Read the notice and its 5 attached documents and pull out the scope, the deadlines and what you have to submit.
PRB.42013 Helene Relief – Construction of Standard / Modular Bridge Replacement at 309 Tucker Road, Lansing in Ashe County and Construction of Design Bid Build Bridge at Mill Race Road, Boone in Watauga County
Contract: PRB.42013; WBS 51830.2.11.20 and 51830.2.11.06; HELENE RELIEF — POC
Letting: NCDOT Division 13 — bids open 12-16-2026
Documents: PRB.42013 Invitation to Bid.pdf (Invitation to Bid); PRB.42013 Plans.pdf (Plans); PRB.42013 Proposal.pdf (Proposals); PRB.42013 Report & Subsurf Inv.pdf (Contract Information); PRB.42013 Required Bid Documents.pdf (Proposals)
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
JOSH STEIN DANIEL H. JOHNSON
GOVERNOR SECRETARY
Mailing Address:
NC DEPARTMENT OF TRANSPORTATION
DIVISION THIRTEEN
55 ORANGE STREET
ASHEVILLE, NC 28801-2340
Telephone: (828) 250-3000
Fax: (828) 251-6394
Customer Service: 1-877-368-4968
Website: www.ncdot.gov
Location:
55 ORANGE STREET
ASHEVILLE, NC 28801-2340
November 24, 2026
NOTICE TO PROSPECTIVE BIDDERS
Subject: Invitation to Bid on Purchase Order Contract PRB.42013
County: Ashe & Watauga
Project Description: Helene Relief – Construction of Standard / Modular Bridge Replacement at
309 Tucker Road, Lansing in Ashe County and Construction of Design Bid
Build Bridge at Mill Race Road, Boone in Watauga County
The North Carolina Department of Public Safety Emergency Management Division and the
Department of Transportation are requesting bids for the construction of Standard and Modular
Bridges on a private road located at 309 Tucker Road over Little Horse Creek in Ashe County
and a Design Bid Build Bridge at Mill Race Road in Boone over Meat Camp Creek in Watauga
County to be let at 2:00 PM on Wednesday, December 16, 2026.
The date of availability for bridge construction at 309 Tucker Road site is the date the Contractor
begins work, but not before February 1, 2027 and no later than July 4, 2027.
The completion date for this contract is the date that is sixty (60) consecutive calendar days
after and including the date of availability.
The date of availability for bridge construction at the Mill Race Road site is the date the
Contractor begins work, but not before February 1, 2027 and no later than May 24, 2027.
The completion date for this contract is the date that is one hundred (100) consecutive calendar
days after and including the date of availability.
We post new structural work opportunities in North Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"https://connect.ncdot.gov/letting/Division 13 Letting/12-16-2026/D13POC.BM.40499 Invitation to Bid.pdf""Invitation to Bid""D13POC.BM.40499 Invitation to Bid.pdf""D13POC.BM.40499 (ID/IQ - SBE) Bridge Pavement Repairs and Overlays Along Various Interstate, Primary, and Secondary Routes in Division 13""https://connect.ncdot.gov/letting/Division 13 Letting/12-16-2026/D13POC.BM.40499 Proposal.pdf""Proposals""D13POC.BM.40499 Proposal.pdf""D13POC.BM.40499 (ID/IQ - SBE) Bridge Pavement Repairs and Overlays Along Various Interstate, Primary, and Secondary Routes in Division 13""https://connect.ncdot.gov/letting/Division 13 Letting/12-16-2026/D13POC.BM.40887 Invitation to Bid.pdf""Invitation to Bid""D13POC.BM.40887 Invitation to Bid.pdf""D13POC.BM.40887 (ID/IQ - SBE) Traffic Control Services Upon Request for Bridge Maintenance Operations in Division 13""https://connect.ncdot.gov/letting/Division 13 Letting/12-16-2026/D13POC.BM.40887 Proposal.pdf""Proposals""D13POC.BM.40887 Proposal.pdf""D13POC.BM.40887 (ID/IQ - SBE) Traffic Control Services Upon Request for Bridge Maintenance Operations in Division 13""https://connect.ncdot.gov/letting/Division 13 Letting/12-16-2026/D13POC.D2.40664 Invitation to Bid.pdf""Invitation to Bid""D13POC.D2.40664 Invitation to Bid.pdf""D13POC.D2.40664 (ID/IQ - STATE) Slope Stabilization Upon Request in Division 13""https://connect.ncdot.gov/letting/Division 13 Letting/12-16-2026/D13POC.D2.40664 Proposal.pdf""Proposals""D13POC.D2.40664 Proposal.pdf""D13POC.D2.40664 (ID/IQ - STATE) Slope Stabilization Upon Request in Division 13""https://connect.ncdot.gov/letting/Division 13 Letting/12-16-2026/D13POC.D2.40666 Invitation to Bid.pdf""Invitation to Bid""D13POC.D2.40666 Invitation to Bid.pdf""D13POC.D2.40666 (ID/IQ - FEDERAL) Slope Stabilization Upon Request in Division 13""https://connect.ncdot.gov/letting/Division 13 Letting/12-16-2026/D13POC.D2.40666 Proposal.pdf""Proposals""D13POC.D2.40666 Proposal.pdf""D13POC.D2.40666 (ID/IQ - FEDERAL) Slope Stabilization Upon Request in Division 13""https://connect.ncdot.gov/letting/Division 13 Letting/12-16-2026/DM00521 Invitation to Bid.pdf""Invitation to Bid""DM00521 Invitation to Bid.pdf""DM00521 Patching, Pavement Preservation, and Striping on 28 Sections of Secondary Routes in Buncombe County""https://connect.ncdot.gov/letting/Division 13 Letting/12-16-2026/DM00521 Plans.pdf""Plans""DM00521 Plans.pdf""DM00521 Patching, Pavement Preservation, and Striping on 28 Sections of Secondary Routes in Buncombe County""https://connect.ncdot.gov/letting/Division 13 Letting/12-16-2026/DM00521 Proposal.pdf""Proposals""DM00521 Proposal.pdf""DM00521 Patching, Pavement Preservation, and Striping on 28 Sections of Secondary Routes in Buncombe County""https://connect.ncdot.gov/letting/Division 13 Letting/12-16-2026/DM00531 Invitation to Bid.pdf""Invitation to Bid""DM00531 Invitation to Bid.pdf""DM00531 Repair Culvert BP-011-6000 Carrying Swannanoa River on Dunsmore Ave in Buncombe County""https://connect.ncdot.gov/letting/Division 13 Letting/12-16-2026/DM00531 Plans.pdf""Plans""DM00531 Plans.pdf""DM00531 Repair Culvert BP-011-6000 Carrying Swannanoa River on Dunsmore Ave in Buncombe County""https://connect.ncdot.gov/letting/Division 13 Letting/12-16-2026/DM00531 Proposal.pdf""Proposals""DM00531 Proposal.pdf""DM00531 Repair Culvert BP-011-6000 Carrying Swannanoa River on Dunsmore Ave in Buncombe County""https://connect.ncdot.gov/letting/Division 13 Letting/12-16-2026/DM00535 Invitation to Bid.pdf""Invitation to Bid""DM00535 Invitation to Bid.pdf""DM00535 Repair Bridge 100521 and Greenway on SR-3556 (Amboy Rd) over the French Broad River in Buncombe County""https://connect.ncdot.gov/letting/Division 13 Letting/12-16-2026/DM00535 Plans.pdf""Plans""DM00535 Plans.pdf""DM00535 Repair Bridge 100521 and Greenway on SR-3556 (Amboy Rd) over the French Broad River in Buncombe County""https://connect.ncdot.gov/letting/Division 13 Letting/12-16-2026/DM00535 Proposal.pdf""Proposals""DM00535 Proposal.pdf""DM00535 Repair Bridge 100521 and Greenway on SR-3556 (Amboy Rd) over the French Broad River in Buncombe County""https://connect.ncdot.gov/letting/Division 13 Letting/12-16-2026/PRB.42010 Invitation to Bid.pdf""Invitation to Bid""PRB.42010 Invitation to Bid.pdf""PRB.42010 Helene Relief – Construction of Standard and Modular Bridge Replacement at 75 Hominy Ridge, Canton in Haywood County""https://connect.ncdot.gov/letting/Division 13 Letting/12-16-2026/PRB.42010 Plans.pdf""Plans""PRB.42010 Plans.pdf""PRB.42010 Helene Relief – Construction of Standard and Modular Bridge Replacement at 75 Hominy Ridge, Canton NC""https://connect.ncdot.gov/letting/Division 13 Letting/12-16-2026/PRB.42010 Proposal.pdf""Proposals""PRB.42010 Proposal.pdf""PRB.42010 Helene Relief – Construction of Standard and Modular Bridge Replacement at 75 Hominy Ridge, Canton NC""https://connect.ncdot.gov/letting/Division 13 Letting/12-16-2026/PRB.42010 Report & Subsurf Inv.pdf""Contract Information""PRB.42010 Report & Subsurf Inv.pdf""PRB.42010 Helene Relief – Construction of Standard and Modular Bridge Replacement at 75 Hominy Ridge, Canton in Haywood