- Qa
- Text
- Skip to main content
Procurement
Sign Up
Log In
A new public portal is coming soon
See this agency in the new public portal.
Try New Experience
404
Sorry, we could not find this page
- Due Text
- Thursday, December 10, 2026 3:00pm
- Posted At
- Fri, Nov 6, 2026 7:46 AM
- Documents
- Fire_Extinguisher_Inspection,_Maintenance,_Testing,_Repair_Services_and_Parts.pdf, A - CITY BUILDING LOCATIONS, B - CITY BUILDING QUADRANT, C - GENERAL INSURANCE REQUIREMENTS WITH PROFESSIONAL LIABILITY, D - MASTER LABOR AND MATERIALS CONTRACT (12-18-24), E - REQUIRED FORMS - AAs - SIG-LEGAL-STATUS - DECLARATION OF NONCOLUSION 08022024 v2, L - RELEVANT EXPERIENCE FORM
- Numeric Id
- 309516
- Description
- The City of Pasadena Department of Public Works, Building Systems and Fleet Management Division (BSFMD) is seeking a qualified vendor to provide comprehensive fire extinguisher inspection, maintenance, testing, certification, repair, recharging, hydrostatic testing, replacement, and related parts and support services for fire extinguishers located throughout City-owned facilities, fleet vehicles, and equipment.
Services shall be provided on an as-needed and scheduled basis and performed in accordance with the latest editions of National Fire Protection Association (NFPA) 10, Office of the State Fire Marshal (OSFM) requirements, Occupational Safety and Health Administration (OSHA), California Occupational Safety and Health Administration (Cal/OSHA), manufacturer recommendations, and all applicable federal, state, and local regulations.
The resulting contract will ensure fire extinguishers remain properly inspected, maintained, tested, and ready for emergency use while minimizing operational disruptions to City facilities and fleet operations.
Background
BSFMD is responsible for maintaining fire extinguishers installed throughout City-owned facilities, fleet vehicles, and equipment to support safe and reliable municipal operations. Fire extinguishers require periodic inspection, maintenance, testing, certification, repair, recharging, hydrostatic testing, replacement, and related services to ensure compliance with applicable fire and life safety regulations, manufacturer recommendations, and industry standards.
The City currently maintains approximately 1,050 portable fire extinguishers, including approximately 650 extinguishers located throughout City-owned facilities and approximately 400 extinguishers installed in fleet vehicles and equipment. Building fire extinguishers are serviced according to an annual inspection schedule organized by geographic quadrants to minimize disruptions to City operations, while fleet fire extinguishers are generally serviced at the City’s Fleet Maintenance Facility. The City reserves the right to modify service locations and schedules as operational needs require. The existing quadrant inspection program and annual service schedule are provided in the solicitation attachments.
These services are essential to maintain operational readiness, protect City personnel and assets, support workplace safety, and ensure fire extinguishers remain fully functional, code compliant, and readily available for emergency use.
Timeline
Release Project Date:
November 6, 2026
- Document Text
- 1. Notice Inviting Bids
For
Fire Extinguisher Inspection, Maintenance, Testing, Repair Services and Parts
Notice is hereby given that the City of Pasadena is calling for sealed bids for the Public Works Department, BSFMD and will receive sealed bids prior to 3:00 pm, Thursday, December 10, 2026 and will electronically unseal and make them available online (https://procurement.opengov.com/portal/pasadena/projects/309516) for this solicitation named "Fire Extinguisher Inspection, Maintenance, Testing, Repair Services and Parts" Project ID: 2026-IFB-LM-0555.
1.1. Summary
The City of Pasadena Department of Public Works, Building Systems and Fleet Management Division (BSFMD) is seeking a qualified vendor to provide comprehensive fire extinguisher inspection, maintenance, testing, certification, repair, recharging, hydrostatic testing, replacement, and related parts and support services for fire extinguishers located throughout City-owned facilities, fleet vehicles, and equipment.
Services shall be provided on an as-needed and scheduled basis and performed in accordance with the latest editions of National Fire Protection Association (NFPA) 10, Office of the State Fire Marshal (OSFM) requirements, Occupational Safety and Health Administration (OSHA), California Occupational Safety and Health Administration (Cal/OSHA), manufacturer recommendations, and all applicable federal, state, and local regulations.
The resulting contract will ensure fire extinguishers remain properly inspected, maintained, tested, and ready for emergency use while minimizing operational disruptions to City facilities and fleet operations.
1.2. Delivery Instructions
Bids will be received via the City's eProcurement Portal (https://procurement.opengov.com/portal/pasadena). A bid received after the time set for the bid opening shall not be considered. Bidders are required to submit (upload) all items listed in the Submittals/Checklist. Bids will be received prior to 3:00 pm on Thursday, December 10, 2026 and will be opened online at that time.
Copies of the Specifications and all required forms may be obtained for this solicitation online: https://procurement.opengov.com/portal/pasadena/projects/309516
Addenda shall be acknowledged via the City's eProcurement Portal. Refer to the Specifications for complete details and bidding requirements. The Specification and this Notice shall be considered a part of any contract made pursuant thereunder.
1.3. Pre-bid Conference
See the Timeline in the section named "Instructions to Bidders." If there is a Mandatory pre-bid meeting, bidders are required to attend at the time, date, and location included in the Timeline (#Instructions to Bidders) of this solicitation. If there is a Non-Mandatory pre-bid meeting, bidders not required to attend.
Each prospective bidder will have the opportunity to clarify and ask questions regarding these Specifications. The Pre-bid Meeting will be held at the time, date, and location in the Timeline of this solicitation.
1.4. Required Licenses (Eligibility Requirement)
Bidders must possess and provide the following license(s) or certification(s) to be deemed qualified to perform the work specified:
California Office of the State Fire Marshal Portable Fire Extinguisher Concern License - Type AND U.S. Department of Transportation Cylinder Requalification Approval and Retester Identification Number
1.5. Deadline for Questions
The deadline to submit questions related to this solicitation is Friday, November 20, 2026, prior to 2:00 pm.
Questions regarding this solicitation should be submitted directly through the City's eProcurement Portal Q&A function. Do not contact any other City employee or official regarding this solicitation. Any questions submitted after the date and time specified may not be considered.
1.6. Release Date
Release Dated: Friday, November 6, 2026
Matthew E. Hawkesworth
Interim City Manager
Post Information
Posted At:
Fri, Nov 6, 2026 7:46 AM
Sealed Bid Process:
Yes (Bids Sealed / Pricing Sealed)
Private Bid:
No
2. Instructions to Bidders
2.1. Summary
Submittal Instructions
Bids will be received via the City's eProcurement Portal. A bid received after the time set for the bid opening shall not be considered. Bidders are required to submit (upload) all items listed in the #Bidder's Submittals/Checklist. Addenda shall be acknowledged via the City's eProcurement Portal. Bids will be received prior to 3:00 pm on Thursday, December 10, 2026 and will be opened online at that time.
Copies of the Specifications and all required forms may be obtained for this solicitation online: https://procurement.opengov.com/portal/pasadena/projects/309516
Refer to the Specifications for complete details and bidding requirements. The Specification and this Notice shall be considered a part of any contract made pursuant thereunder.
All bid pricing must be entered into the City's eProcurement Portal or the bid may be considered informal and deemed non-responsive, do not use a separate document attachment to represent your pricing. All required attachments must be completed and uploaded electronically into City's eProcurement Portal prior to the set bid date and time in this Notice Inviting Bids.
The City of Pasadena Department of Public Works, Building Systems and Fleet Management Division (BSFMD) is seeking a qualified vendor to provide comprehensive fire extinguisher inspection, maintenance, testing, certification, repair, recharging, hydrostatic testing, replacement, and related parts and support services for fire extinguishers located throughout City-owned facilities, fleet vehicles, and equipment.
Services shall be provided on an as-needed and scheduled basis and performed in accordance with the latest editions of National Fire Protection Association (NFPA) 10, Office of the State Fire Marshal (OSFM) requirements, Occupational Safety and Health Administration (OSHA), California Occupational Safety and Health Administration (Cal/OSHA), manufacturer recommendations, and all applicable federal, state, and local regulations.
The resulting contract will ensure fire extinguishers remain properly inspected, maintained, tested, and ready for emergency use while minimizing operational disruptions to City facilities and fleet operations.
2.2. Background
BSFMD is responsible for maintaining fire extinguishers installed throughout City-owned facilities, fleet vehicles, and equipment to support safe and reliable municipal operations. Fire extinguishers require periodic inspection, maintenance, testing, certification, repair, recharging, hydrostatic testing, replacement, and related services to ensure compliance with applicable fire and life safety regulations, manufacturer recommendations, and industry standards.
The City currently maintains approximately 1,050 portable fire extinguishers, including approximately 650 extinguishers located throughout City-owned facilities and approximately 400 extinguishers installed in fleet vehicles and equipment. Building fire extinguishers are serviced according to an annual inspection schedule organized by geographic quadrants to minimize disruptions to City operations, while fleet fire extinguishers are generally serviced at the City’s Fleet Maintenance Facility. The City reserves the right to modify service locations and schedules as operational needs require. The existing quadrant inspection program and annual service schedule are provided in the solicitation attachments.
These services are essential to maintain operational readiness, protect City personnel and assets, support workplace safety, and ensure fire extinguishers remain fully functional, code compliant, and readily available for emergency use.
2.3. Contact Information
Elena Olimpio
Management Analyst
Email: eolimpio@cityofpasadena.net
Phone: (626) 744-4020
Department:
Public Works Department, BSFMD
2.4. Timeline
Vendors are strongly advised to complete and submit all required items sufficiently early before the date listed in this solicitation. Bids must be completed and submitted according to the instructions in this solicitation prior to 3:00 pm onThursday, December 10, 2026.
Release Project Date:
November 6, 2026
Question Submission Deadline:
November 20, 2026, 2:00pm
Bid Submission Deadline:
December 10, 2026, 3:00pm
3. City Requirements
There are forms included in the section named Submittal/Checklist of these specifications which a bidder or proposer must complete to establish compliance with a number of City Requirements, including, but not limited to, equal employment opportunity and affidavit of non-collusion. These forms and their instructions should be considered an integral part of the specifications and failure to complete them may be grounds, in the sole discretion of the city, for rejection of any bidder or proposer.
3.1. Pasadena Operating Companies
If this solicitation is issued by an Operating Company of the City of Pasadena including the Pasadena Center Operating Company; or Rose Bowl Operating Company; or Pasadena Community Access Corporation: In this solicitation, any reference to the City, shall actually refer to the PCOC, PRHB, or RBOC, or PCAC, e.g. "City" shall refer to the Operating Company, "City Council" to its Board of Directors, and "City Manager" to its Chief Executive Officer.
