RFP 2026-80 Sandy River Force Main River Crossing Project â?? Progressive Design-Build
The work includes design and construction of a new force main crossing of the Sandy River, evaluation and selection of optimal alignment and trenchless crossing method, abandonment/removal/decommissioning of the existing force main crossing, modifications to the Sandy River Lane Pump Station and/or Timberline Rim Pump Station connections, removal of interim stabilization measures, and testing/commissioning/startup of the completed system. Phase 1 services include producing a basis-of-design report, engineering studies, design and specifications development, cost estimating, permit applications, easement identification, and GMP proposal submission. Phase 2 services include final design and stamped documents, procurement of equipment and subcontractors, securing permits, construction, commissioning and performance testing, and warranty coverage.
We post new plumbing opportunities in Oregon as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: OregonBuys (bid S-C01010-00018309), retrieved via the OregonBuys statewide open-bids board. View the official posting, and always confirm requirements and deadlines with the issuing agency.