- 1. Capital sidewalk projects often include the installation of closed drainage infrastructure (curb and gutter) where none previously existed. Any new storm drainage installed as a result of the resulting contract shall tie into the existing drainage network (either open or closed system). Contractor(s) will be required to install storm infrastructure in accordance with plans and specifications approved by NDOT and MWS for their associated infrastructure. All projects shall be completed in accordance with NDOT's Details and Specifications and Metro Water Services' Details and Specifications. Contractor(s) shall not move any MWS facilities without current approved MWS stamped plans nor construct NDOT infrastructure without approved NDOT stamped plans. As noted on the plans, some water relocations may be contracted outside of this scope separately by MWS. All other utility relocations will be the responsibility of the contractor(s). Contractor(s) will be provided with full design plans including estimated quantities. However, some non- complex projects will not require full design plans and contractors() may be asked to submit a proposal based on a concept design (30% design level) and/or a field review of the project. Projects will vary in scope and complexity and linear footage. A typical project includes approximately 1,500 linear feet of sidewalk with new storm drainage infrastructure and/or 1,500 linear feet of bikeway with associated pavement markings. The typical construction duration is one year. NDOT reserves the right to bundle multiple projects if it is in the best interest of Metro. All projects will have a dedicated CEI to monitor the contractor(s) performance and make sure compliance with plans and specifications for the project. Sidewalks are typically defined as concrete walkways intended for use by pedestrians and located within the established rights-of-way. However, other types of pedestrian paths may be required under the scope of this project, including asphalt multi-use paths either within or outside of the right-of-way, pedestrian plazas/gateways or other amenity areas including decorative hardscape elements, brick sidewalk matching those of historic areas, concrete or otherwise protected medians intended as safety features for pedestrian use, protected paved shoulders for use by pedestrians, etc. Bikeways are typically defined as asphalt bike lanes intended for use by cyclists located within the established right-of-way. However, other types of bikeways may be required under the scope of this project. Contractor(s) shall provide Metro with construction and maintenance services for sidewalks and bikeways. These services include sidewalks, walkways, paths, bikeways, and/or related infrastructure (curb ramps, curbing, gutters, bulb-outs, bus boarding areas, refuge islands, warning mats, delineators, bollards, etc.) located on public property including Metro or State rights-of-way or easements, MNPS property, Parks property, etc. Construction may require decorative finishes, patterns, colors, or materials (including brick pavers) to match the existing infrastructure. All project shall be completed in accordance with NDOT's Details and Specifications and TDOT's Standard Specifications. Contractor Requirements Project Management: Consists of general project management, administrative, and accounting activities for the project. Serves as 8
RFQ GG000133 Proprietary and Confidential 11/19/2026 4:52 PM main point of contact between Metro, any consultants and Contractor to ensure that information is distributed to appropriate team members and assigned staff. Regular bi-weekly meetings/teleconferences will be held between Metro, the Contractor(s) and other associated stakeholders, with minutes of these meetings distributed within 48 hours of each meeting. A project schedule and payout curve will be developed for approval by Metro. Construction: Includes the following items listed below, at a minimum: • Pre-Construct
- Doc Url
- /marketplace/api/blob?p=nashville%2F300001729703752%2FGG000133_SUPPLIER.pdf&fn=GG000133_SUPPLIER.pdf
- Address
- PO Box 196301 Nashville, TN 37219 Davidson United States
- Pdf Text
- RFQ GG000133
Proprietary and Confidential 11/19/2026 4:52 PM
RFQ GG000133
Title Sidewalk and Bikeway Construction and Maintenance Services
Preview Date Open Date 11/19/2026 4:52 PM
Close Date 12/17/2026 2:00 PM Award Date
Time Zone Central Standard Time
1
RFQ GG000133
Proprietary and Confidential 11/19/2026 4:52 PM
Submit your response to the following contact.
