- Due Text
- Wednesday, January 13, 2027 5:00pm
- Posted At
- Fri, Nov 20, 2026 3:00 PM
- Documents
- West_Park_Cemetery_Administrative_Building.pdf, A - 01 NORTHERN IRELAND DISCLOSURE, B - 02 CCO 187-22, C - 03 Subcontractor Addition and Subtraction Policy, D - 04 DASD Minimum Deliverables (2026.06.04), E - 05B Design-Build Agreement Sample for MOCAP, F - 06 2023 Reimbursables_Policy, G - 07 Cleveland City-Wide Asbestos Policy (2017.05.19), H - 08 City of Cleveland Sustainable Building Policy 2013-04, I - 09 017419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL, J - 10 FORM CWM-7 DEMOLITION WASTE, K - 11 FORM CWM-8 CONSTRUCTION WASTE, L - 12 PART B - General Conditions (final 8-28-25) - Shortcut, M - 13 PART C - SUPPLEMENTAL GENERAL CONDITIONS__2025_09_16, N - 14 PW NOTICE -Valerie Harvey (2024.12.27), O - 15 Prev Wage Notification (2024.12.27), P - 16 PW CONTRACTOR RESPONSIBILITY - OHIO (2024.12.27), Q - 17 PW NOTIFICATION TO EMPLOYEE - OHIO (2024.12.27), R - 18 PW AFFIDAVIT OF COMPLIANCE - OHIO (2024.12.27), S - 19 PW THRESHOLD LEVELS - OHIO (2024.01.01), T - 20 PW INSTRUCTIONS FOR PREPARING CERTIFIED REPORTS - OHIO (2024.12.27), U - 21 PW CERTIFIED PAYROLL REPORT - OHIO (2024.12.27), V - 22 PW RATES - COVER LETTER (2024.12.27), W - 23 Wage Theft PDF Version, X - 24 RFP MAILING LIST - DB 2026 08 27, Y - 25 Westpark Cemetery Existing Conditions Survey 2025-03-25, Z - 26 Criteria Drawings and Narratives
- Numeric Id
- 297754
- Description
- The City of Cleveland ("City" “Client” “Owner”) is seeking qualified Design-Build Team Partners ("Contractor" “Design-Builder” “D-B” “D-B Team” "Consultant") to provide professional Architecture, Engineering, and Construction services for the new West Park Cemetery Administrative Building. The Project is considered a Traditional Design-Build, and will be managed by the Mayor’s Office of Capital Projects (MOCAP), through the Division of Architecture and Site Development (DASD). MOCAP oversees the administration of the City’s Capital Improvement Plan (CIP) for all City-owned facilities, outdoor spaces, and infrastructure, working through its three divisions: the Division of Architecture & Site Development, the Division of Engineering & Construction, and the Division of Real Estate. The mission statement for MOCAP is:
To provide for the planning, designing, construction, and preservation of the City of Cleveland's facilities and infrastructure through collaborative and comprehensive planning, leadership in management, excellence in sustainable design and technical expertise, and quality construction based on integrity and professionalism.
Background
Description of Need
The project's goal is to construct a new ground-up facility on the site to support the day-to-day administrative activities and operations on the property along with providing appropriate storage for project record keeping.
A temporary facility is currently onsite housing this program function and will be removed once a permanent structure is in place.
Timeline
Release Project Date:
November 20, 2026
Pre-Proposal Meeting (Non-Mandatory):
December 1, 2026, 11:00am
City Hall Room 518
Pre-Proposal Site Visit:
December 1, 2026, 1:00pm
- Document Text
- 1. Scope of Services
1.1. Program
It is the City’s intent to hire an experienced, communicative, responsive, and collaborative Contractor with a creative Architectural and Engineering Team (“Consultant”) qualified in Design-Build construction. The Contractor and its Consultant is to provide full design and construction services outlined below.
Site Design
Site work will include the extension of existing underground and or overhead utilities (or new) as required to provide appropriate operational services to the facility. New pavement and sidewalks will be incorporated into site design
Administrative Building
The new construction will comprise of a single-story facility to support administrative functions associated with the property. Building programmed spaces shall include a records and meeting area, office, (2) ADA compliant unisex restrooms, kitchenette, along with building support spaces (mechanical, electrical, janitor closet, etc.).
1.2. Possible Separate Bid Packages
Based on any opportunity agreed upon with the Director of the Mayor’s Office of Capital Projects, the Design-Builder shall be responsible to evaluate the advantages and disadvantages of the need for separate bid packages that best serve the economic interests of the City.
1.3. City’s Consultants
The City of Cleveland has retained a bridging criteria Architect and Engineering Consultant(s) (“Consultant” “City’s Consultant” “Architect” “Engineer” “A-E” “Criteria Designer”) through the end of Construction, of which will remain contractually under the City of Cleveland or its’ Designee. The Consultants shall advise and consult with the City, and may perform such tasks as submittal and RFI review, field verification, meeting attendance, and other customary Construction Administration activities.
1.4. Existing Documentation Brief
MOCAP and the Owner’s Representative Team have compiled design criteria documents with preliminary diagrams which capture the owner’s intended design and function for the building. This information will serve as a basis for the overall project intent.
2. Stages
2.1. Stages
Below are the brief outlined phases of the Project.
Due Diligence and Early Design:
This is work prior to execution of the design-build amendment. Here, the Design-Build Team will gather and document information related to the existing physical conditions and project needs, conduct project kick-off workshops, complete various other activities to establish goals and constraints of the project, and develop, document, and present design solutions through Design Development for the purpose of attaining an approved design set, and a Guaranteed Maximum Price (GMP).
Phase A: Existing Conditions Verification
Phase B: Program Verification and Preliminary Design
Phase C: Technical Review and Schematic Design
Execution of the GMP Construction Amendment: THIS IS FOR TRADITIONAL DB
This is work including development and approval of the final GMP cost prior to Construction Documents.
Phase E: Design-Builder’s Final GMP Review
Phase F: Confirmation of the Proposal to continue through Design and Construction
Detailed Design and Construction:
This is work following approval of the design, whereas the Design-Builder will progress into Construction Documents in accordance with project requirements. Efforts will also correlate with the sequence of construction of the project.
Phase G: Construction Documents
Phase H: Permit Attainment
Phase I: Construction Administration
Phase J: Closeout
Administrative Phase Requirements
Below is the outlined administrative and project management requirements for each Stage and Phase to be included in the Design-Built Teams’ fee. All meetings are to be hosted by the Design-Build Team with agenda and minutes, and in person, with exact nature of the meetings are to be determined with the City’s PM. Coordination, communication, and quality control is expected through the entirety of the project.
Phase A: Existing Conditions Verification
Kickoff with City staff, establishing phase goals.
Due diligence field verification including all applicable disciplines. Exact duration required is up to the Consultant.
Bi-Weekly meetings with agenda and minutes.
Review meetings for reports, surveys, and preliminary code analysis.
Phase B: Program Verification and Preliminary Design
Kickoff with City, establishing phase goals with attention to scope, existing conditions, code risk, scope risk, schedule, and budget.
Bi-Weekly meetings with agenda and minutes.
Provide an Excel spreadsheet encapsulating all City review comments with direction, feedback, solutions, etc. on the comments.
Conceptual Phasing Plan: Create phasing plan for renovations, identifying sequence of renovations and swing space(s) to be used.
