The New York State Canal Corporation (hereafter, the "CANAL" and/or "NYSCC") a Subsidiary of the New York Power Authority (hereafter, "NYPA" and/or "The Authority") is seeking quali?ed ?rms to provide Waste Oil System Removal, Replacement, and Installation. This project shall include but not be limited to delivery of Waste Oil System Removal, Replacement, and Installation. A description of the required Equipment and supporting services and details are located in the RFP on NYPA’s Ariba platform.
Proposers are hereby directed to use NYPA’s website (www.nypa.gov) to obtain
complete bid documents, bid addenda, post bid-addenda, and related notices within the NYPA Ariba network. NOTE: The link listed under procurement opportunities on the Canal website will re-direct you to NYPA’s website where the documents are
located. Proposers obtaining bid documents from sources other than the Authority’s website at www.nypa.gov do so at their own risk. Incomplete proposal responses maybe rejected.
The Vendor shall furnish all labor, supervision, equipment, materials, transportation, testing, temporary controls, and incidentals necessary to remove and replace the waste-oil systems. The work includes removal of each shop's existing 285-gallon waste-oil tank, tote, pump, and associated accessories; removal and off-site management of remaining waste oil, sludge, and wastewater; installation of a new 285 or 500 gallon Fire Hopper waste-oil tank and associated collection equipment; installation of a new 135-gallon tote, rolling portable tote, transfer pump, high-level monitoring and shutoff system, piping, hoses, conduit, and appurtenances; system testing; staff familiarization; and final documentation. The project will be divided into three phases: Phase 1 (Pre-Work Planning and System Procurement), Phase 2 (Removal of Existing Waste-Oil System), and Phase 3 (Installation, Testing, and Closeout).
We post new environmental & testing services opportunities in New York as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most New York work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: New York Power Authority (solicitation 6673), retrieved via the rfp.nypa.gov solicitations API. View the official posting, and always confirm requirements and deadlines with the issuing agency.