/construction. • Ensure electrical work and control panels meet code requirements. • Coordinate with the Orlando Utilities Commission for electrical logistics and panel placement. • Comply with OSHA requirements for trenching and site safety.
The scope includes installation of (2) new septic tanks, pump tanks, and drain fields as specified in the engineering plans; confirming site conditions and critical elevations in the field before construction; obtaining all required permits, including for abandonment of the existing system; following Florida Code Chapter 62-6, Osceola County ordinances, and Florida Building Code; completing abandonment of (2) existing systems per regulatory procedures, including inspection; submitting shop drawings for approval prior to fabrication/construction; ensuring electrical work and control panels meet code requirements; coordinating with the Orlando Utilities Commission for electrical logistics and panel placement; and complying with OSHA requirements for trenching and site safety.
We post new waste management opportunities in Florida as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Florida work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Orlando Utilities Commission (solicitation PR_9654), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.