Phase C1: Technical Review
Review meeting of narratives, scope questions, field verification risk and concerns, recommendations, and code.
Phase C2: Schematic Design
Bi-Weekly meetings with agenda and minutes.
Review meeting to be model walk through or plan flip session.
Public meetings including Landmarks, Design Review Committees, Planning, and other State, municipal, or local agency meeting.
Provide an Excel spreadsheet encapsulating all City review comments with direction, feedback, solutions, etc. on the comments.
Phase E: Design-Builder’s Final GMP THIS IS FOR TRADITIONAL DB
Assume OEO compliance will be requested including backup documentation based on the final agreed upon GMP.
GMP negotiation exercises for unforeseen conditions or requests may be requested.
The parties will engage in an "open book" pricing method in which all work shall be based upon competitive pricing that will be reviewed by the Contracting Authority and the Owner, the Criteria A/E, and the D-B. The Contracting Authority and/or Owner shall have access to all books, records, documents and other data in the D-B's possession related to itself, its subcontractors and material suppliers pertaining to bidding, pricing or performance of the Agreement.
Approval of the Final GMP prior to Construction.
Any “bid day savings” shall become part of the Contingency.
Phase G: Construction Documents
Bi-Weekly meetings with agenda and minutes.
Review meeting to be model walk through or plan flip session.
Continuation of Public meeting needs.
Provide an Excel spreadsheet encapsulating all City review comments with direction, feedback, solutions, etc. on the comments.
Phase H: Permit Attainment
Submit to all permitting authorities on behalf of the City, including but not limited local and state.
Periodic AHJ follow-up including at the 30 day mark and weekly beyond.
Response letter to AHJ comments.
Public/ AHJ meetings related to permit attainment.
Perform an AHJ review meeting as necessary, including create agenda and minutes with action items.
Phase I: Construction Administration
Fee for CA shall be all-inclusive and unstipulated.
General communication with the City and the General Contractor.
Weekly OAC meetings in person.
For budgeting, assume no less than (2) total field visits by either the Architect and other pertinent consultant per week. Multiple on-site meetings may be requested during critical phases of construction and swapped for other weeks.
Prior to the City, review and approve all A-E related requests for interpretation, submittals, cut sheets, and shop drawings. Mock-ups as required.
Provide sketches, bulletins, and revised drawings for interpretation requests.
Review and certify all pay applications for payment prior to the City, electronically.
Review and approve all Field Changes and Field Change Requests.
Provide (2) punch list walk through including (1) person for each discipline.
Phase J: Closeout
Provide complete as-built condition drawings in PDF and CAD.
Provide complete O&M Manuals.
1-year warranty walkthrough at approximately 10-11 months after construction.
Resolve post-occupancy claims of deficient work during the 1-year warranty period.
Project Architect(s) and Engineer(s) of Record are expected to facilitate and interpret the needs of the City and its’ End User. During Design, this includes, but is not limited to: Code Analysis and Compliance; Existing Conditions Assessment; Design and Development; Exterior & Interior Finishes; Contractor and Client provided FF&E Coordination; Construction Document and Consultant Coordination; Permit Attainment and AHJ Coordination; and Final Construction Document Review and Approval Support. During Construction, the Architect(s) and Engineer(s) of Record scope shall include, but is not limited to: Interpretation of the Construction Documents; Contractor Field Issue Communication; Substitution Requests; Submittal Review; Bulletin Issuance; Field Observation Reports; Punch List Creation and Review; and As-Built Document generation.
See the “DASD Minimum Consultant Design Requirements and Deliverables” for detailed information related to each Project Stage and Phase Deliverables, Documentation, Approval, and Phase Scope requirements.
2.2. City Agencies (Cleveland)
The Design-Builder shall consult in detail with the Director of the Mayor’s Office of Capital Projects (MOCAP) and/or his designee and carefully analyze any information furnished by the Owner concerning the specific requirements of the Project, including but not limited to, design, construction, scheduling, budgetary, or operational requirements, limitations, and objectives. The Division of Architecture and Site Development (DASD) will coordinate the project and will work closely with the Design-Builder in all phases of the development. The Design-Builder shall comply with all standards and directives established and issued by the Division of Architecture and Site Development. The City of Cleveland may retain an Owner’s Representative Team to perform functions of DASD as needed.
This facility is located within the corporate limits of Cleveland, Ohio and all work shall comply with all local, state and/or federal standards and ordinances and revised codes, including but not limited to Ohio Revised Code (O.R.C.) Chapter 153, as applicable to the scope of work. Compliance with these standards is mandatory by the Design-Builder and any resources needed to gain design compliance shall be borne by the Design-Builder.
3. Proposal Submission Requirements
3.1. COMPONENTS
Each Design-Builder shall electronically submit to the DASD two separate PDF files: one labelled Design-Build Services Proposal, and one labeled Design-Build Fee Proposal.
3.2. SERVICES PROPOSAL
Cover Letter (One page): Clearly indicate contact information, including phone and e-mail, for project primary contact individual.
Project Approach (One Page): The Design-Builder shall include a description how they plan to achieve the goals of this project, with specific descriptions of information gathering, evaluation, prioritization design, phasing, and documentation, and of their management, technical, and QA/QC approach taking into account the unique project goals and constraints. Include a specific and complete list of proposed deliverables. Describe the methods utilized to track work progress, budgets, and deadlines to maintain schedule and budget.
Organization of the Design-Build Team (up to Two pages): Include a description of the Design-Build Team, including the A-E professional services team and the construction team, including information regarding its primary business, its background and history, its organizational structure, QA/QC program, the number of employees, and commitment to diversity. This section should contain any additional information about the firm that the firm feels will assist in understanding the qualifications of the firm. It is required that there be a local component to the Design-Builder’s professional service team to facilitate response time to matters that require on-site reviews.
Project Team Qualifications (to Two Pages Each): Include a list of all key employees to be assigned or employed on the Project by the Design-Builder. The resume of each such person shall be included in the Qualifications. The Proposal shall also identify the person who will be the primary day-to-day contact and any alternate personnel assigned. The DASD requests that only resumes of key employees be included in the Proposal and should focus on highlighting their relevant qualifications and experiences that will most likely be comparable to work as detailed in this RFP.
Licensure and Liability (One Page): Design-Builder shall provide professional licenses for any and all members of the Project Team including design/engineering firms, certificates of current professional liability insurance, and any associations of which they hold membership. This may be included with the Qualifications.
Relevant Project Experience (One Page Each): Project sheets for completed relevant projects demonstrating ability to successfully lead and execute the type of work required for this project. Provide at least (3) completed municipal Design-Build project as reference as the construction general contractor, and as a design professional. Denote past partnerships between the contractor and the design professional team.
Capacity to Perform Work (One Page): Provide a description of the capacity to perform work requested by describing the Team’s current workload, including consideration for current City project workload, and the availability of the staff to meet required schedules. Identify projects underway by the proposed Design-Build Team including, in brief, the projects’ stage of development.
Special Commendations (Optional – up to Two Pages): The Design-Builder shall provide any other pertinent data, information and other extraordinary circumstances which will clearly demonstrate their unique ability to provide the required Professional Services in a manner not detailed previously within this RFP.