Company Metropolitan Government of Nashville and Davidson County
Buyer Daniel A Drumwright
Location PO Box 196301
Nashville, TN 37219
Davidson
United States
Phone 1-615-862-6632
Fax
E-mail Daniel.Drumwright2@nashville.gov
When submitting your response, include the following information.
Your Company Name
Company Site (Optional)
Address
Contact Details
Response Valid Until
(Optional)
This document has important legal consequences. The information contained in this document is proprietary of
Metropolitan Government of Nashville and Davidson County. It shall not be used, reproduced, or disclosed to others
without the express and written consent of Metropolitan Government of Nashville and Davidson County.
2
RFQ GG000133
Proprietary and Confidential 11/19/2026 4:52 PM
Table of Contents1 Overview.......................................................................................................................................................................41.1 General Information..............................................................................................................................................41.2 Schedule................................................................................................................................................................41.3 Negotiation Controls.............................................................................................................................................41.4 Terms....................................................................................................................................................................42 Requirements................................................................................................................................................................52.1 Section 1. RFP Solicitation (Selection) Method...................................................................................................52.2 Section 2. Waiver Process.....................................................................................................................................62.3 Section 3. Commodity Codes...............................................................................................................................62.4 Section 4. Timeline...............................................................................................................................................72.5 Section 5. Solicitation Objective...........................................................................................................................72.6 Section 6. Scope Summary...................................................................................................................................82.7 Section 7. Scope Details.......................................................................................................................................82.8 Section 8. Construction Clauses.........................................................................................................................122.9 Section 9. Equal Business Opportunity (EBO) Program Requirements.............................................................152.10 Section 10. Insurance Requirements.................................................................................................................172.11 Section 11. Standard Solicitation Requirements...............................................................................................182.12 Section 12. Solicitation Acceptance.................................................................................................................272.13 Section 13. Contract Acceptance......................................................................................................................282.14 Section 14. Evaluation Criteria.........................................................................................................................292.15 Section 15. Affidavits.......................................................................................................................................31
3
RFQ GG000133
Proprietary and Confidential 11/19/2026 4:52 PM
1 Overview
1.1 General Information
Title Sidewalk and Bikeway Construction and Maintenance Services
Buyer Daniel A Drumwright Outcome Contract Purchase
Agreement
E-Mail Daniel.
Drumwright2@nashville.
gov
1.2 Schedule
Preview Date Open Date 11/19/2026 4:52 PM
Close Date 12/17/2026 2:00 PM Award Date
Time Zone Central Standard Time
1.3 Negotiation Controls
Response Visibility Sealed
1.4 Terms
Agreement Start Date Agreement End Date
Agreement Amount
(USD)
Payment Terms Net 30 Freight Terms SUPPLIER PREPAID
Shipping Method FOB DELIVERY
Negotiation Currency USD (US Dollar)
Price Precision 0
4
RFQ GG000133
Proprietary and Confidential 11/19/2026 4:52 PM
2 Requirements
*Response is required
Make sure to review the entire solicitation to gain an understanding of all the requirements and expectations
prior to creating and submitting a response.
2.1 Section 1. RFP Solicitation (Selection) Method
1.
Request for Proposal
Pursuant to Metropolitan Code of Laws (M.C.L.) Section 4.12.040, this solicitation document serves as the
written determination of the Purchasing Agent, that the use of competitive sealed bidding is neither
practicable nor advantageous to Metro. Therefore, this solicitation will facilitate the entering into of contract
(s) by the competitive sealed proposals process. The proposal process, flexibility and limitations are
governed by the Code and related Procurement Regulations.
The proposal selection method permits discussions with offerors who submit proposals determined to be
reasonably susceptible of being selected for award. Modifications in proposal content, comparative
judgmental evaluations of the proposals, corrections, and scope adjustments, may occur at the request of
the Purchasing Agent or their designee.
