ARIZONA SCIENCE CENTER STORMWATER AND SEWER PIPE REPLACEMENT
CONSTRUCTION MANAGER AT RISK SERVICES
OPENGOV ID NO. PW26740069
The City of Phoenix is seeking a qualified Construction Manager at Risk (CMAR) to provide preconstruction services and complete construction services for the ARIZONA SCIENCE CENTER STORMWATER AND SEWER PIPE REPLACEMENT CONSTRUCTION MANAGER AT RISK SERVICES project. The selected CMAR will work as a team with the designer of record and City staff to ensure an efficient design approach for the project. The project site is located at 600 E. Washington Street. The estimated construction cost is $8.2 million.
The purpose of this project is to provide Construction Manager at Risk (CMAR) services for the replacement, and/or other remedy methods approved by the design engineer, of all existing drain, waste, vent (DWV), and storm drainage systems serving the Arizona Science Center. The project will address aging and deteriorated plumbing infrastructure throughout the facility to improve system reliability, maintain operational continuity, and support the long-term functionality of the building.
The selected CMAR will provide comprehensive services throughout all phases of the project, including preconstruction, Guaranteed Maximum Price (GMP) development and contract transition, construction, project closeout, and warranty period services.
The Construction Manager at Risk will begin with the firm in an agency support role for preconstruction services. The CMAR will assume the risk of delivering the project through a Guaranteed Maximum Price (GMP) contract. The CMAR will be responsible for construction means and methods, and will be required to solicit bids from prequalified subcontractors to perform the work using the City’s subcontractor selection process. The CMAR may also compete to self-perform limited amounts of work. The GMP must be submitted in MAG or CSI format or it will not be accepted.
A. Preconstruction phase services by the CMAR may include the following:
Provide detailed cost estimating and knowledge of marketplace conditions and budget validation at designated design milestones
Design-phase collaboration and constructability reviews, including procurement and subcontractor selection recommendations
During the preconstruction phase, the CMAR will collaborate closely with the Owner and design team to evaluate design alternatives, identify constructability issues, develop value engineering recommendations, and establish procurement strategies for long-lead and critical materials
Provide project planning and scheduling
Provide for construction phasing and scheduling that will minimize interruption to City operations and allow for facility to remain open and operational during construction activities
Logistics and phasing plans to support ongoing facility operations
Site utilization and access planning
Pipe camera exploration and locating as needed to assist design process
Include pot holing as needed to identify system connections at building exterior
Provide add alternate for ADA upgrades, including adult changing stations
Provide alternate systems evaluation and constructability studies
Value engineering and cost-saving analyses
Advise City on ways to gain efficiencies in project delivery
Risk identification and mitigation planning
Provide long-lead procurement studies and initiate procurement of long-lead items
Assist in the permitting processes
Participate with the City in a process to set a goal for local and SBE participation and implement the local and SBE process
Protect the City’s sensitivity to quality, safety, and environmental factors
B. Construction phase services by the CMAR may include:
Following GMP acceptance, the CMAR will provide all construction services necessary to complete the work, including subcontractor management, quality control, safety oversight, schedule management, coordination with facility operations, and overall project delivery
Construction services shall include the replacement, and/or other remedy methods approved by design engineer, of all existing drain, waste, vent (DWV), and storm drainage systems serving facility. Remedy methods aside from replacement, may include: HDPE pipe using trenchless methods such as pipe bursting, cured in place pipe (CIPP) lining, or other alternative methods accepted by EOR and COP.
Select subcontractors/suppliers for this project
Prepare at least two (2) Guaranteed Maximum Price (GMP) proposals that each meet the approval of the City. Each GMP proposal will not exceed budget capacity for specified fiscal years.
Coordinate with various City of Phoenix departments, other agencies, utility companies, etc.
Arrange for procurement of materials and equipment
Schedule and manage site operations, with a focus on safety and security
Bid, award, and manage all construction related contracts while meeting City bid requirements including the local and SBE participation goal
Provide quality controls
Bond and insure the construction
Address all federal, state and local permitting requirements
Maintain a safe work site for all project participants
The CMAR shall prepare and maintain an emergency response plan that identifies designated points of contact and escalation procedures. During the construction phase, the CMAR shall provide 24-hour, 7-day emergency response coverage and respond in person to emergency situations on-site within two (2) hours of notification.
Include temporary restrooms as designed by EOR
Comply with COP building standards
The CMAR's services will continue through project closeout and warranty, including systems verification, punch-list completion, as-built documentation, operation and maintenance manual coordination, staff training support, warranty management, and resolution of post-construction issues to ensure successful project completion and Owner satisfaction.
