This work shall include furnishing all labor, material, and equipment to complete the project WATER SERVICE REPLACEMENTS – ENDORA WAY as described in the specifications and shown in the plans. Work includes removals of existing 5/8” – 1” water services, relocation of existing service lines as needed to attain 4’ separation between water and sewer laterals and make the service line perpendicular to the water main, connection to existing or relocated corporation stop at the main with a brass adapter, and installation of new copper water service (size to match existing) from the main to the meter for 30 water services within Boulder City. This work shall also include installation and/or replacement of one 2” blow-off,
water meters, meter boxes, and/or Encoder Receiver Transmitter modules (ERTs) for locations specified (these items will be supplied by the City). This project shall include asphalt replacements.
The work includes furnishing all labor, material, and equipment to complete the project WATER SERVICE REPLACEMENTS – ENDORA WAY. It includes removals of existing 5/8” – 1” water services, relocation of existing service lines as needed to attain 4’ separation between water and sewer laterals and make the service line perpendicular to the water main, connection to existing or relocated corporation stop at the main with a brass adapter, and installation of new copper water service (size to match existing) from the main to the meter for 30 water services within Boulder City. The work also includes installation and/or replacement of one 2” blow-off, water meters, meter boxes, and/or Encoder Receiver Transmitter modules (ERTs) for locations specified (these items will be supplied by the City). The project includes asphalt replacements.
We post new plumbing opportunities in Nevada as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Nevada work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Boulder City, Nevada (solicitation 20865), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.