There may be one or more amendments to this solicitation. Solicitation amendments are included as
updates to the original solicitation. It is the offeror's responsibility to remain informed on all solicitation
amendments and submit the solicitation response incorporating all amendments.
Offers to Metro online solicitations are required to be submitted within the iSupplier online environment
unless otherwise stated. Hard copy offers will not be considered except as required by law.
Any response to this solicitation is a formal waiver of any claims of confidentiality regardless of what may be
stated, printed, or implied in the submission and/or attachments submitted. All information is made a Public
Record after an award is made.
5
RFQ GG000133
Proprietary and Confidential 11/19/2026 4:52 PM
The only official position of Metro is found within this solicitation document including answers provided in
response to questions raised. The online discussion tool within iSupplier is the appropriate tool for all
questions or communications concerning this solicitation.
Metro reserves the right to issue additional rounds as it deems necessary for the purposes of evaluation.
Additional rounds may include, but not be limited to, Offeror interviews.
Metro reserves the right to make multiple awards for a contract if it is deemed in the best interest of Metro.
2.2 Section 2. Waiver Process
1. Pursuant to Metropolitan Code of Laws (M.C.L.) Section 4.48.115 (Conflicts with Previous Metro Projects),
Non-Metro employees who provide services to the metropolitan government regarding the feasibility, cost,
design, implementation, or legislative adoption of a particular matter are prohibited from subsequent
participation in the procurement process or resultant contract(s) related to that particular matter.
Any offeror who may meet the standard of MCL 4.48.115 must disclose this potential conflict to the buyer
prior to the solicitation's deadline for questions. This disclosure must include reference to the offeror's prior
work on the particular matter, including the specific project and prospective offerors' participation, and the
timeframe services were rendered. If the offeror is requesting a waiver from MCL 4.48.115 this must be
explicitly stated in the disclosure.
Requests for a waiver will be reviewed by the Procurement Standards Board with final decisions published
in the news items section of purchasing.nashville.gov.
2.3 Section 3. Commodity Codes
1. This solicitation is being published under the following UNSPSC (United Nations Standard Products and Services
Code) Commodity Codes:
• 80101600 Project management
• 81141500 Quality control
• 81141503 Materials or product inspection
• 72154000 Specialty building and trades services
• 81101513 Building construction management
• 25190000 Transportation services equipment
• 72101703 Sidewalk or curb construction
• 72101700 Concrete work
6
RFQ GG000133
Proprietary and Confidential 11/19/2026 4:52 PM
• 72152700 Concrete installation and repair services
• 72154013 Fence construction service
• 72150000 Specialized Trade Construction And Maintenance Services
• 72100000 Building/Facility Maintenance And Repair Services
2.4 Section 4. Timeline
1.
The following is the general, unofficial anticipated timeline for this solicitation. These dates represent a good
faith effort, accurate at the time of publication. They are non-binding and subject to change. They are for
informational purposes only and subsidiary to official dates/times contained elsewhere in the solicitation:
• 11/24/2026 - Solicitation Opens
• 12/3/2026 - Pre-Offer Meeting
• 12/4/2026 - Amendment Published with Pre-Offer PowerPoint and
Attendee List
• 12/72026 - Deadline to Submit Questions in iSupplier
• 12/10/2026 - Amendment Published with Response to Online Discussion
Questions
• 12/17/2026 - Solicitation Closes
• 12/21/2026 - Responsive Offers Provided to BAO for Review
• 12/23/2026 - Responsive Offers Provided to Evaluation Committee
• 1/12/2027 - Evaluation Committee Meeting
• 1/19/2026 - Intent to Award Issued
• 1/29/2027 - Protest Period Ends & Deadline for Awarded Supplier to
Provide Outstanding Documents
• 2/1/2027 - Contract Sent to Awarded Supplier for Review
• 2/5/2027 - Contract Routes for Signature
• 2/12/2027 - Sourcing Process Complete
2.5 Section 5. Solicitation Objective
1. The objective of this solicitation is to enter into an indefinite delivery/indefinite quantity (IDIQ) contract. Metro
does not guarantee minimum or maximum purchase amounts for the requested goods and/or services.