3.2. Equal Employment Opportunity in Contracting
Policy - The City of Pasadena is committed to a policy of Equal Employment:
Contracting. Contractors expressly agree to comply with the City’s ordinances and regulations regarding Equal Opportunity Employment as well as regulations that may be mandated by the source of the funds supporting this contract.
Compliance – To the extent permitted by law, Contractor expressly agrees to establish compliance with the Equal Employment Opportunity Practices Provisions of Chapter 4.08 of the Pasadena Municipal Code, and the Rules and Regulations adopted pursuant to said ordinance.
The successful bidder or proposer may be required to submit documentation during the term of the contract to evidence on going compliance with the City’s Equal Opportunity Practices Provisions. Such documentation may include, but not be limited to certified payroll records and Current Permanent Workforce Utilization reports.
Required Forms – Each bidder or proposer must submit a completed Form AA-1. Failure to submit this form will result in automatic disqualification with no exceptions unless bidder or proposer has an approved Form on file with the City.
Questions regarding Chapter 4.08 of the Pasadena Municipal Code and regulations adopted pursuant thereto should be directed to the Department of Finance, Purchasing Division 626.744.6755.
3.3. Declaration of Non-Collusion by Contractor
This form is only applied for formal solicitations $75,000 or more. The City requires that each bidder or proposer executes and submits to the City with the Bid/Proposal, the attached Declaration of Non Collusion in the section named "Submittals/Checklist."
3.4. SAMPLE CONTRACT
A sample of the contract the successful vendor will be required to enter into with the City is attached hereto and by this reference incorporated herein and made part of this solicitation.
3.5. CHANGE ORDER MANAGEMENT
Any additional work identified during the course of the project that is deemed necessary, but outside the original Scope of Services, must be recorded as a Change Order and approved by the City in writing before work is started.
3.6. Local Preferences
The City of Pasadena is committed to promoting the economic health and well being of its residents. To this end, contractor agrees to recruit Pasadena residents initially and to give them preference, if all other factors are equal, for any new positions that result from the performance of this contract and which are performed within the City.
3.7. Pasadena Business License
Awarded bidder or proposer may be required to obtain and pay for any required business license under Title 5 of the Pasadena Municipal Code.
If the business will not come into the City for the purpose of providing services for this contract they are not required to obtain a business license.
If the business will only be coming into the city no more than 10 times to work on projects, they are charged 33% of the annual tax (Pasadena Municipal Code Section 5.04.130C)
If they come into the City more than 10 times they are required to pay the annual fee.
Any subcontractors used by the awarded bidder or proposer will be required to obtain a license if they will be coming into the City to perform services.
For further information contact Municipal Services Department at (626) 744-4166, Monday-Friday between 7:15 am and 5:15 pm. Additional Information regarding business license fees can be found here: https://www.cityofpasadena.net/finance/licenses/business-licenses/
3.8. Invoice Submission Portal
Invoice Submission Portal
The invoice submission process is activated when an invoice is submitted through the Vendor Invoice Portal. Invoices submitted are automatically sent to the department being invoiced for review. Once the city department verifies its accuracy, the department will submit the invoice to Accounts Payable for payment processing. One final review and approval by the department who was invoiced is needed in order for a check to be issued. Checks are issued on Tuesday and Thursday.
How to submit invoices to the City of Pasadena?
Create an account: Visit the City’s Invoice Submission website: https://invoice.cityofpasadena.net/ and select “Create Account”
Refer to the "Invoice Submission Portal - Vendor User Guide" for detailed instructions.
3.9. Acceptance of Conditions
By submitting a bid or proposal, each bidder or proposer expressly agrees to and accepts the following conditions:
All parts of the Instructions to bidder or proposer and Specifications will become part of the Contract between the selected bidder or proposer and the City;
The City may require whatever evidence is deemed necessary relative to the bidder or proposer financial stability and ability to complete this project;
The City reserves the right to request further information from the bidder or proposer, either in writing or orally, to establish any stated qualifications;
The City reserves the right to solely judge the bidder or proposer representations, and to solely determine whether the bidder or proposer is qualified to undertake the project pursuant to the criteria set forth herein. The bidder or proposer, by submitting a bid, expressly acknowledges and agrees that the judgment of the City as to whether or not the bidder or proposer is qualified to perform the project, shall be final, binding and conclusive;
The City reserves the right to reject all bids, waive any irregularity in any of the bids, or cancel or delay the project at any time;
This bidding process does not commit the City to award any contract, and the City is not liable for any costs incurred by the bidder or proposer in the preparation and submission of a bid.
3.10. Pasadena Business
Local Business is defined in the Pasadena Municipal Code section:
4.08.020, O: "Local business" means a business with a fixed place of business located in the city.
To receive any preferences offered to a Pasadena business in this solicitation, a Pasadena business must be located within the City Boundary by the release date of this solicitation.
3.11. Pasadena Living Wage Ordinance
If this purchase includes a service, and the contract total is at $25,000 or more, it is then subject to the City of Pasadena's Living Wage Ordinance, Pasadena Municipal Code Chapter 4.11. The ordinance requires that contractors providing labor or services to the City under contracts in excess of $25,000 pay no less than the City’s Living Wage to all employees who spend any of their time providing labor or delivering services to the City.
The selected contractor will be required to evidence compliance with the Living Wage Ordinance by submitting payroll records as requested by the City. Each record shall include the full name of each employee performing labor or providing services under the contract; job classification; rate of pay and benefit rate.
Failure to comply with the provisions of the Pasadena Living Wage Ordinance is grounds for termination of the contract and a basis for penalties as stated in Pasadena Municipal Code Chapter 4.11. Questions concerning the Pasadena Living Wage Ordinance should be directed to:
Finance Department
Purchasing Division
626-744-6755 - phone
626-744-6757 – fax
Please visit https://ww5.cityofpasadena.net/finance/doing-business-with-the-city/ for the current calendar year Pasadena Living Wage rate.
3.12. PAYMENT OF A CITY-WIDE MINIMUM WAGE
If a vendor is providing labor for any subsequent contract resulting from this solicitation, they must comply with the City of Pasadena Minimum Wage as set forth in Chapter 5.02 of the Pasadena Municipal Code. Vendors are encouraged to review the City’s minimum wage information guide at (https://bit.ly/3o3SHMh). The minimum wage ordinance may be found at Pasadena Municipal Code.
3.13. Errors and Omissions
Bidders or Proposers shall not be allowed to take advantage of any errors or omissions in the Instructions to Bidders/General Instructions or Specifications/Scope of Work. Full instructions will be given if such error or omission is discovered and timely called to the attention of the City.
3.14. Patent Fees; Patent, Copyright, Trade Secret, and Trademark Fees
Each bidder or proposer shall include in the price bid any patent fees, royalties and charges on any patented article or process to be furnished or used in the prosecution of the Work.
3.15. Taxes
Price bid or Price Proposals shall include all federal, state, local and other taxes.
3.16. Certificate of Insurance
Proof of insurance is not required to be submitted with your bid/proposal, but will be required prior to the City's award of the contract. Refer to the Insurance requirements in the "Insurance Requirements" section of this document.
3.17. REQUEST FOR TAXPAYER IDENTIFICATION NUMBER AND CERTIFICATION (IRS Form W-9)
The winning proposal/bid may be required to submit a completed and signed IRS Form W-9. Failure to submit this form may result in the response being deemed non-responsive.
Link: https://www.irs.gov/pub/irs-pdf/fw9.pdf
3.18. LIMITATIONS ON LIABILITY
Bidders acknowledge that they shall provide the goods and/or services without monetary limitations on liability. If Bidders take exception to this requirement, Bidders shall expressly state any exceptions, including the proposed limits of liability, (a) in detail; (b) as a separate line item; and (c) not part of any form documents submitted. Bidders acknowledge that any exceptions may result in a finding of non-responsiveness.
3.19. Recycled Product Procurement Mandates Pertaining to Local Governments [Public Contract Code Sections 22150 - 22154]
This section is only applied when buying paper products.
Beginning January 1, 2022, SB 1383 requires jurisdictions (cities, counties, cities and counties, or special districts that provide solid waste collection services) to purchase recycled-content paper products that are recyclable.
SB 1383 builds upon existing laws that require jurisdictions to purchase products that contain minimum recycled content, and adds additional requirements on product recyclability and recordkeeping.
All vendors providing Paper Products and Printing and Writing Paper shall:
Provide products that contain no less than 30% minimum recycled content and recyclability (described in further detail in State of California, Public Contract Code Sections 22150-22154, under the sections “Recycled-Content Requirements” and “Recyclability Requirements”.
Provide a written certification and other verification from product vendors, as applicable, certifying that the products meet the recycled-content and recyclability requirements.
3.20. AVAILABILITY OF FUNDS
The provisions of this Contract relating to payment for products or services shall become effective when funds assigned for the purpose of compensating the Contractor as herein provided are actually available to for disbursement. The City shall be the sole judge and authority in determining the availability of funds under this Contract. If any action is taken by the City, any state agency, Federal department or any other agency to suspend, decrease, or terminate its fiscal obligations under, or in connection with, this Contract, the City may amend, suspend, decrease, or terminate its obligations under, or in connection with, this Contract. In the event of termination, The City shall be liable for payment only for products provided or services rendered prior to the effective date of the termination, provided that such products or services were provided or performed in accordance with the provisions of this Contract.
3.21. Addenda
If any person contemplating submitting a proposal of the items or services listed herein is in doubt as to the true meaning of any part of this RFP, he/she may submit a question through the City's eProcurement Portal Q&A section for an interpretation or correction thereof.
Any interpretation or correction of City specifications will be made only by addendum, duly issued by the City representative(s) identified in this solicitation, above. Addenda (if any) shall be made available on the City's eProcurement system, and sent to each vendor included on the "Followers" list in the City's eProcurement system. A vendor's failure to address the requirements of any and all addenda may result in the response (proposal or bid, or alike) not being considered. If the City determines that a time extension is required for the proposal, the City will issue an addendum that will give the new submission date. The vendor is responsible to register on the City's eProcurement Portal and follow the project named Fire Extinguisher Inspection, Maintenance, Testing, Repair Services and Parts in order to be included in the "Followers" list in the City's eProcurement system to insure they receive all documents including addendums which are available as a download.
The City reserves the right to change any part of these Instructions to PROPOSERS and Specifications any time prior to Deadline for Submissions. Any changes shall be in the form of addenda and will become a part of the Proposal documents and of the contract.
3.22. Accessibility Compliance Requirements
General Compliance
In accordance with Title II of the Americans with Disabilities Act of 1990 (ADA), Section 504 of the Rehabilitation Act of 1973, and all other applicable federal, state, and local disability rights laws, including the California Building Code (CBC) and California Code of Regulations Title 24, the City of Pasadena requires that all services, programs, activities, and facilities provided or utilized under this contract be fully accessible to individuals with disabilities.
