PEDESTRIAN AND SIDEWALK IMPROVEMENTS
SH-19: FROM 0.1 MILES WEST OF THE US-177 JUNCTION,
EXTEND EAST IN THE TOWN OF STRATFORD.
PROJECT LENGTH = 1.32 MILES
The project involves pedestrian and sidewalk improvements along SH-19 from 0.1 miles west of the US-177 junction, extending east in the town of Stratford, for a length of 1.32 miles. Work items include unclassified excavation, borrow, temporary silt fence, temporary fiber log, sodding, aggregate base, separator fabric, geogrid reinforcement, traffic bound surface course, superpave, cold milling pavement, partial depth PCC patch, PCC for pavement, class A concrete for small structures, block retaining wall, concrete curb, concrete sidewalk, concrete driveway, tactile warning devices, manhole adjustments, removal of structures, fence, curb and gutter, asphalt pavement, concrete driveway, asphalt driveway, sidewalk, pipe railing, sitescaping, removal and resetting of signs, rectangular rapid flashing beacons, sheet aluminum signs, tube posts, traffic striping, pavement marking removal, construction signs, barricades, warning lights, drums, construction staking, SWPPP documentation and management, and mobilization.
We post new concrete opportunities in Oklahoma as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Oklahoma work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Oklahoma Department of Transportation (solicitation 270012), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.