Use of UNIFIER, an Application Service Provider (ASP) web-based project management database, may be required. The following information provides a guideline for utilization. Any questions related to the requirements of UNIFIER should be directed to the Project Manager.
The CMAR will be required to maintain all project records in electronic format.
The City provides an ASP web-based project management database which the CMAR will be required to utilize in the fulfillment of the contract requirements.
The CMAR shall provide a computerized networked office platform with broadband internet connectivity.
UNIFIER training will be provided through the City of Phoenix to firms under contract.
Only firms whose physical business is located within Maricopa County are eligible to meet the SBE subcontracting goal, which will be set prior to construction of this project. The final goal will be based on SBE subcontractor availability.
A pre-submittal meeting will be held at 11:00 am, Phoenix time on Tuesday, December 1, 2026, at Phoenix City Hall, 200 West Washington Street, 6th Floor, Conference Room 6 West AND via Teams. At this meeting, City staff will discuss the scope of work, general project requirements, and respond to questions from the attendees. It is strongly recommended that interested firms attend the pre-submittal meeting. Inquiries regarding the project scope outside of this pre-submittal meeting must be directed to the Contracts Specialist.
Pre-Submittal Meeting Teams Information:
https://teams.microsoft.com/meet/2198868857943990?p=1hUaChk4PwXfRglAnj
Meeting ID: 219 886 885 794 399 0
Passcode: tE9B65c7
Pre-Submittal Site Walk:
Monday, November 30, 2026 at 1:30PM
Location: Arizona Science Center, 600 E. Washington Street, Phoenix, AZ 85004
Exact meet up instructions: Participants are to meet at the main entrance to the facility., located on the north side of the building. Participants must be escorted by City of Phoenix staff at all times during site walk.
Parking: There is no parking available at the facility. Site walk participants must use public parking available at near by parking garage or metered parking along the adjacent public streets.
6. Statement of Qualifications Evaluation Criteria
A firm will be selected through a qualifications-based selection process based on the criteria below. Subcriteria are listed in order of importance in relation to project services. City of Phoenix project experience is not required.
Provide a general description of the firm that is proposing to provide construction management services and general construction services. Explain the legal organization of the proposed firm or team. Provide an organization chart showing key personnel.
Provide the following information:
List the Arizona contractor licenses held by the firm and the key personnel who will be assigned to this project. Provide the contractor license number. Reference the appropriate licenses held, if needed. In order to be considered for this project, the contractor must hold the correct license as deemed appropriate by the Arizona Registrar of Contractors prior to submitting a Statement of Qualifications (SOQ) for this project in accordance with Arizona Revised Statute §32-1151.
Identify the location of the firm’s principal office and the home office location of key staff on this project.
Identify any contract or subcontract held by the firm or officers of the firm, which has been terminated within the last five years. Identify any claims arising from a contract which resulted in litigation or arbitration within the last three years. Briefly describe the circumstances and the outcomes.
Scoring Method:
Points Based
Weight (Points):
150 (14.7% of Total)
2. Experience and Qualifications of the Firm
Identify at least three comparable projects in which the firm served as either CMAR, agency Construction Manager during design and construction phases (without providing construction services), or General Contractor. Special consideration will be given to firms that have provided Construction Manager at Risk services on similar successful projects. For each project identified, provide the following:
Description of the project
Role of the firm (specify whether Construction Manager at Risk, Construction Manager or General Contractor. If CMAR or General Contractor, identify the percent of work self-performed. Also specify services provided during design phase, i.e. cost estimating, scheduling, value engineering, etc.)
Project’s original contracted construction cost and final construction cost
Construction dates
Project owner
Scoring Method:
Points Based
Weight (Points):
250 (24.5% of Total)
3. Experience of Key Personnel to be Assigned to This Project
For each key person identified, list their length of time with the firm and at least two comparable projects in which they have played a primary role. If a project selected for a key person is the same as one selected for the firm, provide just the project name and the role of the key person. For other projects provide the following:
Description of project
Role of the person
Project’s original construction cost and final construction cost
Construction dates
Project owner
List any proposed consultants, including key staff names and the experience and qualifications of these individuals.
Scoring Method:
Points Based
Weight (Points):
250 (24.5% of Total)
4. Understanding of the Project and Approach to Performing the Required Services
Discuss the major issues your team has identified on this project and how you intend to address those issues.
