ID/IQ SLOPE STABILIZATION AND EXCAVATION OF WASTE MATERIAL WITHIN DIVISION 11-FEDERALLY FUNDED
Contract: MK00211 — POC
Letting: NCDOT Division 11 — bids open 12-03-2026
Documents: MK00211 PROPOSAL.pdf (Proposals); MK00211 INVITATION TO BID.pdf (Invitation to Bid)
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
JOSH STEIN DANIEL H JOHNSON
GOVERNOR SECRETARY
Mailing Address:
NC DEPT. OF TRANSPORTATION
DIVISION ELEVEN
P. O. BOX 250
NORTH WILKESBORO, NC 28659
Telephone: (336) 903-9101
Website: www.ncdot.org
Location:
NC DEPT. OF TRANSPORTATION
DIVISION ELEVEN
801 STATESVILLE RD
NORTH WILKESBORO, NC 28659
November 12, 2026
NOTICE TO PROSPECTIVE BIDDERS
Subject: Invitation to Bid
Division Eleven
Contract No.: MK00211
WBS: TBD
County: Alleghany, Ashe, Avery, Caldwell, Surry,
Watauga, Wilkes and Yadkin Counties
Location: ID/IQ Slope Stabilization and Excavation of Waste Material Within Division 11-
Federally Funded
Type of Work: Slope Stabilization
Bid Opening: December 3, 2026
The North Carolina Department of Transportation is requesting bids for the above project.
THE DEPARTMENT OF TRANSPORTATION DOES NOT EXCLUDE ANY PERSON FROM
PARTICIPATION IN, DENY ANY PERSON BENEFITS OF, OR OTHERWISE DISCRIMINATE
AGAINST ANYONE IN CONNECTION WITH THE AWARD AND PERFORMANCE OF ANY
CONTRACT COVERED BY THIS PROGRAM ON THE BASIS OF RACE, COLOR, SEX,
POLITICAL AFFILIATION/INFLUENCE, OR NATIONAL ORIGIN.
Contractors must be pre-qualified with NCDOT as Bidder or PO Prime Contractor prior to bidding on this
project.
The contractor will stabilize identified landslides by internally reinforcing the soil mass with soil nails and/or micropiles in locations identified by NCDOT. The contractor may be called for site visits to evaluate failures and prepare estimates. Following work order issuance, the contractor must provide PE-stamped engineering plans within 48 hours detailing soil nail construction sequence, size and spacing to meet minimum static/seismic factors of safety with a 75-year design life, and temporary/permanent facing and drainage details. The contractor must commence repair operations within 48 hours of work request receipt and maintain the ability to design and repair up to three sites simultaneously. All excavation is limited to removal of waste material generated by slope failure and repair construction. Excavated materials must be disposed of in compliance with applicable regulations, with slopes dressed to produce acceptable stable conditions. Hauling consists of transporting waste material using tandem-axle dump trucks with minimum 50,000 lbs GVWR, 20 years old or less, road legal, and capable of hauling rocks, stone, stumps, brush, logs, dirt, and other debris. Each truck must be measured and loaded to at least its measured capacity; no shrinkage deduction applies. The contractor provides all machinery, tools, labor, materials, erosion control, temporary drainage, and slope dressing required to complete the work until final acceptance.
We post new excavating opportunities in North Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"https://connect.ncdot.gov/letting/Division 11 Letting/12-03-2026/MK00210 INVITATION TO BID.pdf""Invitation to Bid""MK00210 INVITATION TO BID.pdf""ID/IQ SLOPE STABILIZATION AND EXCAVATION OF WASTE MATERIAL WITHIN DIVISION 11-STATE FUNDED""https://connect.ncdot.gov/letting/Division 11 Letting/12-03-2026/MK00210 PROPOSAL.pdf""Proposals""MK00210 PROPOSAL.pdf""ID/IQ SLOPE STABILIZATION AND EXCAVATION OF WASTE MATERIAL WITHIN DIVISION 11-STATE FUNDED""https://connect.ncdot.gov/letting/Division 11 Letting/12-03-2026/MK00211 PROPOSAL.pdf""Proposals""MK00211 PROPOSAL.pdf""ID/IQ SLOPE STABILIZATION AND EXCAVATION OF WASTE MATERIAL WITHIN DIVISION 11-FEDERALLY FUNDED""https://connect.ncdot.gov/letting/Division 11 Letting/12-03-2026/MK00211 INVITATION TO BID.pdf""Invitation to Bid""MK00211 INVITATION TO BID.pdf""ID/IQ SLOPE STABILIZATION AND EXCAVATION OF WASTE MATERIAL WITHIN DIVISION 11-FEDERALLY FUNDED"Most North Carolina work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: North Carolina Department of Transportation (solicitation MK00211-2026-12-03), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.