The selected Contractor agrees to ensure that all work performed, and all services, programs, or activities provided under this contract comply with the requirements of Title II of the ADA and related laws. This includes, but is not limited to design, construction, communication, technology, and program delivery compliance with:
The ADA and its implementing regulations (28 CFR Part 35 and Part 36);
The 2010 ADA Standards for Accessible Design;
The U.S. Access Board’s Public Rights-of-Way Accessibility Guidelines (PROWAG), as amended;
Section 504 of the Rehabilitation Act of 1973;
California Government Code § 4450 et seq.;
California Code of Regulations (CCR), Title 24, including Chapter 11B of the California Building; Code governing accessibility to public accommodations and commercial facilities;
Any other relevant federal, state, or local regulations concerning accessibility and nondiscrimination.
These requirements apply to all aspects of the Contractor’s work, including but not limited to project or program design, facility access, pedestrian pathways, public right-of-way improvements, communications, and digital content or services.
Applicability of Accessibility Requirements
Accessibility compliance requirements apply when scope of work includes:
Digital deliverables (i.e. websites, web applications, mobile applications, electronic documents, multimedia content)
Physical infrastructure (i.e public facilities, pedestrian pathways, rights-of-way, shared use paths)
Communication and program delivery (i.e. public meetings, outreach materials, surveys, customer service and payment platforms)
Technology procurement or development (software, hardware, ICT systems)
If any portion of the work involves these elements, the Contractor must ensure full compliance with applicable accessibility standards.
Digital and Electronic Content
For all digital deliverables (including websites, documents, and applications), the Contractor shall ensure conformance with, at minimum:
Web Content Accessibility Guidelines (WCAG) 2.1, Level AA, as amended[GS1] ; and
Section 508 of the Rehabilitation Ace (29 U.S.C. § 794d), where applicable.
All digital materials must undergo both automated and manual accessibility testing, including usability reviews by individuals representing a wide range of functional disability types (e.g., visual, auditory, cognitive, motor), and, if required, remediated prior to final acceptance. Testing must include compatibility with commonly used assistive technologies (e.g., JAWS, NVDA, VoiceOver, ZoomText, Dragon NaturallySpeaking). The Contractor must provide documentation such as Voluntary Product Accessibility Template (VPAT) or equivalent Accessibility Conformance Report (ACR), detailing compliance and describing the testing methodology.
Public Rights-of-Way Accessibility (PROWAG)
Any design, construction, or alteration involving pedestrian facilities, sidewalks, curb ramps, crosswalks, or public rights-of-way must conform to the latest applicable version of the U.S. Access Board’s Public Rights-of-Way Accessibility Guidelines (PROWAG), as adopted by the U.S. Department of Justice, Department of Transportation, or other relevant authority.
Corrective Action and Liability
The Contractor shall be held responsible for correcting any noncompliant work or deliverables identified by the City of Pasadena or any enforcement agency, at no additional cost. The City of Pasadena reserves the right to withhold payment, suspend work, or terminate the contract for failure to meet accessibility requirements.
The Contractor shall indemnify and hold harmless the City of Pasadena, its officers, agents, and employees from any claims, damages, or liabilities arising from noncompliance with applicable accessibility laws or guidelines.
Certification of Compliance
By submitting a proposal, the Contractor certifies that it has reviewed and will comply fully with all applicable federal, state, and local accessibility laws, including the ADA, CBC, Title 24, and PROWAG, and will ensure that all subcontractors do the same.
3.23. Disclosure of Contracts with the U.S. Department of Homeland Security (DHS)
Purpose
The information request will have no bearing on the evaluation of your response during the Evaluation stage. The information will be used by the City for administrative review and to support a one-year evaluation period of contracting and data-sharing practices. The City is requesting information to be included with your submittal. The form is to be uploaded in the Submittal/Checklist section. Submission of this form is encouraged to assist the City in understanding vendor relationships and informing future policy considerations. The City intends to maintain an open and collaborative dialogue with contractors and the community regarding data practices and transparency.
Disclosures:
Respondents are invited to disclose any current contracts, subcontracts, or agreements with DHS, including any related data-sharing arrangements. If provided, respondents may include:
DHS agency or sub-agency (if applicable)
General description of services
Whether data-sharing with third parties is involved
If no such relationships exist, respondents may indicate “No.”
Questions related to the disclosure shall be asked and answered through the solicitation Question and Answer process. The completed disclosure form will be reviewed by and shared with the City Manager’s office. Please upload this form as part of the submittal checklist and email a copy to CMOContractsAssessement@cityofpasadena.net.
4. General Instructions
4.1. Pre Submittal Meeting
See the "Timeline" in the Introduction section (#Instructions to Bidders). If there is a Mandatory pre-proposal meeting, bidders/proposers are required to attend at the time, date, and location included in the Timeline. If there is a Non-Mandatory pre-proposal meeting, bidders/proposers are not required to attend.
Each bidder/proposer will have the opportunity to clarify and ask questions regarding the Specifications. The Pre-Proposal Meeting will be held at the time, date, and location in the Timeline of this solicitation.
4.2. Vendor Must Make Thorough Investigation
It is the bidders/proposers responsibility to examine the location of the proposed work, to fully acquaint themselves with the Specifications or Scope and the nature of the work to be done. The vendor shall have no claim against the City based upon ignorance of the nature and requirements of the project, misapprehension of site conditions, or misunderstanding of the specifications or contract provisions.
4.3. Acceptance of Conditions
By submitting a response, each vendor expressly agrees to and accepts the following conditions:
All parts of the Instructions to bidders/proposers and the Specifications or Scope will become part of the Contract between the selected vendor and the City;
The City may require whatever evidence is deemed necessary relative to the bidders/proposers financial stability and ability to complete this project;
The City reserves the right to request further information from the bidders/proposers, either in writing or orally, to establish any stated qualifications;
The City reserves the right to solely judge the bidder's/proposer's representations, and to solely determine whether the bidder is qualified to undertake the project pursuant to the criteria set forth herein. The bidder/proposer, by submitting a bid, expressly acknowledges and agrees that the judgment of the City as to whether or not the bidder/proposer is qualified to perform the project, shall be final, binding and conclusive;
The City reserves the right to reject all bids, waive any irregularity in any of the bids, or cancel or delay the project at any time;
This bidding process does not commit the City to award any contract, and the City is not liable for any costs incurred by the bidder/proposer in the preparation and submission of a bid.
4.4. Bid Shall Remain Open
Bidder agrees that their bid shall remain open and shall not be withdrawn for a period of not less than one hundred and eighty (180) calendar days from the date of opening bids, or until rejected by the City, whichever occurs first.
4.5. Truth and Accuracy of Representation
False, incomplete or unresponsive statements in connection with the bid may be sufficient cause for rejection of a bidder/proposer.
4.6. City Changes to the Solicitation Documents
The City reserves the right to change any part of these Instructions to Vendors and Specifications any time prior to the submittal deadline. Any changes shall be in the form of addenda and will become a part of the solicitation documents and of the contract. Addenda shall be made available to each vendor. A bidder's/proposer's failure to address the requirements of the addenda may result in the bid not being considered. If the City determines that a time extension is required for the solicitation, the addenda will give the new submission date.
Addenda shall be acknowledged via the City's eProcurement Portal.
4.7. Notice Regarding Disclosure of Contents of Document
All responses accepted by the City at the time of bid opening shall become the exclusive property of the City. Upon opening, all bids accepted by the City shall become a matter of public record and shall be regarded as public, with the exception of those elements of each bid which are identified by the bidder as business or trade secrets and plainly marked as "trade secret," "confidential," or "proprietary." Each element of a bid which a bidder desires not to be considered a public record must be clearly marked as set forth above, and any blanket statement (i.e., regarding entire pages, documents, or other non-specific designations) shall not be sufficient and shall not bind the City in any way whatsoever. If disclosure is required under the California Public Records Act or otherwise by law (despite the bidder's request for confidentiality), the City shall not in any way be liable or responsible for the disclosure of any such records or part thereof.
4.8. Errors and Omissions
Bidders shall not be allowed to take advantage of any errors or omissions in the Instructions to Bidders or Specifications. Full instructions will be given if such error or omission is discovered and timely called to the attention of the City.
4.9. Patent Feed; Patent, Copyright, Trade Secret, and Trademark Fees
Each bidder shall include in the price bid any patent fees, royalties and charges on any patented article or process to be furnished or used in the prosecution of the Work.
4.10. Taxes
Price bid shall include all federal, state, local and other taxes.
4.11. Local Bidders; Refund of Sales and Use Tax
For the purpose of determining the lowest bidder on a contract for materials and supplies only, 2.25% of that portion of the bid subject to sales or use tax shall be deducted from any bid where it is determined that if such bidder were awarded the contract, the City would receive a refund of the 2.25% sales and use tax pursuant to the Uniform Sales and Use Tax Ordinance of the City of Pasadena.
4.12. Special Requirements of Contractors
There is a separate packet of forms as part of these specifications that a bidder must complete to establish compliance with a number of special City of Pasadena requirements, including, but not limited to, Equal Employment and Affidavit of Non Collusion. These forms and their instructions should be considered an integral part of the specifications and failure to complete them shall be grounds, in the sole discretion of the City, for rejection of any bidder.
4.13. Public Contract Code Sec. 9204 New Public Works Claims Procedure
As detailed in the Section Titled #Public Works Claims Procedure new Public Contract Code Section 9204, effective January 1, 2017, specifies new procedural requirements for claims submitted by a contractor on any public works project.
4.14. Protest Procedure
This procedure specifies the process to be utilized by the City of Pasadena in resolving protests regarding this solicitation. In order for a protest to be considered by the City of Pasadena, it must be submitted in accordance with the procedures outlined in the FORMAL SOLICITATION PROTEST PROCEDURE found at the following link: (https://ww5.cityofpasadena.net/finance/doing-business-with-the-city/). A protest submitted that is not in accordance with this procedure, may be returned to the submitting party without any further action by the City of Pasadena.
5. General Specifications
5.1. BID PROPOSAL QUANTITIES
The quantities contained in the bid documents are approximate only and are for the sole purpose of comparing bids. The City may, in accordance with the specifications, order more or less equipment and/or materials as necessary at the City’s sole discretion. Payment will be made only for the amount of material actually provided, as determined by the City and accepted at the unit prices noted in the bid.
5.2. EVALUATION OF BID
Bids will be evaluated based on the lowest Grand Total Price submitted in the Bidders' Proposal. The contract award will be made from among responsive and responsible bidders. In case of a discrepancy between the unit prices and item total, the unit price shall govern. In the event of a discrepancy between the item totals and the grand total price the item totals shall prevail. The prices will be subject to adjustment by the City on that basis in the event of discrepancy and bid awarded.