Attached to this Request for Qualifications is the City of Phoenix general subcontractor selection plan (see Exhibit A). Describe how you intend to implement this subcontractor selection plan including your recommendations for subcontractor trades to be selected by qualifications only vs. qualifications and bids; and discuss the benefit that your subcontractor selection plan provides to the project.
Describe your team’s project management approach and team organization during design and construction phase services. Describe systems used for planning, scheduling, estimating, and managing construction. Briefly describe the firm’s experience on quality control, dispute resolution, and safety management.
Scoring Method:
Points Based
Weight (Points):
350 (34.3% of Total)
5. Reference Checks
Use the form provided in the Attachments section to obtain at least three references. It is preferred no more than one be a City of Phoenix project. If your firm has not completed prior projects with other agencies, you will not be penalized. It is recommended there be references outside the City of Phoenix.
*These points are in addition to the 1,000 points for the SOQ.
Scoring Method:
Points Based
Weight (Points):
21 (2.1% of Total)
7. Submittal Requirements
7.1. CM at Risk
Electronic Submittal Process: Firms interested in this project must submit a Statement of Qualifications (SOQ) electronically through the City's Procurement Portal at https://procurement.opengov.com/portal/phoenix.
Submittal requirements are as follows:
Vendor Information: All firms must be registered in the City’s Vendor Management System prior to submitting a proposal. The vendor number should be included on the cover of the SOQ. Information on how to register with the City is available at:
https://www.phoenix.gov/financesite/Pages/EProc-help.aspx
If your firm is already registered with the City of Phoenix’s Procurement system, visit https://procurement.opengov.com/portal/phoenix to login and access the electronic solicitation.
Submittals:
Experience Modification Rate (EMR) – provide current rating; the awarded company will be asked to provide verification upon contract execution.
Submit only one SOQ electronically, in .PDF format only, addressing all evaluation criteria. No hard copies will be accepted.
Clearly display the firm legal name, vendor number, project title, and project number on the cover of the SOQ.
A maximum of 12 pages is permitted to address all content in the SOQ submittal. (Maximum page limit includes evaluation criteria and all additional content. It does not include information sheet.)
Submit electronically the Statement of Qualifications by 12:00 pm, Phoenix time, on Friday, December 11, 2026.
Page size must meet requirements of 8½” x 11”.
Font size must not be less than 10 point.
Content count:
Each side of a page containing evaluation criteria and additional content will be counted toward the maximum page limit noted above.
Pages that have project photos, charts and/or graphs will be counted towards the maximum page limit noted above.
Front and back covers, information sheet, Table of Contents pages, and divider (tab) pages will NOT be counted toward the maximum page limit noted above, unless they include evaluation criteria and additional content that could be considered by the selection panel.
Information Sheet: Provide an information sheet that includes project title, OpenGov ID number, legal firm name (not a trade name), address, phone number, vendor number, and the name, title, email address and signature of your contact person for the project. Do not include any additional information.
Evaluation Criteria: Address the SOQ evaluation criteria.
Bonding Statement: As a separate PDF attachment, include a statement of the firm’s bonding capacity from a Surety Company (A- or better for the prior four quarters). This bond statement will not be counte
Attached documents:
• ARIZONA_SCIENCE_CENTER_STORMWATER_AND_SEWER_PIPE_REPLACEMENT_CONSTRUCTION_MANAGER_AT_RISK_SERVICES.pdf
• A - SUBCONTRACTOR SELECTION PLAN
• B - CONTRACTOR_REFERENCE_CHECK_PW26740069
• C - SBE CMAR Clause Launguage_PW26740069
• D - SBE Letter of Intent Form_PW26740069
• E - SBE CMAR Contractors Statement of Utilization
The CMAR will provide preconstruction services (cost estimating, design collaboration, constructability reviews, value engineering, phasing/scheduling, risk identification, permitting assistance) and construction services (subcontractor management, quality control, safety oversight, schedule management) for the replacement of all existing drain, waste, vent (DWV), and storm drainage systems serving the Arizona Science Center. Remedy methods may include HDPE pipe using trenchless methods such as pipe bursting or cured in place pipe (CIPP) lining. The CMAR will prepare at least two Guaranteed Maximum Price (GMP) proposals, bond and insure the construction, provide 24/7 emergency response coverage, and comply with City of Phoenix building standards. The project also includes an add alternate for ADA upgrades including adult changing stations.
We post new general contractors opportunities in Arizona as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Arizona work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: City of Phoenix (project PW26740069), retrieved via the City of Phoenix OpenGov procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.