TRAFFIC SIGNALS
CITY STREETS (SOUTH AIR DEPOT BOULEVARD AND SE 15TH STREET):
AT MULTIPLE INTERSECTIONS NORTH OF I-40 IN MIDWEST CITY.
PROJECT LENGTH = 0.00 MILES
The work includes roadway items such as earthwork, temporary silt fence, temporary sediment filter, solid slab sodding, PCC pavement, concrete curb, combined curb and gutter, concrete sidewalk, concrete driveway, tactile warning devices, manhole/valve box/meter box adjustments, removal of structures, curb, pavement, and sidewalk. Traffic signal work includes PVC conduit (bored and trenched), pull boxes, structural concrete, reinforcing steel, removal of pull boxes and traffic signal equipment, removal and resetting of traffic signal equipment, light poles, and signs, installation of poles and mast arms, pedestrian poles, traffic signal controller assemblies, signal system controller upgrades, video detection systems, pedestrian push buttons, signal heads, backplates, traffic signal electrical cable, optical detectors and cables, sheet aluminum signs, mast arm mounted signs, traffic striping, pavement marking removal, and traffic items. Traffic control includes construction signs, barricades, warning lights, drums, and channelizer cones. Also includes construction staking and mobilization.
We post new electrical opportunities in Oklahoma as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Oklahoma work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Oklahoma Department of Transportation (solicitation 250136), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.