Proposed Project Schedule (One Page): Provide a conceptual Project Schedule including design through closeout indicating a proposed timeline for the performances of all Services of this RFP. The Design-Builder must be prepared to commence work immediately after the execution of a Contract for Professional Services. Include Client review time and expectations based on calendar day and weeks. See sample below and edit to the scope:
Start Date: May 3, 2027
Due Diligence – X Weeks
Programming – X Weeks
City Review – 2 Weeks
Concept Design – X Weeks
City Review – 2 Weeks
Schematic Design – X Weeks
City Review – 2 Weeks
Design Development – X Weeks
City Review – 2 Weeks
Design-Build Amendment
City Review and Processing – 16 Weeks
Construction Documents – X Weeks
Permitting – 6 Weeks
GMP Phase – X Weeks
Construction and Construction Administration – 52 Weeks Max
Closeout – X Weeks
Compliance Affidavit: Non-Competitive Bid Contract Statement for the current calendar year is enclosed. All Design-Builders submitting proposals for contracts awarded on or after January 1 of this year must submit a notarized affidavit for this year. If award of contract extends into subsequent years, then an updated form shall be required. Submit the Non-Competitive Bid Contract Statement with the fee proposal.
Northern Ireland Fair Employment Practices Disclosure: Interested Consultants shall complete and submit the Northern Ireland Fair Employment Practices Disclosure form as part of their proposal, included.
Certificate of Insurance: Submit a Certificate of Insurance form indicating limits of professional services (errors and omissions) and general liability coverage as a separate attachment to their Proposal, and shall at all times during the term of the contract resulting from this RFP, maintain the following insurance coverage:
The insurance company or companies providing the required insurance shall be authorized by the Ohio Department of Insurance to do business in Ohio and rated “A” or above by A. M. Best Company or equivalent. The Successful Proposer, as contractor, shall provide a copy of the policy or policies and any necessary endorsements, or a substitute for them satisfactory to and approved by the Director of Law, evidencing the required insurances upon execution of the contract.
Professional liability insurance with limits of not less than $1,000,000.00 for each occurrence and subject to a deductible for each occurrence of not more than $1,000,000.00 per occurrence and in the aggregate, and if not written on an occurrence basis, shall be maintained for not less than two (2) years after satisfactory completion and written acceptance of the services under the contract.
Workers’ compensation and employer’s general liability insurance as provided under the laws of the State of Ohio.
Statutory unemployment insurance protection for all of its employees.
Such other insurance coverage(s) as the City may reasonably require.
Certificate of Authorization or Certificate of Exemption: Submit a current “Certificate of Authorization” or a “Certificate of Exemption” to practice as a Professional in the State of Ohio issued by the State of Ohio, for each specified discipline: Architecture, Structural Engineering, Electrical Engineering, Mechanical Engineering, Civil Engineering and Landscape Architecture. Submit any other certifications, licenses, etc. to confirm professional competency in related services noted.
Construction Insurance and Bonding: Provide evidence of capacity to provide bonding in the amount of the Contract Sum, based on the estimated Construction Budget (e.g., a letter from its Surety or Sureties stating that the Proposer is eligible for the Performance Bond and Payment Bond for 100 percent of the estimated Contract Sum as required if the Proposer is selected), and a copy of the Proposer's certificate of insurance showing the Proposer's current limits of liability for commercial general liability, employer's liability, business automobile liability and professional liability. Failure of the Proposer to provide acceptable evidence of bonding capacity sufficient to complete the Project may result in disqualification of the Proposer and rejection of its Proposal.
3.3. FEE PROPOSAL
The Design-Build Fee Proposal shall be submitted as a separate pdf file in 8 1/2" × 11" format. Note that OEO schedules, which contain Design-Build Fee information, should be part of the Design-Build Fee Proposal and NOT part of the Design-Build Services Proposal. Content for this part of the Proposal Submission shall be organized as follows:
Compensation Fee and Cost Proposal Schedule: The Design-Builder’s proposal shall indicate the proposed fee for each Phase of service, shall include an appropriate amount for inclusive reimbursable expenses in each Phase, and shall indicate a total Lump Sum Fee broken down by Phase as follows:
PROFESSIONAL SERVICES
Phase A: Existing Conditions Verification: __________
Phase B: Program Verification and Preliminary Design: __________
Phase C: Technical Review and Schematic Design: __________
Phase G: Construction Documents: __________
Phase H: Permit Attainment: __________
Phase I: Construction Administration: __________
Phase J: Closeout: __________
Professional Services Subtotal (1+2+3+4+5+6+7): __________
Design Contingency (10% of 8): __________
SUBTOTAL I (8 + 9): __________
CONSTRUCTION
Construction Cost: ________________
Allowance 1: Project Sign: $1,500.00
Allowance 2: Testing: $5,000.00
Construction Subtotal (1+2+3): __________
Complete Construction Contingency (10% of 4): __________
SUBTOTAL II (4 + 5): __________
GRAND TOTAL FEE (SUBTOTAL I + SUBTOTAL II): __________
Permit Fees: Plan review fees and construction permit fees are waived by the City of Cleveland Building and Housing Department. All other permits, inspections and/or permits falling outside the City of Cleveland are not waived.
Contingency: The Contingency is eligible for use in performing Services necessary to complete the project as contemplated in this RFP but are unforeseen at the time of issuance of this RFP. Any change in Services to be paid from this Contingency shall be preceded by a Clarification, an itemized scope and fee breakdown provided by the Design-Builder, and a written determination by the Director’s designee. The Consultant’s cost for overhead, profit and other expenses contemplated for assessment against the Contingency are to be included in the Lump Sum Fee.
Modifications and Amendments: Contingency will be used to capture scope and services changes unless the value exceeds the contingency. Additional scope resulting in additional Consultant fees and/or changes in Project schedule shall not carry forward until given written approval through either memo, letter, notice to proceed, or other formal mechanism. Providing additional services without written request may forfeit the Consultants’ right to additional compensation or time. The Consultant errantly excluding terms of the RFP and its’ Exhibits will not be grounds for an additional service, extension, or additional compensation.
Reimbursable Expenses: Expenses are to be included within the Design fee and not a separate expense. Where Reimbursable expenses are considered above and beyond and approved by the Director, these shall be accounted for and reimbursed according to the City of Cleveland Professional Services Contracts Reimbursable Policy included in this RFP. The Consultant shall identify all items along with estimated costs for any reimbursable expenses required to complete for each Component of the project. This shall include, but is not limited to: deliveries, postage, printing, reproduction, geotechnical services, surveys, testing, fees, permits, special inspection fees and any other approved expenses usually associated with this type of project. Reimbursable expenses, including subconsultant fees, shall be billed at cost invoiced, without any mark-up. Costs for mileage, travel, parking, tolls, lodging, meals and dues/membership fees to professional societies/organizations are NOT eligible for reimbursement and will not be considered. No qualification of the financial offer will be accepted. Reimbursable Expense Allowance amounts not expended in a previous Component may only be carried over to subsequent Components after written approval.
Contractor Due Diligence Allowance: This is an allowance to allow the Contractor or a Subcontractor to perform destructive or nondestructive exploratory work as needed to assist the design Consultants. It should not be used to offset any design consultant Professional Services for which the fee is to be included under Professional Services.
Professional Services Fee Proposal: The Fee Proposal shall indicate the makeup of your proposed fee including hourly rates, direct costs, overhead, profit, and indirect expenses based upon the total estimated hours to be spent to provide the services.