Purchases shall be made on an as-needed basis by Metro via Purchase Order. No purchase is guaranteed,
and no work shall be performed until receipt of Metro-issued Purchase Order.
Metro intends to award multiple contracts (up to 5 contracts) based upon the evaluation of received submissions within
the competitive range.
7
RFQ GG000133
Proprietary and Confidential 11/19/2026 4:52 PM
2.6 Section 6. Scope Summary
1. The Metropolitan Government of Nashville & Davidson County ("Metro") is seeking proposals from qualified
contractors for provision of Sidewalk and Bikeway Construction and Maintenance Services throughout
Nashville-Davidson County, improving and expanding Nashville's pedestrian and bikeway infrastructure
networks. Services may include, but are not limited to specialized concrete finishing, furnishing and
installing new storm pipe, curbs, gutters, storm inlets, culverts, sidewalks, bikeways, handrails, retaining
walls, curb ramps, driveway ramps, pedestrian signals, pedestrian lighting, asphalt paving, crosswalk
markings, crosswalk lighting, bollards, decorative elements, landscaping, irrigation, additional reinforcement,
and all associated work for a complete project.
2.7 Section 7. Scope Details
1. Capital sidewalk projects often include the installation of closed drainage infrastructure (curb and gutter)
where none previously existed. Any new storm drainage installed as a result of the resulting contract shall
tie into the existing drainage network (either open or closed system). Contractor(s) will be required to install
storm infrastructure in accordance with plans and specifications approved by NDOT and MWS for their
associated infrastructure. All projects shall be completed in accordance with NDOT's Details and
Specifications and Metro Water Services' Details and Specifications. Contractor(s) shall not move any MWS
facilities without current approved MWS stamped plans nor construct NDOT infrastructure without approved
NDOT stamped plans. As noted on the plans, some water relocations may be contracted outside of this
scope separately by MWS. All other utility relocations will be the responsibility of the contractor(s).
Contractor(s) will be provided with full design plans including estimated quantities. However, some non-
complex projects will not require full design plans and contractors() may be asked to submit a proposal
based on a concept design (30% design level) and/or a field review of the project. Projects will vary in scope
and complexity and linear footage. A typical project includes approximately 1,500 linear feet of sidewalk with
new storm drainage infrastructure and/or 1,500 linear feet of bikeway with associated pavement markings.
The typical construction duration is one year. NDOT reserves the right to bundle multiple projects if it is in
the best interest of Metro. All projects will have a dedicated CEI to monitor the contractor(s) performance
and make sure compliance with plans and specifications for the project.
Sidewalks are typically defined as concrete walkways intended for use by pedestrians and located within the
established rights-of-way. However, other types of pedestrian paths may be required under the scope of this
project, including asphalt multi-use paths either within or outside of the right-of-way, pedestrian
plazas/gateways or other amenity areas including decorative hardscape elements, brick sidewalk matching
those of historic areas, concrete or otherwise protected medians intended as safety features for pedestrian
use, protected paved shoulders for use by pedestrians, etc.
Bikeways are typically defined as asphalt bike lanes intended for use by cyclists located within the
established right-of-way. However, other types of bikeways may be required under the scope of this project.
Contractor(s) shall provide Metro with construction and maintenance services for sidewalks and bikeways.
These services include sidewalks, walkways, paths, bikeways, and/or related infrastructure (curb ramps,
curbing, gutters, bulb-outs, bus boarding areas, refuge islands, warning mats, delineators, bollards, etc.)
located on public property including Metro or State rights-of-way or easements, MNPS property, Parks
property, etc. Construction may require decorative finishes, patterns, colors, or materials (including brick
pavers) to match the existing infrastructure. All project shall be completed in accordance with NDOT's
Details and Specifications and TDOT's Standard Specifications.
