We'll email you new electrical opportunities in Nevada as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
Truckee Meadows Water Authority (TMWA) is accepting sealed bids for all labor, materials, equipment, and incidentals required to (1) modify and replace the existing 480V, 300A motor control center (MCC) main section with a new 600A MCC main section at the Decant Building; (2) replace existing 25 kV load-break elbows within existing transformers, switches, and underground vaults; (3) replace existing fault indicators within existing transformers, switch, and underground vaults; and (4) install concrete aprons at various underground vault locations.
Please see the Activities tab for details regarding the optional pre-bid meeting and site visit.
All content viewed and/or downloaded is considered confidential information and shall be used by the Recipient solely for the purpose of evaluating and potentially submitting a bid for the Project, and not in any way detrimental to TMWA. Recipient shall not copy or otherwise reproduce any confidential information and may not distribute any information to any third-party that is not necessary for purposes of evaluating and submitting a bid for the Project.
The Engineer's estimate is: $99,000 - $121,000
This Project is deemed a **Horizontal **Construction Project.
Modify and replace the existing 480V, 300A motor control center main section with a new 600A MCC main section at the Decant Building, replace existing 25 kV load-break elbows within existing transformers, switches and underground vaults, replace existing fault indicators within existing transformers, switch and underground vaults, and install concrete aprons at various underground vault locations.
Most Nevada work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Truckee Meadows Water Authority (solicitation 20474), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.