5.3. Award of Bid and Determination of Responsiveness
The contract shall be awarded to the lowest responsive and responsible bidder. In determining whether a bidder is responsible and responsive, the following shall be considered:
The quality of the material offered;
The ability, capacity and skill of the bidder to perform the contract or provide the material or services;
Whether the bidder can perform the contract or provide the service promptly, or within the time specified, without delay or interference;
The sufficiency of the bidder's financial resources and the effect thereof on his ability to perform the contract or provide the material or services;
The character, integrity, reputation, judgment, experience and efficiency of the bidder;
The quality and timeliness of the bidder's performance on previous orders or contracts for the City;
Litigation by the bidder on previous orders or contracts with the City;
The ability of the bidder to provide future maintenance and service where such maintenance and service is essential;
5.4. PRICE ADJUSTMENTS
At the conclusion of the first contract year and prior to the commencement of the second contract year or any subsequent contract extension period, the contractor may request unit price increases. Under no circumstances shall the City accept price increases, which exceed the rate of the then current Consumer Price Index (C.P.I.) "All items in Los Angeles-Long Beach-Anaheim, CA, all urban consumers, not seasonally adjusted" for the latest available preceding 12 month period. The percentage increase shall be a 12 month percentage increase for the first month of the subsequent contract year(s).
5.5. SAMPLE CONTRACT
A sample of the contract the successful bidder will be required to enter into with the City is attached hereto and by this reference incorporated herein and made part of these specifications.
5.6. Substitutions and Equivalents
SUBSTITUTION FOR PATENTED AND SPECIFIED ARTICLES
Wherever these Specifications specify any material or process by patent or proprietary name, or by name of manufacturer, such specification is only for the purpose of describing the material or process desired and shall be deemed to be followed by the words and/or approved equivalent. Any bidder may offer in the proposal any material or process that is equivalent in every respect to the material or process specified. This statement of alternate unit shall clearly describe the material or process for which the substitution is proposed and shall provide technical data establishing equivalency.
Equivalents to Specifications
The material, equipment or service offered by the bidder will meet all requirements of the specifications in this Notice Inviting Bids. Questions requesting approval of equals must be submitted before the deadline for questions to the City contacts listed in the Bid Invitation. Bidder must provide all information (no pricing) with their bid in order for the City to determine if the product offered is an equal to the manufacturer specified and/or meets the technical specifications. This includes details for each item to which a proposed equal will be taken, proposed make and model specifications, and any other information on the material specified herein regarding approved equals requested. Bidder must state brand name and/or manufacturer of each item proposed and include detailed specifications. All guarantees and/or warranties must also be stated. Parts and materials must be latest model or current date and meet specifications or be equal to the specifications.
During the question and answer period, the City reserves the right to determine whether equivalents meet the bid specifications of the City, and are equal to the manufacturer specified or the stated technical specifications. The decision of the City regarding equality shall be final.
Equals can be submitted for approval during the Question and Answer period through this eProcurement Portal: https://procurement.opengov.com/portal/pasadena/projects/309516.
5.7. BID YOUR FULL EQUAL OR BETTER
Materials and equipment furnished shall be new, complete, ready-for-use and of the latest model, shall not have been used in demonstration or other services and have all the usual equipment as shown by manufacturer’s current specifications and catalogs unless otherwise specified.
5.8. WARRANTY
Contractor shall provide factory warranties on all materials furnished against defects in materials and/or workmanship. The factory warranty shall become effective on the date of delivery and acceptance by the City. Should any defect in materials or workmanship appear during the warranty period, the Contractor shall repair or replace the same at no cost to the City.
5.9. DEFECTIVE MATERIALS:
Any materials not conforming to requirements of this Specification shall be considered defective. All such materials, whether in place or not, shall be immediately removed from the site of the work. Any defective materials installed shall be removed and replaced by the City and all costs of removal and replacement shall be deducted from any amounts due or to become due to the Contractor. No rejected materials, the defects of which have been subsequently corrected, shall be used.
5.10. RECEIVING AND INSPECTION:
Deficient parts will be rejected and the Contractor will be required to make the necessary adjustments or replacements. It shall be the Contractor’s responsibility to pick up any rejected parts, make the necessary corrections, and deliver materials at no additional cost to the City.
5.11. Protest Procedure
This procedure specifies the process to be utilized by the City of Pasadena in resolving protests regarding this solicitation. In order for a protest to be considered by the City of Pasadena, it must be submitted in accordance with the procedures outlined in the FORMAL SOLICITATION PROTEST PROCEDURE found at the following link: (https://ww5.cityofpasadena.net/finance/doing-business-with-the-city/). A protest submitted that is not in accordance with this procedure, may be returned to the submitting party without any further action by the City of Pasadena.
5.12. 4.08.130 Lowest and best bidder
4.08.130 Lowest and best bidder.
In determining the lowest and best bidder, the following shall be considered, in addition to price:
A. The quality of the material offered;
B. The ability, capacity and skill of the bidder to perform the contract or provide the material or services;
C. Whether the bidder can perform the contract or provide the service promptly, or within the time specified, without delay or interference;
D. The sufficiency of the bidder's financial resources and the effect thereof on his ability to perform the contract or provide the material or services;
E. The character, integrity, reputation, judgment, experience and efficiency of the bidder;
F. The quality and timeliness of the bidder's performance on previous orders or contracts for the city;
G. Litigation by the bidder on previous orders or contracts with the city;
H. The ability of the bidder to provide future maintenance and service where such maintenance and service is essential;
I. Certification by bidder of compliance with the Equal Employment Opportunity—Non-discrimination requirements.
J. Certification by bidder of compliance with the Pasadena living wage ordinance, where applicable.
(Ord. 6899, § 2, 2002; Ord. 6763, § 2, 1998; Ord. 5068, § 3.08, 1972)
5.13. Payment of Subcontractors, Suppliers, and Workers
The Prime Contractor shall be solely responsible for the payment of all subcontractors, suppliers, laborers, and any other persons or entities employed in connection with the performance of this Contract.
The City shall have no obligation to pay, or to ensure the payment of, any subcontractors, suppliers, or workers directly. The Prime Contractor shall ensure timely and full payment in accordance with all applicable laws, including but not limited to California Public Contract Code §§ 10262 and 10262.5 and Labor Code § 218.7.
Failure to comply with this requirement may result in the withholding of payments, imposition of penalties, and/or other remedies available under the Contract and applicable law.
The Prime Contractor shall also include in all subcontracts a provision requiring subcontractors to pay their lower-tier subcontractors and suppliers in a timely manner consistent with this section.
5.14. System for Award Management (SAM.Gov)
Prior to contract award, the lowest responsive and responsible bidder must provide an active registration with "Sam.Gov." Vendors seeking to register can register for free at the following link: https://sam.gov/content/entity-registration
5.15. Performance Bonds
The Bidder to whom a contract is awarded shall file the bonds specified by Section 2-4, "Contract Bonds," of the Standard Specifications before execution of the contract. The term "Contract Price" shall be deemed to mean the total contract "not to exceed" amount consisting of the base bid stated in the Bidder's Proposal plus such additional amounts provided for adjustments to the estimated quantities contained in the Bidder's Proposal and for extra work covered by approved change orders, if any. See Section P-2-4 of the Pasadena Supplements.
Performance Bonds Required: No Bond Required
5.16. Labor & Materials Bonds
The Bidder to whom a contract is awarded shall file the bonds specified by Section 2-4, "Contract Bonds," of the Standard Specifications before execution of the contract. The term "Contract Price" shall be deemed to mean the total contract "not to exceed" amount consisting of the base bid stated in the Bidder's Proposal plus such additional amounts provided for adjustments to the estimated quantities contained in the Bidder's Proposal and for extra work covered by approved change orders, if any. See Section P-2-4 of the Pasadena Supplements.
Labor & Materials Bonds Required: No Bond Required
5.17. INSURANCE
Proof of insurance is not required to be submitted with your bid, but will be required prior to the City's award of the contract. A copy of the City standard is included in the attachments.
5.18. DURATION OF CONTRACT
The initial term of the contract resulting from these Specifications shall be for five years from the date of execution by the City. The contract may be extended for one optional one-year extension period subject to the approval of the City Manager.
5.19. RELEVANT EXPERIENCE
Provide experience with governmental agencies for projects/contracts of similar scope and size. Complete and submit the attached Relevant Experience Form with your bid to demonstrate experience with projects of similar scope and size to that which is to be performed.
5.20. ACCEPTANCE OF WORK
The Contractor shall provide written notification to the City when the Contractor deems the work complete and ready for final inspection. Upon the receipt of this notice, the City will make a final inspection and notify the Contractor within five (5) working days that the work is approved or that additional work is needed before approval. The work will neither be final nor accepted until the City notifies the contractor in writing that the entire work is completed to the specifications. No deviations from the Specifications will be accepted unless previously approved in writing by the City. Within ten (10) days after the work is accepted, the City will record a Notice of Completion. The Contractor shall be responsible for risk of loss or damage to the work until the date of the written notice of acceptance from the City. The period of any guarantee or warranty provided under these Specifications, shall commence on the date the work is accepted.
5.21. STORAGE
The Contractor shall, at its own expense provide a storage location for his materials and equipment. The contractor must request and coordinate with Public Works Department for an approved location.
5.22. PROTECTION OF EXISTING IMPROVEMENTS AND OTHER UTILITIES
The Contractor shall, at its own expense, preserve and protect from injury all improvements existing at the site, such as equipment, trees, parkways, flowers, shrubbery, lawns, fences, curbs, gutters, sidewalks, walls, manholes and all other improvements of whatever nature. If any such improvements are injured, damaged, or destroyed by the Contractor, or its employees, subcontractors or agents, they shall promptly be restored by the Contractor, at the Contractor’s expense, to the condition existing before such injury, damage, or destruction. The Contractor shall protect and maintain in uninterrupted service any existing sub-surface utilities and shall promptly repair any damages to such utilities at his own expense. Existing utilities of record in the area affected by this contract may be shown in the drawings, however, if any pipe or conduit is encountered, the contractor shall determine their usage and arrange with the proper utility concerned for its removal or protection. The Contractor shall be held responsible for all damage to work installed by him or others that is caused by his work or by anyone employed by him. The Contractor shall utilize “UNDERGROUND SERVICE ALERT’ (USA) of Southern California (1-800-422-4133) to obtain marking of underground pipeline and utility locations. The contractor shall notify “USA” at least two working days in advance of beginning any excavation and/ or jacking operations. Utilities that are not subscribers or members of “USA” shall be notified separately and independently. To avoid unnecessary marking of utilities in the street and sidewalk areas, the Contractor shall specifically indicate those areas where underground utility information is needed using a temporary water based marking chalk (“AERVOE” brand or approved equal) with a visible life not to exceed three (3) weeks. Such markings shall be limited to only those areas where the Contractor’s operation could damage buried utilities. Unnecessary markings resulting from Contractor’s failure to identify only critical locations shall be removed by the Contractor at his expense. If the Contractor fails to properly and completely remove all unnecessary markings, the City will remove and bill the Contractor for all direct and indirect removal costs.
