Remove existing PCC and AC pavement with new pavement sections, install Weigh in Motion equipment, permanent pavement markings and temporary traffic control along Hwy 97 NB MP 272.23 and SB MP 270.89 in Klamath County Oregon.
Pre-Bid Conference: None.
The contractor shall remove existing PCC and AC pavement in sections totaling approximately 520 square yards; perform general excavation and subgrade stabilization; place aggregate base course and new asphalt concrete pavement (PG 64-28 grade, approximately 390 tons); install continuous and transverse rumble strips; apply permanent pavement markings (approximately 4,900 linear feet); install temporary traffic control measures including signs, devices, and flagging for both northbound and southbound locations; and install a complete ITS electrical system for weigh-in-motion sensors, including conduit, coaxial cable, connectors, telematics antennas, and associated infrastructure. Work must be completed within 21 consecutive calendar days beginning when the weigh-in-motion system is taken out of service, with substantial completion required by June 4, 2027.
We post new asphalt opportunities in Oregon as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: OregonBuys (bid S-73000-00018466), retrieved via the OregonBuys statewide open-bids board. View the official posting, and always confirm requirements and deadlines with the issuing agency.