Proposal shall include hourly rates inclusive of all direct cost, overhead, benefits, profit, and any indirect expenses. Hourly rates will not be adjusted during the contract period. If hourly rates are different for additional services or resident field supervision service, state so in the proposal. Interested parties shall submit their Fee Proposal in the following manner outlined below, with additional fee rates and rate structures as required by the Scope. Although Consultant proposed cost per hour are not the deciding factor in the selection of the Consultant, it will be evaluated with other criteria herein and submitted with the proposal.
Principal: $_____________ per hour.
Primary Staff: $_____________ per hour.
Administrative Support: $____________ per hour.
Although Consultants’ proposed fees are not the deciding factor in the selection of the Consultant, it will be evaluated with other criteria herein and submitted with the proposal.
Design-Builder Fee Proposal: Proposers shall submit their Design-Build fee as a percentage, inclusive of all labor, travel, expenses, overhead, profit, insurance and non-construction bonding, and other soft costs and fees unless otherwise stated. The proposed fee percentage shall be for the entire Project throughout all phases as defined in this RFP, including but not limited to preconstruction through construction close-out services. General Conditions and Construction Contingency are not to be included as part of this fee percentage. Fee Rates shall not be renegotiated during the course of the project or any phase.
Proposers shall clearly identify:
The proposed fee percentage through design
The proposed fee percentage through construction
The proposed fee percentage through close-out
The basis on which the fee is calculated
Any assumptions or exclusions associated with the fee
Proposal shall include hourly rates inclusive of all direct cost, overhead, benefits, profit, and any indirect expenses. Hourly rates will not be adjusted during the contract period. If hourly rates are different for additional services or resident field supervision service, state so in the proposal. Interested parties shall submit their Fee Proposal in the following manner outlined below, with additional fee rates and rate structures as required by the Scope. Although proposed cost per hour rates are not the deciding factor in the selection, it will be evaluated with other criteria herein and submitted with the proposal.
Superintendent: $_____________ per hour.
Construction Manager: $_____________ per hour.
Support: $__________________ per hour.
Although proposed fee rates are not the deciding factor in the selection, it will be evaluated with other criteria herein and submitted with the proposal.
The City reserves the right to negotiate the final fee and fee structure with the selected Design-Builder.
Equal Opportunity Documentation: Enclosed is the Mayor’s Office of Equal Opportunity Cleveland Area Business Code Notice to Bidders & Schedules. The Proposer must complete and sign each of the Schedules 1 through 4 as per the instructions. The Proposer must complete and sign each of the Schedules 1 through 4 as per the instructions.
Determination of a Good Faith Effort will be based on the Design Services fees only.
The successful Proposal will be required to submit Schedules 1 through 4 for the Construction Services portion of the contract prior to completion of Design Services and commencement of Construction Services.
If the Contractor does not believe it will be able to meet the goals below, the Contractor must submit a narrative of why it cannot meet the goals as part of this RFP response. The narrative should include any future Design and Construction Phases to allow the DASD to process the request with OEO.
The subcontracting goals for this design-build project are:
Design Services:
10% Certified CSB
Construction Services:
15% Certified MBE
7% Certified FBE
8% Certified CSB
Note that many certified MBE and FBE firms are also certified as CSBs. Proposers are strongly encouraged to utilize firms which are also MBE and/or FBE to fulfill the CSB goals in an effort to maximize community benefits for this project.
The Cleveland Area Business Code, Chapter 187 of the Codified Ordinances Cleveland, Ohio, 1976, is incorporated in and made part of the RFP, and any resulting contract by this reference, as fully as if attached. Refer to Exhibits. This document is also available at ClevelandOhio.gov/oeo.
Requirements: During performance of this Agreement, Contractor shall comply with all applicable requirements of the Cleveland Area Business Code, Chapter 187 of the Codified Ordinances of Cleveland, Ohio, 1976 (“C.O.”), and any Regulations promulgated under the Code. Specifically, compliance under any resulting agreement shall include, but not be limited to, the Contractor’s:
Compliance with its proposal representations regarding CSB, MBE, and/or FBE participation in performance of the Agreement;
Compliance and cooperation with Project Monitors, whether from the Mayor’s Office of Equal Opportunity (the “OEO”) or the contracting department;
Accurate, complete, and on-time submission of all reports, forms, and documents including, but not limited to, employment reports, certified payrolls, monitoring forms, and other information the Director of the OEO may require, whether in printed or electronic form, to ascertain and verify Contractor’s compliance; and
Attendance at and participation in all required project meetings, including OEO compliance meetings, and progress meetings called by the contracting department’s director(s) at key intervals during performance of the contract services.
Compliance Requirements:
Under the Cleveland Area Business Code, the City of Cleveland is firmly committed to assisting Minority Business Enterprises (MBEs), Female Business Enterprises (FBEs), and Cleveland – area Small Businesses (CSBs) by providing and enhancing economic opportunities to participate in City contracts. The successful Proposer for a contract will be a firm that shares that commitment. Accordingly, a Proposer is strongly encouraged to utilize the services of qualified MBE/FBE/CSB sub-consultants that are certified by the Mayor’s Office of Equal Opportunity (the “OEO”) in its proposal.
Please review the attached Office of Equal Opportunity documents to ascertain the goal for the proposed contract. Proposers are required to make a good-faith effort to subcontract portions of the work to certified Minority Business Enterprise (“MBE”), Female Business Enterprise (“FBE”), and Cleveland – area Small Businesses (CSB) firms, consistent with the subcontracting goal(s) applicable to this RFP.
To document its good-faith effort to utilize certified MBE, FBE and CSB sub-consultants, each proposer must complete Schedules 1 through 4 found in the Cleveland Area Business Code – Notice to Bidders and Schedules. These schedules identify the Proposer’s proposed use of MBE, FBE and CSB sub-consultants on the project, which evidences the proposer’s good-faith effort to obtain the participation of certified sub-consultants. The Proposer shall submit the completed forms with its proposal and they will be forwarded to the City’s Office of Equal Opportunity for evaluation. Failure to submit complete schedules may result in the rejection of a proposal. Proposers who do not make a good faith effort to meet the participation goal mentioned previously will not be considered “responsive.”
Proposers may obtain a listing of firms certified by the OEO as CSBs, MBEs and FBEs by checking the City’s website at ClevelandOhio.Gov/oeo. On the Office of Equal Opportunity page, you will find a selection in the right-hand column for “B2Gnow Certification Registry.”
Proposers are responsible for obtaining the most current list and for contacting potential CSB/MBE/FBE sub-consultants. The City assumes no responsibility for matching prime consultants with qualified, certified MBE, FBE, and/or CSB sub-consultants.
The City Office of Equal Opportunity will monitor participation of MBE, FBE, and/or CSB sub-consultants throughout the duration of the engagement or project. The successful proposer, as contractor, will be responsible for providing the OEO with all information necessary to facilitate this monitoring.
Failure to Comply: When determining the Contractor’s future eligibility for a City contract, the City shall consider a Contractor’s failure to comply with the representations of its proposal and the requirements under the Code as a failure to faithfully perform a contract.
Consultants and Roles: Provide the applicable Consultants’ consulting firm, indicated as “City,” or state “N/A” if deemed not applicable. Add additional disciplines or roles. Do not remove the discipline when not applicable.