5.23. PROTECTION OF WORK, MATERIALS AND EQUIPMENT
The Contractor shall bear all risk of loss or damage to the work until its final completion and acceptance by the City. In this connection, the Contractor shall be responsible for proper storage and handling of all materials, including those materials furnished by the City, and for the care of all work until such final completion and acceptance. The Contractor shall, at its own expense, promptly replace material damaged or lost during this period, and shall repair any portion of the work damaged during this period. If the Contractor neglects or refuses to do so, the City may do so at the Contractor’s expense. However, the Contractor shall not be responsible for damage exceeding five percent of the Contract amount from Acts of God as defined in California Government Code Section 4151, such as earthquakes in excess of magnitude 3.5 on the Richter Scale, provided such damaged work was done according to the Specifications. Contractor shall not sell, assign, mortgage, hypothecate or remove equipment or materials which have been installed or delivered, and which may be necessary for the completion of the work, without written consent of the General Manager.
5.24. WARRANTIES GUARANTEES
The Contractor shall transfer to the City the manufacturer's warranty or guarantee for each item delivered or installed under the Contract. Where applicable, the City shall be named as owner-beneficiary in any such warranty or guarantee. The Contractor shall ensure that each warranty or guarantee is in full force and effect from the date the City commences operation and use of the item. All such manufacturer's warranties or guarantees shall be in addition to the Contractor's warranty under this Contract. In addition to the above and any special guarantees required by the Detailed Specifications, the Contractor shall warrant that its work is fit for the City's particular purpose as indicated in the Specifications, fulfills all requirements of these Specifications, and is free from defects in materials, equipment, workmanship or installation. For a period of one two (2) years following the City's acceptance of the Work as provided in herein in this Specification, the Contractor shall repair or replace at its own expense any portion of the Work, including any material or equipment incorporated into the Work, that is defective or otherwise fails to conform to the above warranty or special guarantees. The City will notify Contractor of any such defect or nonconformity. Such notice will be given in writing, if possible, or by the means most practical under the circumstances. If the Contractor fails to correct the defect or other non-conformity within ten (10) days after receiving such notice, or in case of emergency demanding immediate action, then the City may make the necessary replacements or repairs and charge the Contractor the total cost of all labor, materials, equipment, administration and overhead required. If final payment has not been made, the City may withhold an amount for these costs; if the amount withheld is not sufficient, the City may recover any balance from the Contractor. The Contractor's performance bond shall remain in effect for a period of two (2) years after the date of acceptance of the work to cover the Contractor's warranties and guarantees as set forth above. The warranty period for each work order begins on the day when the retention is approved to be released.
5.25. SAFETY MEASURES
The Contractor shall provide adequate safety measures and devices to prevent accidents, injury, or loss of life to the public and to workers, inspectors, and any persons whose duties bring them on the work. The Contractor shall comply with all orders and requirements of the California Division of Industrial Safety. The Contractor shall immediately install or provide any safeguarding or safety measures which the Division or the General Manager shall require. Without limiting the foregoing, in accordance with generally accepted construction practices the Contractor will be solely and completely responsible for conditions of the job site, including safety of all persons and property during performance of the work. This requirement will apply continuously and not be limited to normal working hours. Construction review of the Contractor’s performance by the City, its agents or employees, does not include review of the adequacy of Contractor’s safety measures at or near the construction site. Such construction review shall not relieve the Contractor of its obligations under this paragraph. The Contractor must comply with safety requirements issued by CAL/OSHA confined spaces, Article 108, #5157, #5158, #5159 and Pasadena Water and Power Department Safety Handbook Section I & II of Underground Distribution, when entering underground manholes. These requirements include, but not limited to: entry permits, air monitoring and ventilation, safety and rescue provisions. The Contractor and all his personnel must wear approved hard hats, clothing and equipment required on the jobsite. The Contractor shall employ workers who are qualified, experienced and well trained to work safely around or near energized electrical equipment. It is also a requirement of this contract that the contractor must provide his own electrical personnel who is qualified to monitor and supervise his workers while working inside the energized vault. Sanitation The Contractor shall provide all appropriate sanitary conveniences and shall remove the conveniences at the completion of the work.
5.26. CLEANUP
The Contractor shall keep the site free from accumulation of waste materials, rubbish and debris at all times. Upon completion of the work, the Contractor shall remove from the site all tools, equipment, temporary structures, unused materials, concrete forms, scaffolding, rubbish and other materials belonging to the Contractor or used under its direction during construction, and shall leave the site broom clean, unless the General Manager specifies otherwise. In the event the Contractor fails to clean up as required by these Specifications, the City may perform such cleanup work at the Contractor’s expense; the Contractor and its sureties shall be liable for such expense.
5.27. CONTRACTORS QUALITY CONTROL
The Contractor shall be responsible for providing quality control measures to assure that all work is done in accordance with the Contract documents and any product manufacturer’s recommendations.
If, in the opinion of a City Inspector or Representative, the Contractor is not providing quality control, further repair work may be suspended in part or in whole. Repair work shall only be allowed to commence once the Contractor has demonstrated satisfactory improvement in quality control procedures and repair results.
5.28. Funding Source
This procurement is funded by: City of Pasadena. Vendors must submit all required document with their proposal.
6. Insurance Requirements
6.1. Insurance Requirements
SEE ATTACHED INSURANCE REQUIREMENTS
7. Bid Specifications
7.1. Purpose
The purpose of this solicitation is to establish a contract with a qualified Contractor to provide as-needed fire extinguisher inspection, maintenance, testing, certification, repair, recharging, hydrostatic testing, replacement, and related support services. The contract will ensure the City has access to qualified services necessary to maintain fire extinguishers in accordance with applicable codes, regulations, and industry standards throughout the contract term.
7.2. Scope of Work
The Contractor shall provide comprehensive, as-needed fire extinguisher inspection, maintenance, testing, certification, repair, recharging, hydrostatic testing, replacement, and related support services for portable fire extinguishers located throughout City-owned facilities, fleet vehicles, and equipment.
The Contractor shall furnish all labor, supervision, transportation, vehicles, tools, testing equipment, replacement parts, extinguishing agents, materials, permits, certifications, documentation, disposal services, and incidental items necessary to perform the required services in accordance with the requirements of this solicitation.
Services to be provided under this contract include, but are not limited to:
7.2.1. Annual fire extinguisher inspections
7.2.2. Routine maintenance and servicing
7.2.3. Six-year internal maintenance, where applicable
7.2.4. Hydrostatic testing, where required
7.2.5. Fire extinguisher recharging
7.2.6. Inspection, diagnosis, and repair of defective fire extinguishers
7.2.7. Replacement of approved repair components
7.2.8. Replacement of condemned or non-repairable fire extinguishers upon City authorization
7.2.9. Furnishing replacement fire extinguishers, mounting brackets, cabinets, vehicle mounting hardware, and related accessories, when requested by the City
7.2.10. Electronic inspection reports and service documentation
7.2.11. Routine, urgent, and emergency service requests
7.2.12. Proper disposal of condemned fire extinguishers in accordance with applicable laws and regulations
The City currently maintains portable fire extinguishers at various municipal facilities, fleet vehicles, and equipment. The quantities, service locations, and inspection schedules identified in this solicitation are estimates only and may increase, decrease, or change throughout the contract term. The City reserves the right to modify service locations, inspection schedules, and quantities as operational needs require.
7.3. Annual Inspection and Maintenance Requirements
The Contractor shall perform annual inspections and routine maintenance of all portable fire extinguishers in accordance with the latest editions of NFPA (National Fire Protection Association) 10, manufacturer recommendations, and all applicable federal, state, and local regulations. All inspections shall be performed by properly licensed and qualified technicians.
At a minimum, the annual inspection and maintenance shall include:
General Requirements
The Contractor shall perform annual inspections of all portable fire extinguishers identified by the City. Routine maintenance shall be completed during the inspection whenever practical. Fire extinguishers determined to be damaged, discharged, expired, or otherwise unsuitable for continued service shall be documented and reported to the City's designated Contract Administrator in accordance with this solicitation.
Visual Inspection
The Contractor shall inspect each fire extinguisher to verify, at a minimum:
The fire extinguisher is installed in its designated location and is readily visible and accessible
Access to the fire extinguisher is unobstructed
The fire extinguisher classification is appropriate for the hazard being protected
Manufacturer labels, operating instructions, and safety markings are legible
The extinguisher is properly mounted using an approved bracket or cabinet
The inspection tag is current and accurately reflects the service performed.
Mechanical Inspection
The Contractor shall inspect the condition and operation of the fire extinguisher, including but not limited to:
Pressure gauge and operating pressure
Cylinder shell for dents, corrosion, leakage, or other physical damage
Valve assembly
Carrying handle and operating lever
Safety pin and tamper seal
Hose, nozzle, horn, and hose retention devices
Threads, fittings, and connections
Condition of all external components.
Routine Maintenance
The Contractor shall perform all routine maintenance necessary to return the fire extinguisher to proper operating condition, including but not limited to:
Replace tamper seals and inspection tags
Clean exterior surfaces of the extinguisher
Replace worn or damaged approved components
Recharge extinguishers when required
Verify six-year internal maintenance and twelve-year hydrostatic testing intervals, where applicable
Return the extinguisher to its designated mounting location following completion of service.
Deficiencies
Any fire extinguisher found to be damaged, discharged, expired, non-compliant, or otherwise unserviceable shall be immediately reported to the City’s Contract Administrator. The Contractor shall provide written recommendations identifying the deficiency, recommended corrective action, and estimated cost. No repairs beyond routine annual inspection and maintenance shall be performed without prior City authorization unless necessary to address an immediate life safety concern.
Documentation
Upon completion of each inspection, the Contractor shall provide documentation identifying each fire extinguisher inspected, the services performed, deficiencies identified, replacement parts used, recharge services performed, testing completed, and recommendations for repair or replacement. Inspection records shall be submitted electronically in a format acceptable to the City and shall accompany the Contractor’s invoice.
7.4. Specialized Maintenance and Testing Services
The Contractor shall provide specialized fire extinguisher maintenance and testing services as required by NFPA 10, manufacturer recommendations, applicable federal and state regulations, and the City’s operational requirements. These services shall be performed only by properly trained and qualified personnel using approved equipment and materials.
