Generate a quick AI overview of this bid, pulled from its details and the attached documents.
Cobb County Water System is issuing this Solicitation for Request for Qualifications for Prequalification of New Contractors for Water and Sewer Line Construction, Manhole & Valve Box Adjustments, Cured-in-Place (CIPP) Rehabiliation, Manhole Rehabilitation, and Stormwater Construction. Submissions shall be reviewed on a quarterly basis but may be submitted at any time, via the County's eProcurement Portal at https://procurement.opengov.com/portal/cobbcoga.
1.2. Timeline
Release Project Date: August 29, 2025
Question Submission Deadline: May 24, 2028, 5:00pm
Bid Submission Deadline: May 31, 2028, 12:00pm
2. Project Details
2.1. Important Instructions for Electronic Submittals
The Cobb County Water System is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup. Once you have completed account registration, browse back to this page, click on "Draft Response", and follow the instructions to submit the electronic bid.
2.2. Scope of Work or Project Details
Please see the Attachments section for specifications and attachments.
Firm must meet requirements as set forth in the RFQ.
Scoring Method:
Pass / Fail
Weight (Points):
100 (100% of Total)
4. Vendor Questionnaire
Please Upload your COMPLETE response for Category 1 here, including any and all required forms listed in the solicitation and the corresponding attachments. Reference Forms for Applications required for Category 1.
(Do not upload cost information in here)
Please upload your COMPLETE response for Category 2 here, including any and all required forms listed in the solicitation and the corresponding attachments. Reference Forms for Applications required for Category 2.
Please upload your COMPLETE response for Category 3 here, including any and all required forms listed in the solicitation and the corresponding attachments. Reference Forms for Applications required for Category 3.
Please upload your COMPLETE response for Category 4 here, including any and all required forms listed in the solicitation and the corresponding attachments. Reference Forms for Applications required for Category 4.
Please upload your COMPLETE response for Category 5 here, including any and all required forms listed in the solicitation and the corresponding attachments. Reference Forms for Applications required for Category 5.
Attached documents:
• Request for Qualifications for First-Time Applicants
• 1. Water-Sewer Line Construction Application for Prequalification (First-Time Applicants)
• 2. Manhole and Valve Box Adjustments Application for Prequalification Package (First-time Applicants)
• 3. CIPP Rehabilitation Application for Prequalification (First-Time Applicants) Package (2025-2028 Period)
• 4. Manhole Rehabilitation Application for Prequalification (First-Time Applicants) Package (2025-2028 Period)
• 5. Stormwater Construction Application for Prequalification Package (2025-2028 Period)
• Reference forms for Application for all Categories
Source: Cobb County (solicitation OG_COBB-NewPrequal2026), retrieved via a public procurement portal. View the official posting — always confirm requirements and deadlines with the issuing agency.
Here are some similar opportunities
Let our AI help you find the right opportunity
Search with AI →