DISCIPLINE
CONSULTANT, CITY, OR N/A
Civil
Consultant
Surveyor
Consultant
Landscape
Consultant
Architecture
Consultant
Interior Design
Consultant
Structural
Consultant
Mechanical
Consultant
Plumbing
Consultant
Pool Specialist
Consultant
Electrical
Consultant
Telecomm/ IT
Consultant
Fire Suppression
Consultant
Fire Alarm
Consultant
Food Service
Consultant
Facility Condition Assessor
Consultant
Where delegated design type work is integral to the scope of service, the consulting AOR or EOR is expected to provide concise design criteria for the Design-Builder which includes plans, design criteria specifications, narratives, and other information. All delegated design is to be accounted in the construction cost including Consultant fees as determined between the Design-Build Contractor, its’ Consultants, and its’ subcontractors.
Along with the Fee Schedule, provide the total attained sub consulting and subcontracting goals in the following format:
DESIGN SERVICES
Certified CSB
XX%
CONSTRUCTION SERVICES
Certified MBE
Anticipated XX%
Certified FBE
Anticipated XX%
Certified CSB
Anticipated XX%
3.4. Organization of Proposal
The Proposer should carefully read all instructions and requirements and furnish all information requested. If a Proposal does not comply with all terms, conditions, and requirements for submittal, the City may consider it unacceptable and may reject it without further consideration. Marketing documents, such as brochures, advertisements, etc. shall not be permitted.
3.5. The City’s Right and Requirements
The Director, at his/her sole discretion, may require any Proposer to augment or supplement its proposal or to meet with the City’s designated representatives for interview or presentation to further describe the Proposer’s qualifications and capabilities. The requested information, interview, meeting, or presentation shall be submitted or conducted, as appropriate, at a time and place the Director specifies.
Furthermore, the City reserves the right to modify the scope of services at any time before execution of a contract to add, delete, or otherwise amend any item(s), as it deems necessary, in its sole judgment, and in the best interests of the City.
The City reserves the right, at its sole discretion, to reject any proposal that is incomplete or unresponsive to the requests or requirements of this RFP. The City reserves the right to reject any or all proposals and to waive and accept any informality or discrepancy in the proposal or the process as may be in the City’s best interests.
3.6. Proposal as a Public Record
Under the laws of the State of Ohio, all parts of a proposal, other than trade secret or proprietary information and the fee proposal may be considered a public record which, if properly requested, the City must make available to the requester for inspection and copying. Therefore, to protect trade secret or proprietary information, the Proposer should clearly mark each page - but only that page - of its proposal that contains that information. The City will notify the proposer if such information in its proposal is requested, but cannot, however, guarantee the confidentiality of any proprietary or otherwise sensitive information in or with the proposal. Blanket marking of the entire proposal as “proprietary” or “trade secret” will not protect an entire proposal and is not acceptable.
4. Other Conditions and Information
4.1. Formats for Deliverables
All deliverables for all Components shall be submitted in native software formats (e.g.: “~.pdf” AND “~.dwg” AutoCAD® for Drawing files; “~.pdf” AND “~.shp” ESRI® Shapefiles AND “~.gdb” ESRI® Geodatabases AND “~.mxd” and/or “~.aprx” ESRI® maps/projects AND Microsoft Word® “~.doc” for Specification files and Meeting Minutes; “~.pdf” AND Microsoft Project® for Project Schedules; “~.pdf” AND “~.xls” for cost estimates) via electronic download at the end of each Component as Record Deliverables. Files may be compressed in a “~.zip” file format.
4.2. Standard of Care
The standard of care of the services provided by the Consultant shall meet or exceed that level commonly expected of professional architects and engineers licensed to practice in the State of Ohio. The Consultant shall assume the role of state of Ohio licensed “Architect-of-Record,” “Engineer-of-Record,” and/or “Designer-of-Record” as applicable for all work performed under the contract. All documents requiring permits for the work performed under the contract shall bear a current, active professional seal recognized and as required by the State of Ohio.
The Design-Builder shall assume the role of Design-Builder for all work performed under the contract and all entities that comprise the Design-Build team shall be licensed in the State of Ohio as required. All documents for the work performed under the contract shall bear a current, active professional seal recognized and as required by the State of Ohio.
Where delegated design type work is part of the scope of service that delegated design (unless specifically called out by the City) must be as part of the Design-Builder’s scope and fee. Including any A-E sealed drawings, permitting, coordination, and other requirements.
Upon request, the Design-Builder shall make field observations and conduct investigations, as required, to evaluate existing conditions during all Stages. Through the services of a sub-Consultant the Design-Builder shall provide environmental assessment services to determine the extent and impact of the presence of hazardous materials within a project area. Individuals performing these services must be fully licensed to perform the services needed and shall work with the Design-Builder and the DASD to prepare scopes of work and cost estimates for remediation work.
4.3. Meeting Minutes
The Design-Builder (or designated Consultant) shall record and issue meeting minutes for all meetings, conferences, and conference calls attended by the Design-builder to all attendees. The designated entity is responsible for distribution and follow-up related to its’ sub-consultants and the City for action items, requested information, RFIs, schedules, and other Project updates.
The Design-Builder shall attend and participate in project meetings with various City departments/divisions and/or public meetings as required during all Stages and Phases.
4.4. Project Schedule
Design-Builder shall submit within ten (10) calendar days after the award and/or execution of the Contract a Project Schedule which shall include:
Proposed duration of each Phase in calendar days.
Milestone dates including submittal review periods which incorporate Consulate QAQC periods.
Allowance for reasonable time required for all reviews/approvals by all authorities including (3) weeks for City Design reviews.
Allowance for bid and permit time, assuming 60 days for bidding and 45 days for permit.
Allowance for a general Construction timeframe.
The Design-Builder shall produce, maintain, update biweekly, and submit the Project Schedule at each Stage and Phase of the project, or as requested by the City or the Owner’s Representative Team. The Design-Builder and its’ Consultant(s) is responsible for coordination and QAQC of its’ disciplines and related Contract Documents, as well as assurance of staffing availability to meet project goals and deadlines.
A full Gantt construction schedule with milestones and critical path shall be submitted within ten (10) calendar days of mobilization of construction activities. The Design-Builder shall produce, maintain, update biweekly, and submit the Project Schedule at each Stage and Phase of the project, or as requested by the City or the Owner’s Representative Team.
4.5. Management of the Budget
The Design-Builder shall be responsible for managing the Project Budget, and shall, during each Stage per the Scope of Design-Build Services described in this RFP:
Provide Cost Estimates which break down cost by work area and/or system, and then organize in CSI format appropriate to the level of project completion in Microsoft Excel, formatted for 8-1/2” x 11 paper.
Review the Project Scope and Budget with the City and/or the Owner’s Representative Team and provide back-up documentation.
Adjust the Project Scope and modify documents as necessary to ensure alignment of Project Scope with the Project Budget.
The Contracting Authority and/or Owner shall have access to all books, records, documents and other data in the D-B's possession related to itself, its subcontractors and material suppliers pertaining to bidding, pricing or performance of the Agreement. The City shall not consider any Stage or Phase of the Design-Build Services as complete, nor authorize the continuation of the Design-Builder’s Services, until satisfied that the Project Scope as defined in the Contract Documents can be achieved within the Project Budget.