Recharge Services
Fire extinguishers requiring recharge due to discharge, inspection, maintenance, or repair shall be serviced using extinguishing agents and materials that are compatible with the original manufacturer’s specifications. Recharge services shall include all labor, replacement seals, O-rings, tamper seals, inspection tags, and incidental materials necessary to restore the fire extinguisher to proper operating condition.
Recharge services shall not be performed unless authorized by the City or required to restore an extinguisher that has been discharged or opened during maintenance.
Six-Year Internal Maintenance
When required by NFPA 10, the Contractor shall perform six-year internal maintenance (tear-down) of applicable fire extinguishers.
Internal maintenance shall include, at a minimum:
Internal examination of the cylinder and valve assembly
Inspection of internal components for corrosion, contamination, wear, or damage
Replacement of required O-rings, valve stem seals, gaskets, and other approved service components
Verification that the extinguisher remains suitable for continued service
Reassembly, recharge, testing, certification, and documentation in accordance with NFPA 10 and manufacturer recommendations
Internal maintenance shall only be performed on extinguishers that pass the required visual inspection. The Contractor shall immediately notify the City if any extinguisher fails inspection or is determined to be unsafe or unsuitable for continued service.
Hydrostatic Testing
The Contractor shall perform hydrostatic testing at the intervals required by NFPA 10, U.S. Department of Transportation (DOT) regulations, manufacturer recommendations, and other applicable requirements.
Hydrostatic testing shall include:
Transportation of extinguishers requiring off-site testing, when necessary
Performance of hydrostatic testing by appropriately licensed and qualified personnel
Replacement of required service components following testing
Recharge and recertification of the extinguisher following successful completion of the test
Documentation of all testing results
Fire extinguishers that fail hydrostatic testing shall not be returned to service. The Contractor shall provide written notification identifying the failed extinguisher, reason for failure, and recommendations for replacement.
Off-Site Services
Certain specialized services, including hydrostatic testing and other maintenance that cannot reasonably be completed on-site, may be performed at the Contractor’s facility. Fire extinguishers removed from City facilities or fleet operations shall be returned within two (2) weeks unless otherwise approved by the City. Whenever practical, the Contractor shall provide temporary loaner fire extinguishers of equal or greater rating to maintain continuous fire protection while City-owned extinguishers are being serviced.
City Authorization
Repairs, specialized maintenance, hydrostatic testing, replacement fire extinguishers, or additional services beyond routine annual inspection shall require prior authorization from the City’s designated Contract Administrator unless immediate action is necessary to eliminate an imminent life safety hazard.
7.5. Service Locations and Scheduling
The Contractor shall coordinate all services with the City's designated Contract Administrator. Services shall be performed at City-owned facilities, fleet vehicles, and equipment located throughout the City of Pasadena. The City reserves the right to modify service locations, inspection schedules, and quantities throughout the contract term as operational needs require.
City Facilities
Building fire extinguisher inspections shall generally be performed on-site at City-owned facilities in accordance with the City's annual inspection schedule. A list of City facility locations, annual inspection schedule, and geographic quadrant assignments are provided in the solicitation attachments for reference.
The Contractor shall coordinate building access and inspection scheduling with the City's designated Contract Administrator to minimize disruption to City operations.
Fleet Vehicles and Equipment
Fleet fire extinguisher services shall generally be performed at the following address unless otherwise directed by the City's designated Contract Administrator:
City of Pasadena – City Yards
323 W. Mountain Street
Pasadena, CA 91103
The Contractor shall coordinate service scheduling with Fleet personnel to minimize vehicle downtime and maintain operational readiness.
Off-Site Services
When specialized maintenance or testing requires fire extinguishers to be removed from service, the Contractor shall coordinate the removal and return of the fire extinguishers with the City’s designated Contract Administrator.
When approved by the City and necessary to maintain continuous fire protection, the Contractor shall provide temporary loaner fire extinguishers of equal or greater classification and capacity while City-owned fire extinguishers are undergoing off-site service.
Scheduling
Routine inspections and maintenance shall be scheduled in coordination with the City’s designated Contract Administrator.
The City reserves the right to modify inspection schedules, service locations, building assignments, and quantities as operational needs require. The Contractor shall make reasonable efforts to accommodate schedule adjustments requested by the City.
7.6. Reporting and Documentation Requirements
The Contractor shall maintain complete and accurate service records for all work performed under this contract.
Inspection Reports
Upon completion of each service visit, the Contractor shall provide an electronic inspection report acceptable to the City. At a minimum, each report shall include:
Service date
Building, facility, or vehicle identification
Asset number and/or manufacturer barcode
Type and size of fire extinguisher
Services performed
Recharge services completed
Hydrostatic testing performed
Parts replaced
Quantities
Technician name
Recommendations for repair or replacement
Deficiencies identified
Inspection status
Failed Equipment
Fire extinguishers that fail an inspection, internal maintenance, or hydrostatic test shall be documented in a separate report identifying:
Asset identification
Reason for failure
Recommended corrective action
Estimated replacement cost, if applicable
Invoicing
Invoices shall include sufficient detail to verify services performed and shall correspond to the inspection reports submitted for the same service period. The City reserves the right to reject invoices containing unauthorized work or insufficient documentation.
7.7. Performance Standards
The Contractor shall perform all services in a professional, timely, and workmanlike manner.
At a minimum, the Contractor shall:
Schedule routine service requests within two (2) weeks of notification
Respond to urgent service requests within forty-eight (48) hours
Coordinate emergency service requests immediately upon notification by the City
Ensure technicians wear company uniforms and photo identification while performing services
Check in with the designated City representative before beginning work at each location
Exercise reasonable care to protect City property during the performance of services
Maintain service vehicles with sufficient tools, equipment, replacement parts, and extinguishing agents to complete routine inspections and repairs during scheduled service visits
Complete work during normal City business hours unless otherwise approved by the City
Minimize disruptions to City operations while performing services
Promptly correct deficiencies identified by the City at no additional cost when the deficiencies result from the Contractor’s workmanship or failure to comply with the contract requirements
7.8. Minimum Product Requirements
All replacement fire extinguishers, repair components, recharge agents, accessories, and related materials furnished under this contract shall meet or exceed the minimum requirements identified below.
General Requirements
The Contractor shall provide products and materials that are:
New, unused, and free from defects
Suitable for the intended application and compatible with the existing fire extinguisher
Compliant with the latest editions of NFPA 10, applicable manufacturer specifications, and all federal, state, and local regulations
UL listed or otherwise certified, where applicable
Free from damage, excessive wear, corrosion, contamination, or deterioration
Replacement Parts
Replacement parts shall:
Be original equipment manufacturer (OEM) parts or equivalent components that meet or exceed OEM specifications
Be compatible with the make and model of the fire extinguisher being serviced
Include all necessary hardware, seals, gaskets, O-rings, valve stem seals, tamper seals, inspection tags, and related components required to complete the repair
Be installed in accordance with manufacturer recommendations
Recharge Materials
Recharge agents shall:
Meet the manufacturer’s specifications for the specific fire extinguisher being serviced
Be appropriate for the extinguisher classification and hazard rating
Be uncontaminated and stored in accordance with manufacturer recommendations and applicable safety regulations
Replacement Fire Extinguishers
When replacement fire extinguishers are authorized by the City, the Contractor shall furnish extinguishers that:
Meet the required fire classification and capacity for the intended application
Are listed and labeled by an approved nationally recognized testing laboratory
Include all required operating instructions, safety labels, and certification markings
Are complete with mounting brackets or hardware, when applicable
The Contractor shall not substitute extinguisher types, capacities, or manufacturers without prior written approval from the City.
Accessories
When requested by the City, the Contractor shall provide compatible fire extinguisher accessories, including but not limited to:
Mounting brackets
Vehicle mounting hardware
Fire extinguisher cabinets
Cabinet replacement components
Identification signs
Inspection tags
Tamper seals
Other related fire extinguisher accessories
Product Approval
The City reserves the right to reject any product, material, or replacement component that does not comply with the requirements of this solicitation or is determined to be unsuitable for the intended application. The Contractor shall replace any rejected product at no additional cost to the City.
8. Public Contract Claims Procedure
PUBLIC CONTRACT CODE SECTION 9204 PUBLIC WORKS CLAIMS PROCEDURE
AB 626, approved by the Governor on September 29, 2016, created a new Public Contract Code Section 9204, which specifies new procedural requirements for claims submitted by a contractor on any public works project. These new requirements contain burdens for both private contractors and public entities and are specifically made applicable to charter cities.
For this legislation, a “public works project” is defined as “the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind.” This definition is not as broad as in the Prevailing Wage Law.
A “claim” is defined as “a separate demand by a contractor sent by registered mail or certified mail with return receipt requested…” and is limited to three types of contract disputes:
1. “A time extension…for relief from damages or penalties for delay assessed by a public entity….”
2. “Payment by the public entity of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled”, and/or
3. “Payment of an amount that is disputed by the public entity.”
Upon receipt of a claim, a public entity must "conduct a reasonable review" and provide a written statement to the contractor within 45 days of receipt of the claim. Failure of a public entity to respond to a claim within the time periods described in Section 9204 "shall result in the claim being deemed rejected in its entirety."
For any undisputed portion of a claim, a public entity must make payment within 60 days of the public entity's issuance of the written statement.
If the contractor disputes the public entity's written statement, or if the public entity fails to respond, the contractor may demand "an informal conference to meet and confer for settlement of the issues in dispute." The public entity must schedule the meet and confer conference within 30 days of the demand.
Within 10 business days following the meet and confer conference, the public entity must provide a written statement identifying the portion of the claim that remains in dispute.
Any payment due on an undisputed portion of the claim must be made within 60 days of the meet and confer conference. Amounts not paid in a timely manner shall bear interest at 7 percent per year.
After the meet and confer conference, any disputed portion of the claim "shall be submitted to non-binding mediation." If mediation fails to resolve the dispute, the parts of the claim that remain in dispute shall be subject to applicable procedures outside Section 9204 (statutory and contractual).
The full text of this new legislation is set forth below:
THE PEOPLE OF THE STATE OF CALIFORNIA DO ENACT AS FOLLOWS:
SECTION 1.
Section 9204 is added to the Public Contract Code, to read:
9204.
(a) The Legislature finds and declares that it is in the best interests of the state and its citizens to ensure that all construction business performed on a public works project in the state that is complete and not in dispute is paid in full and in a timely manner.
(b) Notwithstanding any other law, including, but not limited to, Article 7.1 (commencing with Section 10240) of Chapter 1 of Part 2, Chapter 10 (commencing with Section 19100) of Part 2, and Article 1.5 (commencing with Section 20104) of Chapter 1 of Part 3, this section shall apply to any claim by a contractor in connection with a public works project.
