The New Hampshire Department of Environmental Services (NHDES), Winnipesaukee River Basin Program (WRBP) owns and operates the regional Wastewater Collection and Treatment System. The WRBP is soliciting proposals to replace the ballast roofing at four of our systems pump stations as described below and in Exbibit B and its attachments. ➢ North Main Pump Station located at 1539 Old North Main, Laconia, NH 03246 ➢ Maiden Lady Cove Pump Station located at 763 Scenic Rd Laconia, NH 03246 ➢ Winnisquam Pump Station located at 202 Water Street, Laconia, NH 03246 ➢ River Street Pump Station located at 101 River Street, Franklin, NH 03235 Note these roofs have been tested and determined to have no asbestos containing materials (ACM). This project should be completed as soon after contract approval as conditions and scheduling allow, but no later than June 30, 2027. Contacts All inquiries regarding the scope of this request for proposals for the WRBP locations should be directed to Joseph Irving at joseph.a.irving@des.nh.gov or (603) 406-0355 between the hours of 7 a.m. and 3 p.m. Monday through Friday. Contract questions should be directed to Ray Gordon at (603) 934-9936 or Sharon McMillin at
(603) 934-9930.
It is the responsibility of proposing firms to check for addenda on the state’s website for this RFP and acknowledge their receipt in their proposal response. Errors or omissions are the sole responsibility of the selected contractor, so it is strongly recommended that site visits be conducted to ascertain site conditions, accessibility, and extent of work areas and adjacent structures. The contractor will be solely responsible for errors or omissions and for payment, performance, errors, or omissions of their subcontractors, if any. Therefore, it is strongly recommended t
The contractor shall replace the existing roofs on four (4) Pump Station buildings in the WRBP Collection system. The work includes removing existing gravel surface asphalt (ballast) roofs and wet, light weight concrete tapered fill down to the structural concrete roof deck. The concrete roof deck shall be prepared and covered with a self-adhered vapor barrier. Tapered polyisocyanurate insulation shall be installed sloping to roof drains, mechanically attached to the concrete roof deck. The new insulation shall be covered with a single ply of new 0.060 EPDM membrane, adhered. All roof curbs will be replaced. New custom fabricated 0.090 aluminum edge metal, and fascia metal shall be installed around the perimeter of the roof. The existing rooftop penetrations shall be properly flashed with new membrane. The contractor shall supply all labor, tools, transportation, materials, equipment and permits as necessary.
We post new roofing opportunities in New Hampshire as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most New Hampshire work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: New Hampshire DAS Procurement (solicitation 7c051a3b-ce58-49d1-a875-2e35e220ef7c), retrieved via the NH DAS Procurement & Support Services portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.