4.6. Unbalanced Bid
The City may reject a bid as nonresponsive if the prices bid are materially unbalanced between line items or subline items. A bid is materially unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated in relation to cost for other work, and if there is a reasonable doubt that the bid will result in the lowest overall cost to the City even though it may be the low evaluated bid, or if it is so unbalanced as to be tantamount to allowing an advance payment.
4.7. Electronic Management of the Project
The Design-Builder shall be responsible for managing the Project through an electronic, online, cloud-based construction management tool such as Procore. At a minimum, the tool shall manage schedules, RFIs, Submittals, electronic drawing record(s), as-built drawings, and operations and maintenance documentation.
4.8. Design-Build Professional Services Payments
Payments for Professional Services shall be made in accordance with the Consultant’s Proposed Fee. Herein, “Phase,” “Scope Item,” “Component,” ”Service,” or related nomenclature are generally the same. Consultant shall be responsible for management of the Professional Services Fee as follows.
Requests for Payment, to include (provide sample for City approval) at a minimum:
Fee Breakdown by Stage and Phase per Proposal. Including retaining and contingency as separate line items.
Total fees by Phase, Percent Complete, Amount Earned, Previous Fee Billing, and Current Billing by Component. With associated subtotals below.
Reimbursable Expenses by Phase, broken down by Current, Prior, and Billed-to-Date.
Contingency, when used, broken out by each approved contingency scope item indicating Total Fee, Percent Complete, Amount Earned, Previous Fee Billing, and Current Billing.
Amendments and Modifications beyond contingency, when needed, broken out into phases similar to b above.
City’s internal Project # and Contract #.
Only when hourly or if requested for auditing, staff logs/hours expended by phase requested. Do not provide if not Hourly Time and Expense.
A-E Consultant’s fees shall be separate from Contractor pay applications but are to be invoiced under the AIA G742 Design-Builder to Owner – or approved equal - format.
Consultant shall provide an invoice schedule within (10) calendar days of the accepted Project Schedule for review of all phases. The invoice schedule does not need minutely updated unless major adjustments are needed.
Requests for Payment shall be submitted on a monthly basis, based on current progress, including reimbursable expenses, for each Phase. A current progress set or documentation may be requested for justification.
Final payment will be made only when all record and project close-out documents have been accepted by the City as complete.
Any portions of Fees or Reimbursable Allowances not utilized for any Phase may only be utilized in later Phase or Scope with prior written authorization by the City.
Payments may not exceed 90% of each Stage or Phase until the Phase or Stage is satisfactorily completed and accepted by the City. Final payment will be made only when all record and project close-out documents have been accepted by the City as complete. Any portions of Fees or Allowances not utilized for any Stage or Phase may only be utilized in later Stages or Phases with prior written authorization by the City.
4.9. Design-Build Construction Services Payments
Design-Builder shall be responsible for management of the Construction Services Fee as follows:
Application and Certification for Payment similar to AIA G742 Design-Builder to Owner (provide sample for City approval).
Detailed Breakdown similar to AIA G743.
Breakout of Retainage. See Front Ends for requirements.
Breakout of Contingency and Allowances.
Updated Construction Schedule.
Payments may not exceed 90% of each Stage or Phase until the Phase or Stage is satisfactorily completed and accepted by the City. Final payment will be made only when all record and project close-out documents have been accepted by the City as complete. Any portions of Fees or Reimbursable Allowances not utilized for any Stage or Phase may only be utilized in later Stages or Phases with prior written authorization by the City.
Where there are multiple facilities with different postal addresses or facility identification numbers under the same Construction Contract, a separate payment application is required for each facility. Substantial Completion, including retainage release, will occur for each facility based on the Contractor’s construction schedule.
Professional services fee are to be separate from Construction payments. Professional services related to delegated design during Construction under the Design-Build contractor are not required to be separated nor enumerated.
4.10. Composition of Design-Build Team
While it is the responsibility of the proposers to determine the composition of their team, it is anticipated that the Design-Build team may include but not limited to:
Design-Builder
Architecture/Engineering
Environmental/Hazardous Material Design-Builder
It is the prime consultant’s responsibility to determine the subconsultants/subcontractors required to complete this project.
4.11. As-Built and Closeout Documents
As-Built documents, including PDF drawings sets, CAD X-ref backgrounds and sheets, Revit models, OEM manuals and other pertinent closeout documents shall be sent electronically to the DASD within 30 days of the statement of Work Acceptance. No legal limitations shall be imposed for current nor future use by the City of Cleveland and its consultants.
4.12. Costs Incurred
The City is not liable for any costs incurred by any responding firms before execution of a contract and issuance of written Notice to Proceed.
4.13. Economy of Preparation
Proposals should be prepared simply and economically in 8-1/2" × 11" vertical format, providing straightforward, concise descriptions and information. Company brochures and marketing materials will not be accepted.
4.14. Agreement
The successful Design-Build Team shall be required to execute an agreement substantially in the form of the Sample Agreement and as amended to incorporate the full range of Design-Build services described in this RFP. Where a conflict arises between the terms and conditions of the RFP and the Design-Build Contract then the terms and conditions of the RFP shall prevail, unless specifically addressed in the Design-Build Services Contract.
4.15. Mailing List and Notifications
Mailing List is NOT exclusive. Qualified firms not on the list are encouraged to submit proposals for consideration and/or participate as team members. All interested firms not included on the list please notify Mr. Mark Duluk, AIA, Manager, DASD and Brian Avery, AIA, Section Chief of Architecture DASD, in writing (via e-mail to mduluk@clevelandohio.gov and bavery@clevelandohio.gov).
4.16. Action Steps and Ownership of Work Products
The City reserves the right to contract for the performance of certain Stages or Phases, and delay or terminate future Phases pending the outcome of the design and cost estimation work. Furthermore, the City reserves the right to award a contract for all Phases of the project, yet terminate the project at any time, upon written notice to the Design-Builder and making payment for all satisfactory services rendered to date of termination. All deliverables shall become the property of the City for use or distribution as it sees fit without limitations from the Design-Builder, other than usual disclaimers for reliance of accuracy of use of another person’s work product.
4.17. Site Review and On-site Questions
It is the responsibility of the Design-Builder to be fully acquainted with the existing conditions of the project by conducting visual inspections and site visit(s) prior to proposal submission. These visits are for observation only. No discussions on-site shall be deemed official. All questions must be submitted in writing and will be responded to within an addendum to this RFP.
4.18. Public Improvement Projects over $500k
The successful bidder, and all of the bidder’s contractors and subcontractors, shall comply with and adhere to the project labor agreement (PLA) for this project, which is attached as an Exhibit to these documents. As part of the bid submission, the bidder shall attach an executed copy of Exhibit C of the PLA “Acknowledgment of Assent to the Project Labor Agreement." The City of Cleveland shall not enter into any contract with the successful bidder unless the contract contains a provision requiring the successful bidder and all of its contractors and subcontractors to comply with and adhere to the PLA. The bidder acknowledges this requirement by submitting this bid application with the executed “Acknowledgment of Assent form.”
5. OEO Compliance
CSB, MBE, or FBE Proposals for Professional Services Contracts
Definitions: Unless defined in this paragraph or elsewhere in this solicitation of proposals, the following terms shall have the meaning(s) given them in the Cleveland Area Business Code, Chapter 187 of the Codified Ordinances of Cleveland, Ohio, 1976.