(c) For purposes of this section:
(1) “Claim” means a separate demand by a contractor sent by registered mail or certified mail with return receipt requested, for one or more of the following:
(A) A time extension, including, without limitation, for relief from damages or penalties for delay assessed by a public entity under a contract for a public works project.
(B) Payment by the public entity of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled.
(C) Payment of an amount that is disputed by the public entity.
(2) “Contractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who has entered into a direct contract with a public entity for a public works project.
(3) (A) “Public entity” means, without limitation, except as provided in subparagraph (B), a state agency, department, office, division, bureau, board, or commission, the California State University, the University of California, a city, including a charter city, county, including a charter county, city and county, including a charter city and county, district, special district, public authority, political subdivision, public corporation, or nonprofit transit corporation wholly owned by a public agency and formed to carry out the purposes of the public agency.
(B) “Public entity” shall not include the following:
The Department of Water Resources as to any project under the jurisdiction of that department.
The Department of Transportation as to any project under the jurisdiction of that department.
The Department of Parks and Recreation as to any project under the jurisdiction of that department.
The Department of Corrections and Rehabilitation with respect to any project under its jurisdiction pursuant to Chapter 11 (commencing with Section 7000) of Title 7 of Part 3 of the Penal Code.
The Military Department as to any project under the jurisdiction of that department.
The Department of General Services as to all other projects.
The High-Speed Rail Authority.
(4) “Public works project” means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind.
(5) “Subcontractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who either is in direct contract with a contractor or is a lower tier subcontractor.
(d) (1) (A) Upon receipt of a claim pursuant to this section, the public entity to which the claim applies shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public entity and a contractor may, by mutual agreement, extend the time period provided in this subdivision.
(B) The claimant shall furnish reasonable documentation to support the claim.
(C) If the public entity needs approval from its governing body to provide the claimant a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide the claimant a written statement identifying the disputed portion and the undisputed portion.
(D) Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph (3) shall apply.
(2) (A) If the claimant disputes the public entity’s written response, or if the public entity fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute.
(B) Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section.
(C) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section.
(D) Unless otherwise agreed to by the public entity and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced.
(E) This section does not preclude a public entity from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program, if mediation under this section does not resolve the parties’ dispute.
(3) Failure by the public entity to respond to a claim from a contractor within the time periods described in this subdivision or to otherwise meet the time requirements of this section shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the public entity’s failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant.
(4) Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum.
(5) If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against a public entity because privity of contract does not exist, the contractor may present to the public entity a claim on behalf of a subcontractor or lower tier subcontractor. A subcontractor may request in writing, either on his or her own behalf or on behalf of a lower tier subcontractor, that the contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behalf of the subcontractor. The subcontractor requesting that the claim be presented to the public entity shall furnish reasonable documentation to support the claim. Within 45 days of receipt of this written request, the contractor shall notify the subcontractor in writing as to whether the contractor presented the claim to the public entity and, if the original contractor did not present the claim, provide the subcontractor with a statement of the reasons for not having done so.
(e) The text of this section or a summary of it shall be set forth in the plans or specifications for any public works project that may give rise to a claim under this section.
(f) A waiver of the rights granted by this section is void and contrary to public policy, provided, however, that (1) upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable change order, claim, and dispute resolution procedures and requirements in addition to the provisions of this section, so long as the contractual provisions do not conflict with or otherwise impair the timeframes and procedures set forth in this section.
(g) This section applies to contracts entered into on or after January 1, 2017.
(h) Nothing in this section shall impose liability upon a public entity that makes loans or grants available through a competitive application process, for the failure of an awardee to meet its contractual obligations.
(i) This section shall remain in effect only until January 1, 2027, and as of that date is repealed, unless a later enacted statute that is enacted before January 1, 2027, deletes or extends that date.
(Amended by Stats. 2019, Ch. 489, Sec. 1. (AB 456) Effective January 1, 2020. Repealed as of January 1, 2027, by its own provisions.)
SEC. 2.
The Legislature finds and declares that it is of statewide concern to require a charter city, charter county, or charter city and county to follow a prescribed claims resolution process to ensure there are uniform and equitable procurement practices.
SEC. 3.
If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
9. Bidder's Proposal
To the Honorable City Council of the City of Pasadena, California
In response to the Notice Inviting Bids for Fire Extinguisher Inspection, Maintenance, Testing, Repair Services and Parts the undersigned proposes and agrees to furnish the required material in strict conformity with the general and detailed specifications and data on manufacturer’s data sheets and/or exceptions made part of the bid and accepted by the City in writing.
INSTRUCTIONS:
Each bidder must bid on all items shown in the Bidder’s Pricing Table. If any bidder makes any alteration, interlineation or deviation in any of the printed matter of the proposal or if the signature of the bidder is incomplete, the bid will be considered informal and may be rejected.
The price bid shall include any and all charges required under the California Retail Sales Act of 1933 as amended and the California Use Tax Act of 1935.
Instructions:For each Item, please multiply the Unit Price by the corresponding Quantity to determine the Item Price. Sum the Item Prices to determine the Item Total. Sum the Item Total and the Sales Tax to determine the Grand Total Price.
All bid pricing must be entered into the City's eProcurement Portal or the bid may be considered informal and deemed non-responsive, do not use a separate document attachment to represent your pricing. All required attachments must be completed and uploaded electronically into City's eProcurement Portal. prior to the set bid date and time in the Notice Inviting Bids (#Notice Inviting Bids). The City reserves the right to reject or deem nonresponsive unbalanced price proposals that are either in excess of or below the reasonable cost normally associated with the work.
Export This Table
Line Item
Description
Quantity
Unit of Measure
Unit Cost
Total
SERVICE
1
Annual Maintenance - Dry Chemical Fire Extinguisher
1500
Each
2
Annual Maintenance - Carbon Dioxide Fire Extinguisher
25
Each
3
Annual Maintenance - Water Fire Extiguisher
20
Each
4
Annual Maintenance - Clean Agent Fire Extinguisher
10
Each
5
Annual Maintenance - Halon Fire Extinguisher
5
Each
6
Six-Year Maintenance - Dry Chemical
250
Each
7
Six-Year Maintenance - Halon
5
Each
8
Six-Year Maintenance - Carbon Dioxide
10
Each
9
Hydrostatic Test - Dry Chemical
200
Each
10
Hydrostatic Test - Carbon Dioxide
15
Each
11
Hydrostatic Test - Water
10
Each
12
Hydrostatic Test - Halon
5
Each
13
Recharge - ABC Dry Chemical
600
Per Pound
14
Recharge - Carbon Dioxide
100
Per Pound
15
Recharge - Clean Agent
20
Per Pound
16
Regular Service Call
25
Each
17
Emergency Service Call
10
Each
PARTS AND MATERIALS
18
2.5 lb ABC Fire Extinguisher [*]
15
Each
19
5 lb ABC Fire Extinguisher [*]
100
Each
20
10 lb ABC Fire Extinguisher [*]
50
Each
21
20 lb ABC Fire Extinguisher [*]
10
Each
22
Carbon Dioxide Fire Extinguisher Replacement [*]
10
Each
Sales Tax (@ 11%)
$0.00
Total
$0.00
Columns
[*]
Denotes item is taxable
10. Attachments
A - CITY BUILDING LOCATIONS
B - CITY BUILDING QUADRANT
C - GENERAL INSURANCE REQUIREMENTS WITH PROFESSIONAL LIABILITY
D - MASTER LABOR AND MATERIALS CONTRACT (12-18-24)
E - REQUIRED FORMS - AAs - SIG-LEGAL-STATUS - DECLARATION OF NONCOLUSION 08022024 v2
L - RELEVANT EXPERIENCE FORM
11. Submittal Instructions
11.1. Early Preparation for Submission
We value your participation in this solicitation and want to ensure you have every opportunity to present your response in the manner instructed in this solicitation. It is important that you submit a complete response prior to 3:00 pm on Thursday, December 10, 2026 through this eProcurement portal. We strongly advise against waiting to within the last three days of the submittal deadline to begin working on your response. Starting early on your response increases time to:
Thoroughly review all requirements and the entire solicitation document.
Gather, organize, and complete the necessary documents for submittal.
Address any unforeseen technical issues that may arise during the preparation or submittal of your response.
Delaying your response may result in errors, or can cause you to miss the submission deadline. Either of which can negatively impact your submittal or cause your submittal to not be accepted.
11.2. Training Resources for Vendors:
Screen Shots:
Instructions for the new eProcurement System: The following link will help you Get Started (https://opengov.my.site.com/support/s/article/c7a5affa-e073-4d5a-8d87-b6eadcf343a9) and will include vendor guides for using the system. Below are additional screen shots for support.
All Video Guides: OpenGov Procurement Vendor Training
New Supplier Account
Submit a Bid or Proposal
Updating Your Company Designation on a Solicitation
Vendor Selection of Category Codes
How To Subscribe To Organizations And Find Active RFPs & Bids
Login Process
How to Edit or Withdraw your Proposal after it's been Submitted
How to Submit a Question
Viewing Bid Results
Video Trainings
11.3. OpenGov Technical Support
Technical support for an eProcurement system plays a vital role in ensuring smooth operations. You can call or email technical support using the information below.
Phone: (650) 336-7167
Email: support@support.opengov.com
Issue Log: https://opengov.my.site.com/support/s/contactsupport/incident
Live Chat: Click on the circle blue icon at the bottom right of the screen.
11.4. Internet Access
The City cannot guarantee that equipment involved in Solicitation Submission will be available to provide information or receive transmittals. It is your responsibility to ensure that you have current information and that your Submission is received as instructed in this solicitation complete and prior to the deadline. The City is not responsible for the confidentiality of information transmitted over the Internet.
It is the Respondent's responsibility to review your status in our eProcurement system and update your contact information and notification preferences accordingly.
The City does not recommend waiting until the last two days to start preparing or submitting your response.
11.5. Electronic Submission and Delivery Instructions
Parties interested in responding are required to submit electronically through the City of Pasadena's eProcurement Portal prior to 3:00 pm, Thursday, December 10, 2026. Please upload all required documents as instructed in the section named Submittals/Checklist sufficiently early electronically through the city's eProcurement Portal before the time and day listed in this solicitation. Responses must be received in the system prior to the deadline.
The Specification or Scope of Work included in this Notice shall be considered part of any contract made pursuant thereunder.
11.6. Withdrawal of Proposal
Any Bidder or Proposer may withdraw their response via the City's eProcurement Portal prior to 3:00 pm on Thursday, December 10, 2026.