County""https://connect.ncdot.gov/letting/Division 13 Letting/12-16-2026/PRB.42010 Required Bid Documents.pdf""Proposals""PRB.42010 Required Bid Documents.pdf""PRB.42010 Helene Relief – Construction of Standard and Modular Bridge Replacement at 75 Hominy Ridge, Canton in Haywood County""https://connect.ncdot.gov/letting/Division 13 Letting/12-16-2026/PRB.42012 Invitation to Bid.pdf""Invitation to Bid""PRB.42012 Invitation to Bid.pdf""PRB.42012 Helene Relief – Bridge Replacement on Private Road Located at 104 Misty Drive, Old Fort in McDowell County and 4370 Bald Mountain Road, Burnsville in Yancey County""https://connect.ncdot.gov/letting/Division 13 Letting/12-16-2026/PRB.42012 Plans.pdf""Plans""PRB.42012 Plans.pdf""PRB.42012 Helene Relief – Bridge Replacement on Private Road Located at 104 Misty Drive, Old Fort in McDowell County and 4370 Bald Mountain Road, Burnsville in Yancey County""https://connect.ncdot.gov/letting/Division 13 Letting/12-16-2026/PRB.42012 Proposal.pdf""Proposals""PRB.42012 Proposal.pdf""PRB.42012 Helene Relief – Bridge Replacement on Private Road Located at 104 Misty Drive, Old Fort in McDowell County and 4370 Bald Mountain Road, Burnsville in Yancey County""https://connect.ncdot.gov/letting/Division 13 Letting/12-16-2026/PRB.42012 Report & Subsurf Inv.pdf""Cancellation Letter""PRB.42012 Report & Subsurf Inv.pdf""PRB.42012 Helene Relief – Bridge Replacement on Private Road Located at 104 Misty Drive, Old Fort in McDowell County and 4370 Bald Mountain Road, Burnsville in Yancey County""https://connect.ncdot.gov/letting/Division 13 Letting/12-16-2026/PRB.42012 Required Bid Documents.pdf""Proposals""PRB.42012 Required Bid Documents.pdf""PRB.42012 Helene Relief – Bridge Replacement on Private Road Located at 104 Misty Drive, Old Fort in McDowell County and 4370 Bald Mountain Road, Burnsville in Yancey County""https://connect.ncdot.gov/letting/Division 13 Letting/12-16-2026/PRB.42013 Invitation to Bid.pdf""Invitation to Bid""PRB.42013 Invitation to Bid.pdf""PRB.42013 Helene Relief – Construction of Standard / Modular Bridge Replacement at 309 Tucker Road, Lansing in Ashe County and Construction of Design Bid Build Bridge at Mill Race Road, Boone in Watauga County""https://connect.ncdot.gov/letting/Division 13 Letting/12-16-2026/PRB.42013 Plans.pdf""Plans""PRB.42013 Plans.pdf""PRB.42013 Helene Relief – Construction of Standard / Modular Bridge Replacement at 309 Tucker Road, Lansing in Ashe County and Construction of Design Bid Build Bridge at Mill Race Road, Boone in Watauga County""https://connect.ncdot.gov/letting/Division 13 Letting/12-16-2026/PRB.42013 Proposal.pdf""Proposals""PRB.42013 Proposal.pdf""PRB.42013 Helene Relief – Construction of Standard / Modular Bridge Replacement at 309 Tucker Road, Lansing in Ashe County and Construction of Design Bid Build Bridge at Mill Race Road, Boone in Watauga County""https://connect.ncdot.gov/letting/Division 13 Letting/12-16-2026/PRB.42013 Report & Subsurf Inv.pdf""Contract Information""PRB.42013 Report & Subsurf Inv.pdf""PRB.42013 Helene Relief – Construction of Standard / Modular Bridge Replacement at 309 Tucker Road, Lansing in Ashe County and Construction of Design Bid Build Bridge at Mill Race Road, Boone in Watauga County""https://connect.ncdot.gov/letting/Division 13 Letting/12-16-2026/PRB.42013 Required Bid Documents.pdf""Proposals""PRB.42013 Required Bid Documents.pdf""PRB.42013 Helene Relief – Construction of Standard / Modular Bridge Replacement at 309 Tucker Road, Lansing in Ashe County and Construction of Design Bid Build Bridge at Mill Race Road, Boone in Watauga County"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: North Carolina Department of Transportation (solicitation PRB.42013; WBS 51830.2.11.20 and 51830.2.11.06; HELENE RELIEF-2026-12-16), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.