“City of Cleveland Small Business” or “CCSB.”
“Cleveland Area Small Business” or “CSB.”
“Cleveland Area Business Code” or “CAB Code.”
“Female Business Enterprise” or “FBE.”
“Minority Business Enterprise” or “MBE.”
“Office of Equal Opportunity” or “OEO.”
“Proposal” means an offer to contract with the City in response to this solicitation of proposals (whether called a “Request for Proposals,” “Request for Quotes,” or otherwise) for a personal (“professional”) services Contract.
“Proposer” means a Person submitting a Proposal to the City.
“Regional Cleveland Area Small Business” or “RCSB.”
Evaluation Credit: For the purpose of comparing competing Proposals only, the City’s contracting department may apply an Evaluation Credit of five percent (5%) of the total points awarded for a Proposal received from a CSB, MBE, or FBE. The contracting department shall apply evaluation credit according to the following criteria:
Where the City has evidence demonstrating past or present discrimination as to participation of MBEs or FBEs in specific types and categories of contracts, a contracting department may apply evaluation credit to a Proposal when the Proposer is a type of MBE or FBE, and proposing to participate in a type and category of contract, for which discrimination has been demonstrated. If a contracting department applies evaluation credit to one or more proposals from a MBE or FBE for a contract, it may not apply evaluation credit to any proposal from a CSB under review for award of that contract.
If the City has no discrimination evidence described in paragraph 1 above permitting it to apply evaluation credit, a contracting department may apply evaluation credit to the proposal of any CSB(s) where the CSB has its principal office physically located within Cleveland’s municipal boundaries (a “CCSB”). If it does, no other proposer shall receive such evaluation credit.
If the City has no discrimination evidence described in paragraph 1 above permitting it to apply evaluation credit and no proposal from a CCSB, a contracting department may apply evaluation credit to the proposal of a CSB having its principal office physically located outside Cleveland’s municipal boundaries but within Cuyahoga County’s boundaries (a “RCSB”).
Procedure: The contracting department may use the total points awarded for a proposal after applying evaluation credit to compare competing proposals to determine which proposal to recommend for a contract award. The City may use the evaluation of a proposal determined after applying evaluation credit to approve that proposal for a contract award. The application of evaluation credits shall not alter the contract amount of a proposal submitted by a proposer, or of the contract executed based on the proposal.
Proposer’s Good-Faith Effort: Each proposer shall make and document its good-faith efforts to meet any CSB, MBE, and FBE goal that applies to the contract for which it is submitting a proposal. The City may consider a proposer’s good-faith efforts to meet or exceed CSB, MBE, and/or FBE subcontractor participation goals set by the Director of the Office of Equal Opportunity for the contract in recommending and approving a proposal for contract award.
“Good-faith effort” as used in this solicitation and any resulting contract shall mean and include, without limitation, the proposer’s:
Active efforts to obtain participation in the contract from CSBs, MBEs, and/or FBEs equal to or exceeding the specific goal(s) set for the contract;
Completion and submission in association with its proposal, as required, all reports, forms, and documents, including, but not limited to, employment reports, certified payrolls, and other information that the Director of the OEO may need to ascertain and verify the specific practical steps the proposer has taken or is taking to meet or exceed the CSB, MBE, and FBE goal(s) for the contract, and the proposer’s equal employment practices; and
Attendance at and participation in all required pre-contract award meetings.
The Director of the OEO may determine a proposer’s good-faith efforts regarding proposed CSB, MBE, and FBE participation in the contract and its employment practices, as provided under the Cleveland Area Business Code, from the proposer’s documentation and actions, information obtained from other sources, and monitoring by the OEO, as applicable.
Incorporation of Cleveland Area Business Code; OEO Notice to Bidders & Schedules: The Cleveland Area Business Code, Chapter 187 of the Codified Ordinances Cleveland, Ohio, 1976, and the OEO Notice to Bidders & Schedules are incorporated in and made part of this solicitation and any resulting contract by this reference, as fully as if attached.
6. Proposal Selection Criteria
Interviews
Based on preliminary scoring of point-based items described above the City may create a short list of Design-Build Teams and conduct interviews as warranted. Further instruction will be provided to the short listed Teams when notified of the forthcoming interview.
Proposal Acceptance
The City reserves the right to accept proposals, in whole or in part, to reject any or all proposals or portions thereof, to waive irregularities, informalities, and technicalities, to re-issue or to proceed to obtain the services(s) desired otherwise, and to negotiate separately, as necessary, to serve the best interest of the City of Cleveland. The Director may, at his sole discretion, modify or amend any provision of this notice, or the RFP. Firms whose proposals are not accepted will be notified in writing. For this Request for Proposal, the proposal must remain valid for 180 days after submission.
1. Quality of Proposal
Quality of Proposal includes Organization of the Team, Specific Approach to this Project, Ability to Perform the Scope of Services, Capacity to Perform Work, including consideration for current City project workload, Special Commendations as defined in the “Proposal Submission Requirements,” and general quality and organization of the proposal itself.
Scoring Method:
Points Based
Weight (Points):
15 (15% of Total)
2. Credentials of Key Personnel
Credentials of Key Personnel including qualifications and experience of the Project Team, particularly the project manager, superintendent, and construction general contractor who will be the lead person on this project, and their prior experience and demonstrated ability to perform the scope of work. Call attention to projects with the same delivery method. Call attention to project experience under the individual personnel listed with same delivery method, same project type, or other specialized project experience relevant to this project. Provide a clearly delineated organizational chart with POC(s).
Scoring Method:
Points Based
Weight (Points):
25 (25% of Total)
3. Demonstrated Ability
Demonstrated Company history of successful relevant projects to meet proposed schedules and budgets. Call attention to projects with same delivery method, same project type, or other special project similarities relevant to this project.
Scoring Method:
Points Based
Weight (Points):
20 (20% of Total)
4. Proposed Schedule
Proposed Schedule to complete the work. Ensure entire dates are visible. Use a simplified format for ease of review.
Scoring Method:
Points Based
Weight (Points):
10 (10% of Total)
5. Compensation / Fee
Score based on the cost proposals, rates, and other fee-based metrics. This item will be reviewed after the evaluations of qualifications have been completed.
Scoring Method:
Points Based
Weight (Points):
10 (10% of Total)
6. OEO Compliance
In Accordance with the City’s goal of increasing the level of certified Cleveland Small Business, Minority Business Enterprise, and Female Business Enterprise participation in City contracts, the Consultant shall strive to meet the following subconsultant/ subcontractor participation goals:
SEE THE PROPOSAL SUBMISSION REQUIREMENTS for the Design (professional architecture, engineering, and preconstruction services) and Construction goals.
IMPORTANT NOTE: Submissions evaluated as “non-responsive” and/or “not making a good faith effort” will be eliminated from further consideration.
See “OEO Compliance” for additional information.