11.7. City Changes to the Solicitation Documents
The City reserves the right to change any part of these Instructions and Specifications any time prior to the bid opening. Any changes shall be in the form of addenda and will become a part of the bid documents and of the contract. Addenda shall be made available to each Bidder or Proposer. A Bidder's or Proposer's failure to address the requirements of the addenda may result in the response not being considered. If the City determines that a time extension is required for the bid, the addenda will give the new submission date.
Addenda shall be acknowledged via the City'seProcurement Portal for the project named "Fire Extinguisher Inspection, Maintenance, Testing, Repair Services and Parts." Project ID: 2026-IFB-LM-0555. Bidders or Proposers can view a list of addenda released by the City by clicking on "Addenda & Notices." While drafting a response, there is a section for "Addenda Confirmation" where Bidders or Proposers must acknowledge each addenda released.
11.8. Deadline for Questions
The deadline to submit questions related to this solicitation is Friday, November 20, 2026, prior to 2:00 pm.
Questions regarding this solicitation should be submitted directly through the City's eProcurement Portal Q&A function. Do not contact any City employee or official regarding this solicitation. Any questions submitted after the date and time specified may not be considered.
11.9. Follow these simple steps to submit your proposal electronically:
If you are already registered and need help logging in or retrieving your user information utilize the blue chat bubble visible on the lower right hand corner of the screen.
Click on the hyperlink for the City's eProcurement Portal to create your vendor profile.
Electronic Submission of Bids
All Proposers are required to submit their bid pricing electronically via the city's eProcurement Portal. The electronic system will close submission exactly at the date and time set forth in this solicitation or as changed by addenda. In addition, your bid must be submitted via the eProcurement Portal.
Proposers are responsible for submitting and having their bid accepted before the closing time set forth in this solicitation or as changed by addenda. NOTE: It is the Proposer's sole responsibility to ensure their bid and document(s) are uploaded, transmitted, and arrive in time electronically. The City will have no responsibility for bids that do not arrive in a timely manner, no matter what the reason.
Upon closing of the Bid, Bid Results will be available on the City's eProcurement Portal.
In the case of a discrepancy between the electronic bid schedule (pricing) and any uploaded Bid schedule document or pricing, the electronic bid schedule will be the accepted bid.
Steps to Submit Your Electronic Proposal:
To submit an offer to the City, vendor must begin by clicking on the green DRAFT PROPOSAL button.
https://procurement.opengov.com/portal/pasadena/projects/309516
1. Acknowledge all Addenda
2. Accept City of Pasadena Terms and Conditions Message
3. Answer all required vendor questions.
4. Upload all required forms. Proposer may save their work and return.
5. Review your work and submit proposal when ready.
6. You will receive a confirmation email from OpenGov upon receipt of your bid/proposal.
7. Proposer may withdraw their bid at any time prior to 3:00 pm on Thursday, December 10, 2026.
Note: If an addenda is issued after a response has been submitted, Proposer or bidder must return to take steps below. Failure to do both steps will result in an invalidated offer.
1- Acknowledge the new addenda; and
2- Resubmit your bid through the City's eProcurement Portal.
Do Not upload a Zip File: Unzip Your Files
Note: If your files are [zipped or] in a zip folder, you may need to unzip the files before uploading. The following instructions may be helpful to do so.
Open File Explorer, and find the zipped folder.
To unzip the entire folder, right-click to select Extract All, and then follow the instructions.
To unzip a single file or folder, double-click the zipped folder to open it. Then, drag or copy the item from the zipped folder to a new location.
11.10. Vendor Registration Instructions & Customer Service information:
Click here to register onto the City's eProcurement Portal hosted by OpenGov.
If you are already registered and need help logging in or retrieving your user information simply click on the blue chat bubble on the lower right hand corner of your screen or contact OpenGov at procurement-support@opengov.com for help at any time.
Customer Service
For assistance with e-bidding or uploading documents: Contact OpenGov via the blue chat bubble on the lower right hand corner of your screen or email at procurement-support@opengov.com.
Monday through Friday 5 am - 5 pm PST, except statutory holidays-- response time is typically less than ten minutes.
11.11. Surety2000 Instructions
If a bid bond is required, below are instructions for utilizing Surety2000 to submit an electronic bid bond.
Video Trainings:
How a Contractor Registers with Surety2000: https://drive.google.com/file/d/1SCj8obRykze8hIIrG84yYD5Wbod7ZQuR/view
How to Create a Bond: https://drive.google.com/file/d/1_ZphPelkFAhVhYhUdpKU1sC1xpNjVnf3/view
How to Sign the Bond: https://drive.google.com/file/d/1wT3UVU-hiecfocwAOwaAh9rP93mKQ-9P/view
Bid Bond Instruction:
Bidders must provide all required information for the City to verify the bond with their bid. The bond must meet the following requirements and characteristics: Bid security in the amount of five percent (5%) of the total bid price in the form of a redeemable or callable electronic surety bond, meeting City requirements, must accompany all bids. If the Bidder to whom the contract is awarded shall for fifteen (15) calendar days after such award fail or neglect to enter into the contract with the required insurance documentation, submit the Construction & Demolition Waste Management Plan, and file the required bonds, the City may deposit in its treasury said bid security and, under no circumstances, shall it be returned to the defaulting Bidder. Failure to return signed contract with all the attachments stated above may result in having the project awarded to the next lowest bidder.
Here is what bidders must provide to their bonding agent when trying to setup a bid bond for the City of Pasadena: The Project ID of the solicitation on which you are bidding. Your Contractor Vendor ID which is your Federal Tax ID or it’s equivalent. Both fields are required for validation. If you are having trouble finding these ID’s, please contact Surety2000 at 1-800-660-3263 or email help@surety2000.com
12. Submittals/Checklist
The following list is provided for the convenience of both you and the City and to help eliminate errors and omissions which may render your bid unacceptable. Please review this Bidder's Checklist section. Ensure that all forms required at the time of bid are included with your bid proposal in and through this portal.
Training Resources for Vendors:
Videos:
Instructions for the new eProcurement System: The following link https://help.procurement.opengov.com/en/articles/5815468-opengov-procurement-vendor-trainingwill include video instructions for using the new system.
Screen Shots:
Subscribing for an agency's notifications - Using the Network Tab
Following a project
How to respond to a bid, submit a bid, or No bid?
Get Notifications
Managing Addenda
OpenGov Procurement Support
1. Acknowledgements
1.1. Acknowledgement*
By submitting this bid the Bidder hereby certifies under penalty of perjury of the laws of the State of California that all representations made in the documents that comprise the proposal for Fire Extinguisher Inspection, Maintenance, Testing, Repair Services and Parts due on Thursday, December 10, 2026 are true and correct to the best of my knowledge at the time of the proposal’s submission.
By confirming, the bidder acknowledges the following:
We have reviewed and agreed to all of the documents contained in this solicitation and understands that the City will not be responsible for any errors or omissions on the part of the vendor in making up this bid or proposal.
The representations herein are made under penalty of perjury.
We hereby offer to sell the City of Pasadena the materials, products, and/or services at the prices shown and under the terms and conditions included hereon or attached or referenced.
Please confirm
*Response required
1.2. Confirmation, if You are the Recommended Company*
Subsequent to the closing of this solicitation, but prior to contract award, the recommended vendor will be required to provide the following documents within 10 calendar days of being notified, otherwise the submitted proposal may be deemed non-responsive.
Please confirm that you will provide the following per these instructions.
Request for Tax Payer Identification Number and Certification (IRS Form W-9)
Pasadena Business License
Any Required Licenses or Certifications
All Insurance Required by this Solicitation (If Required)
Please confirm
*Response required
1.3. Prices must be valid for 180 days*
Bidder agrees that their bid shall remain open and shall not be withdrawn for a period of not less than one hundred and eighty (180) calendar days from the date of opening bids, or until rejected by the City, whichever occurs first.
Please confirm
*Response required
2. Forms
2.1. AA1; AA2; AA3; Signature & Legal Status; and Declaration of Non-Collusion*
If your submittal does not include all of the below items, it may be deemed non-responsive.
Each Bidder must submit a completed Form AA-1. Failure to submit this form will result in automatic disqualification with no exceptions unless Bidder has an approved form on file with the City. (Copy attached)
Form AA-2 is required to be submitted for projects involving labor or services in excess of $25,000. (Copy attached)
Form AA-3 is Optional. (Copy attached)
A completed and signed "Declaration of Non-Collusion." (Copy attached)
Signature Page and Legal Status (Copy attached)
REQUIRED_FORMS_-_AAs_-_SIG-LEGAL-STATUS_-_DECLARATION_OF_NONCOLUSION_08022024_v2.pdf
*Response required
2.2. Relevant Experience Form *
Please download the below documents, complete, and upload.
RELEVANT_EXPERIENCE_FORM_(1).pdf
*Response required
2.3. Does your company have any Contracts with the U.S. Department of Homeland Security?*
Disclosures:
Respondents are invited to disclose any current contracts, subcontracts, or agreements with DHS, including any related data-sharing arrangements. If provided, respondents may include:
DHS agency or sub-agency (if applicable)
General description of services
Whether data-sharing with third parties is involved
If no such relationships exist, respondents may indicate “No.”
Questions related to the disclosure shall be asked and answered through the solicitation Question and Answer process. The completed disclosure form will be reviewed by and shared with the City Manager’s office. Please upload this form as part of the submittal checklist and email a copy to CMOContractsAssessement@cityofpasadena.net.
Yes
No
*Response required
When equals "Yes"
2.3.1. Disclosure of Contracts with the U.S. Department of Homeland Security (DHS)*
Disclosures:
Respondents are invited to disclose any current contracts, subcontracts, or agreements with DHS, including any related data-sharing arrangements. If provided, respondents may include:
DHS agency or sub-agency (if applicable)
General description of services
Whether data-sharing with third parties is involved
If no such relationships exist, respondents may indicate “No.”
Questions related to the disclosure shall be asked and answered through the solicitation Question and Answer process. The completed disclosure form will be reviewed by and shared with the City Manager’s office. Please upload this form as part of the submittal checklist and email a copy to CMOContractsAssessement@cityofpasadena.net.
DHS_Contract_Disclosure_Form.xlsx
*Response required
3. Qualifications
3.1. Copy of Required License(s) or Certification(s)*
Please upload a copy of your: California Office of the State Fire Marshal Portable Fire Extinguisher Concern License - Type AND U.S. Department of Transportation Cylinder Requalification Approval and Retester Identification Number
*Response required
3.2. CERTIFICATION REGARDING LOBBYING *
Please download the below documents, complete, and upload.
Disclosure_of_Lobbying_Activities.pdf
*Response required
3.3. Federal Required Certification*
Please download the below documents, complete, and upload.
Federal_Required_Certification_(4).pdf
*Response required