Contractor Requirements
Project Management:
Consists of general project management, administrative, and accounting activities for the project. Serves as
8
RFQ GG000133
Proprietary and Confidential 11/19/2026 4:52 PM
main point of contact between Metro, any consultants and Contractor to ensure that information is
distributed to appropriate team members and assigned staff. Regular bi-weekly meetings/teleconferences
will be held between Metro, the Contractor(s) and other associated stakeholders, with minutes of these
meetings distributed within 48 hours of each meeting. A project schedule and payout curve will be
developed for approval by Metro.
Construction:
Includes the following items listed below, at a minimum:
• Pre-Construction Meeting: Discuss plan of operation, required contract provisions,
environmental commitments, and establish the level of detail to be required for measuring
progress with regard to construction Pay Items. No work for any phase of construction shall be
started without a notice to proceed (NTP) from Metro. For most repair projects the Purchase
Order (PO) will act as the NTP. For most rapid and gap projects, there will be an on-site
meeting at least 7-14 Calendar Days prior to beginning any construction, unless otherwise
authorized in writing by Metro. The NTP would occur after the pre-construction meeting.
• Maintaining Traffic: Operations scheduled and conducted in such a manner and sequence as
to cause the least practicable interference with the traveling public, fire/police/OEM protection
and utility services. Where work is carried on in or adjacent to any street, alley or public place,
the Contractor(s) shall furnish and erect such barricades, lights, fences, and danger signals,
shall provide such watchmen, and shall take such other precautionary measures for the
protection of person or property and of the work in compliance with the current MUTCD, Part 6,
Temporary Traffic Control Measures.
• Work in Easements: Where work is to be constructed within easements on private property, it
shall be subject to the provisions of the easement agreement on file and open to inspection in
the Office of the Metropolitan Clerk.
• Pre-Inspection and Notification by the Contractor(s): Inspect the project, take elevations of the
grade work, if required, and point out any items that are not in agreement with this assignment.
• Street Name/Bus Stop Sign and Mailboxes: Contractor(s) shall remove, preserve, and replace
all signs.
• Protection of Trees and Shrubbery: Notification to Affected Property Owners: Required to
provide advance notice of at least three (3) days to all property owners/affected parties.
• Coordination with property owner: Contractor(s) may be required to coordinate impacts directly
with property owner. This includes times during which their driveways will be inaccessible, etc.
Projects may require restitution of private property features (driveway tie-ins, mailbox
relocations, landscaping, etc.) which could also require minor additional property owner
coordination.
• Permits: Required to comply with all Metro, State and Federal permits required for each project
and shall comply with Tenn. Code Ann. §§ 62-35-102(18) and 62-35-1 03(a)(15)(b). Officers
from jurisdictions other than the MNPD must be in compliance with the requirements of Tenn.
Code Ann. § 62-35-141 and all other applicable statutes, rules and regulations. Pursuant to this
policy, all persons having contact with or who are in the proximity to school children or children
in childcare programs must submit the complete criminal background clearance process,
pursuant to Tennessee Code Annotated 49-5-413. Contractor(s) shall obtain the required
permits for actual construction, such as NDOT Right-of-Way Excavation Permits, lane closure
permits, etc. Environmental Permits shall comply with Stormwater Management Requirements.
Should the Contractor(s) activities associated with the work on the project be in violation of the
MWS Grading Permit or the ARAP Permit, any fines and/or penalties assessed to Metro will be
deducted from monies due the Contractor(s). Construction must adhere to the protocol,
stipulations, and methods outlined in the ARAP permits and as directed by TDEC. Some
projects may require permits from CSX or NERR railways. Construction must adhere to the
protocol, stipulations, and construction methods outlined in the permit and directed by the
9
RFQ GG000133
Proprietary and Confidential 11/19/2026 4:52 PM
railway authority. If a railroad construction and/or flagging permit is required, the contractor(s)
ar