Scoring Method:
Points Based
Weight (Points):
20 (20% of Total)
7. Proposal Submittals
1. Design-Build Services Proposal*
Provide a PDF with the filename in the following format: "FIRM NAME PROJECT NAME Services Proposal YYYY.MM.DD"
*Response required
2. Design-Build Fee Proposal*
Provide a PDF with the filename in the following format: "FIRM NAME PROJECT NAME Fee Proposal YYYY.MM.DD"
*Response required
3. Compensation Fee and Cost Proposal Schedule*
Provide a separate "Compensation Fee and Cost Proposal Schedule" followed by "Alternates" and "Unit Prices" if applicable (as requested under "Proposal Submission Requirements") for ease of reference and review. The schedule should remain as part of the "Fee Proposal" documentation as well.
All three (3) items should be in a single PDF. Provide a PDF with the filename in the following format: "FIRM Fee Schedule YYYY.MM.DD"
*Response required
4. Proposed Project Schedule*
Provide a separate "Proposed Project Schedule" (as requested under "Proposal Submission Requirements") for ease of reference and review. The schedule should remain as part of the "services proposal" documentation as well.
Provide a PDF with the filename in the following format: "FIRM Schedule YYYY.MM.DD"
*Response required
5. City Required Forms
5.1. Notice to Bidders and OEO Schedules*
Please download the below documents, complete, and upload. COMBINE ALL FOUR SCHEDULES INTO A SINGLE PDF. Provide a PDF with the filename in the following format: "FIRM NAME PROJECT NAME OEO Schedules"
NOTICE_TO_BIDDERS_AND_OEO_SCHEDULES_(1).pdf
*Response required
5.2. Non-Competitive Bid Contract Statement for Current Year*
Please download the below documents, complete, and upload. Provide a PDF with the filename in the following format: "FIRM NAME Non Comp YYYY"
Non_Comp_2026b.pdf
*Response required
5.3. Affidavit*
Please download the below documents, complete, and upload. Provide a PDF with the filename in the following format: "FIRM Affidavit"
AFFIDAVIT_(2).pdf
*Response required
5.4. Federal Form W-9*
Provide a PDF with the filename in the following format: "FIRM W9"
W9_blank.pdf
*Response required
5.5. Insurance and Bond*
Provide COI, Liability Insurance, All-Risk Insurance, and Bid Bond letters, or the proof of ability to be insured. Name the City of Cleveland as insured. If the exact policy(ies) cannot be attained at the time of RFP, provide a letter from the insurer that the entity will be able to attain such insurance and bond.
Provide PDFs with the filename in the following format: "FIRM COI," "FIRM COI Risk," and "FIRM BID BOND."
*Response required
5.6. Ohio BWC*
Provide current Ohio Bureau of Workman's Comp form(s).
Provide a PDF with the filename in the following format: "FIRM BWC."
*Response required
6. Northern Ireland Fair Employment Practices Disclosure
INSTRUCTIONS: Pursuant to Codified Ordinance Sec. 181.36, the information requested on this page must be supplied by all contractors and any subcontractors having more than a fifty percent (50%) interest in the proposed contract prior to any contract being awarded by the City of Cleveland. Any contractor or subcontractor who is deemed to have made a false statement shall be declared to have acted in default of its contract and shall be subject to the remedies for default contained in its contract. For failure to cure such a default, the contractor or subcontractor shall be automatically excluded from bidding for the supply of any goods or services for use by the City for a period of two (2) years.
6.1. CHECK WHICHEVER IS APPLICABLE*
Select all that apply
The undersigned or any controlling shareholder,* subsidiary, or parent corporation of the undersigned is NOT ENGAGED IN ANY BUSINESS OR TRADING FOR PROFIT IN NORTHERN IRELAND. (if paragraph A. is checked, proceed to the signature line.)
The undersigned or any controlling shareholder,* subsidiary, or parent corporation IS ENGAGED IN ANY BUSINESS OR TRADING FOR PROFIT IN NORTHERN IRELAND. (if paragraph B. is checked, please either check the stipulation contained in paragraph C. or attach documentation that shows that the undersigned has complied with the stipulation contained in paragraph C.)
The undersigned and all enterprises identified in paragraph B. are TAKING LAWFUL AND GOOD FAITH STEPS TO ENGAGE IN FAIR EMPLOYMENT PRACTICES WHICH ARE RELEVANT TO THE STANDARDS EMBODIED IN THE "MacBRIDE PRINCIPLES FOR FAIR EMPLOYMENT IN NORTHERN IRELAND." A copy of the MacBride Principles can be obtained from the Office of the Commissioner of Purchases and Supplies. In lieu of checking this paragraph, the undersigned must attach documentation which the undersigned believes shows compliance with the stipulation contained in this paragraph C.
*Response required
6.2. By confirming, the proposer affirms that they are in compliant Northern Ireland Fair Employment Practices.*
Please confirm
*Response required
6.3. Northern Ireland - Proof of Compliance for Option 2 and/or Option 3*
Provide a PDF with the filename in the following format: "FIRM Northern Ireland"
*Response required
7. Bid RFIs and Addendums
7.1. Confirm you have received, reviewed, accepted, and incorporated all RFP RFIs, questions, and answers.*
If applicable. State "yes" even if there were no RFIs or questions.
Yes
No
*Response required
7.2. Confirm you have received, reviewed, accepted, and incorporated all Addendums?.*
If applicable. State "yes" even if there were no Addendums.
Yes
No
*Response required
8. PLA Acknowledgment
8.1. Public Improvements Project Exhibit
If $500k and over, please download the project specific PLA Document below, complete, and upload.
PLA_22_Arch_Redacted.pdf
8.2. Public Improvements PLA
Provide an Executed and signed Exhibit. Provide a PDF with the filename in the following format: "FIRM PLA"
8. Attachments
A - 01 NORTHERN IRELAND DISCLOSURE
B - 02 CCO 187-22
C - 03 Subcontractor Addition and Subtraction Policy
D - 04 DASD Minimum Deliverables (2026.06.04)
E - 05B Design-Build Agreement Sample for MOCAP
F - 06 2023 Reimbursables_Policy
G - 07 Cleveland City-Wide Asbestos Policy (2017.05.19)
H - 08 City of Cleveland Sustainable Building Policy 2013-04
I - 09 017419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
J - 10 FORM CWM-7 DEMOLITION WASTE
K - 11 FORM CWM-8 CONSTRUCTION WASTE
L - 12 PART B - General Conditions (final 8-28-25) - Shortcut
M - 13 PART C - SUPPLEMENTAL GENERAL CONDITIONS__2025_09_16
N - 14 PW NOTICE -Valerie Harvey (2024.12.27)
O - 15 Prev Wage Notification (2024.12.27)
P - 16 PW CONTRACTOR RESPONSIBILITY - OHIO (2024.12.27)
Q - 17 PW NOTIFICATION TO EMPLOYEE - OHIO (2024.12.27)
R - 18 PW AFFIDAVIT OF COMPLIANCE - OHIO (2024.12.27)
S - 19 PW THRESHOLD LEVELS - OHIO (2024.01.01)
T - 20 PW INSTRUCTIONS FOR PREPARING CERTIFIED REPORTS - OHIO (2024.12.27)
U - 21 PW CERTIFIED PAYROLL REPORT - OHIO (2024.12.27)
V - 22 PW RATES - COVER LETTER (2024.12.27)
W - 23 Wage Theft PDF Version
X - 24 RFP MAILING LIST - DB 2026 08 27
Y - 25 Westpark Cemetery Existing Conditions Survey 2025-03-25
Z - 26 Criteria Drawings and Narratives