- SPECIAL PROVISIONS
CONTRACT NO. 03926
SECTION I – 1 –
Backsfed.082726
STATE OF MONTANA
DEPARTMENT OF TRANSPORTATION
BID PACKAGE
Sealed bids for construction of this project will be received by the Montana Department of
Transportation, Construction Contracting Section, Room 101, 2701 Prospect, Helena, Montana
until 9:00 a.m. on October 8, 2026. All bids will then be publicly opened, reviewed for
correctness, and then publicly read.
Federal Aid Project(s):
STPS-HSIP 203-1(16)4 North of Stevensville-North
Bid proposals, Plans, Standard Specifications, Detail Drawings, and Standard Contract Forms
are on file for examination and may be obtained from the Construction Contracting Bureau of
the Montana Department of Transportation, 2701 Prospect Avenue, P.O. Box 201001, Helena,
Montana 59620-1001.
Prime bidders use the Electronic Bid System or bid on-line through Bid Express to produce a bid
containing Proposal Forms, Schedule of Items, and Disadvantaged Business Enterprises (DBE)
Requirements (if applicable).
MONTANA DEPARTMENT OF TRANSPORTATION
Loran Frazier, Chairperson
Montana Transportation Commission
Christopher Dorrington
Director of Transportation
Contract No.03926
BB:ST:6138000ADVADVERTISED COPY
SPECIAL PROVISIONS
CONTRACT NO. 03926
SECTION I – 2 –
MONTANA DEPARTMENT OF TRANSPORTATION
SCHEDULE OF ITEMS
CONTRACT ID: 03926
PROJECT: STPS-HSIP 203-1(16)4 6138016000 NORTH OF STEVENSVILLE-
NORTH
SECTION: 0001 - GRADE,GRAVEL,PMS, DRAIN, & ROUNDABOUT
PROP LINE
NO.
ITEM
NUMBER
ITEM DESCRIPTION UNIT OF
MEASURE
QUANTITY
0010 103000000 TRAINING PROGRAM HOUR 1,000.00
0020 103500005 ESCROW OF BID DOCUMENTS LS 1.00
0030 104030010 MISCELLANEOUS WORK UNIT 80,000.00
0040 104030011 MISCELLANEOUS ITEMS-LS LS 1.00
0050 104030013 MISCELLANEOUS ITEMS-HOUR HOUR 700.00
0060 104030025 MISCELLANEOUS ITEMS-INSTALL EACH 1.00
0070 104030070 MISCELLANEOUS ITEMS-REMOVAL LS 1.00
0080 104030071 MISCELLANEOUS ITEMS-REMOVAL LNFT 3,605.00
0090 105070000 CONTRACTOR SURVEY AND LAYOUT LS 1.00
0100 108000000 CRITICAL PATH SCHEDULE LS 1.00
0110 109200005 MOBILIZATION LS 1.00
0120 201130000 CLEARING AND GRUBBING LS 1.00
0130 202020056 REMOVE STRUCT AND OBSTRUCTIONS LS 1.00
0140 202020358 ABANDON WELL EACH 3.00
0150 203020100 EXCAVATION-UNCLASSIFIED CUYD 200,482.00
0160 203020185 TEMPORARY CHANNEL DIVERSION LS 1.00
0170 203020200 EXCAVATION-UNCLASS BORROW CUYD 24,209.00
0180 203080100 TOPSOIL-SALVAGING AND PLACING CUYD 25,305.00
0190 206000020 DETOUR-CONSTRUCT, MAINTAIN, REMOVE LS 1.00
0200 208010150 TEMPORARY EROSION CONTROL-LS LS 1.00
0210 208010200 TEMPORARY EROSION CONTROL-FIXED UNIT 500.00
0220 208010500 BIOENGINEERED BANK LS 1.00
0230 210020170 TEST TRAILER-TRANSPORT, SETUP MILE 64.00
0240 212000000 OBLITERATE ROADWAY STA 7.00
0250 301020268 TRAFFIC GRAVEL CUYD 9,000.00
0260 301020340 CRUSHED AGGREGATE COURSE CUYD 49,882.00
0270 301020348 DRAIN AGGREGATE CUYD 75.00
0280 301020625 AGGREGATE TREATMENT SQYD 183,101.00
0290 401020046 PLANT MIX BIT SURF-MISC TON 2,323.00
0300 401020048 PLANT MIX SURF-1/2 IN TON 39,096.00ADVERTISED COPY
SPECIAL PROVISIONS
CONTRACT NO. 03926
SECTION I – 3 –
SECTION: 0001 - GRADE,GRAVEL,PMS, DRAIN, & ROUNDABOUT
PROP LINE
NO.
ITEM
NUMBER
ITEM DESCRIPTION UNIT OF
MEASURE
QUANTITY
0310 401020300 HYDRATED LIME TON 580.00
0320 402020192 ASPHALT BINDER PG 58V-34 TON 2,403.20
0330 402020315 EMULSIFIED ASPHALT-TACK COAT GAL 19,313.00
0340 402020320 EMULSIFIED ASPHALT-FOG SEAL GAL 12,491.00
0350 402020375 EMULSIFIED ASPHALT CHFRS-2P TON 293.20
0360 409000020 COVER-TYPE 2 SQYD 164,827.00
0370 411011145 SINUSOIDAL RUMBLE STRIPS MILE 15.10
0380 501010126 PORT CEM CONC PAVE 9 IN COLORED SQYD 411.00
0390 551020030 CONCRETE-CLASS GENERAL CUYD 81.50
0400 551020126 CONTROLLED LOW STRENGTH MATL CUYD 10.10
0410 603000050 GRANULAR BEDDING MATERIAL CUYD 616.00
0420 603000060 FOUNDATION MATERIAL CUYD 375.00
0430 603010020 FILL AND ABANDON PIPE CUYD 20.00
0440 603010025 PLUG ENDS AND ABANDON PIPE EACH 2.00
0450 603010040 DRAINAGE PIPE 18 IN LNFT 2,050.00
0460 603010048 DRAINAGE PIPE 24 IN LNFT 1,132.00
0470 603010068 DRAINAGE PIPE 48 IN LNFT 178.00
0480 603010092 DRAINAGE PIPE 84 IN LNFT 116.00
0490 603010148 DRAINAGE PIPE ARCH 24 IN EQ DIA LNFT 132.00
0500 603010276 DRAINAGE PIPE 24 IN IRR LNFT 493.00
0510 603010714 CSP 96 IN LNFT 330.00
0520 603011065 CSPA 42 IN EQ DIA LNFT 136.00
0530 603012506 RCP 12 IN LNFT 116.00
0540 603012530 RCP 18 IN LNFT 1,400.00
0550 603012555 RCP 24 IN LNFT 820.00
0560 603012847 RCP IRR 18 IN LNFT 67.00
0570 603013190 RCPA 18 IN EQ DIA LNFT 98.00
0580 603013202 RCPA 24 IN EQ DIA LNFT 314.00
0590 603013290 REIN CONC BOX 18 X 11 LNFT 114.00
0600 603013387 REIN CONC BOX 14 X 10 LNFT 124.00
0610 603013452 PIPE-PVC 12 IN LNFT 702.00
0620 603013453 PIPE-PVC 18 IN LNFT 20.00
0630 603013457 PIPE-PVC 8 IN LNFT 2,207.00
0640 603013462 PIPE-PVC 6 IN LNFT 727.00
0650 603013654 ENCASEMENT PIPE-12 IN LNFT 128.00
0660 603013656 ENCASEMENT PIPE-16 IN LNFT 321.00ADVERTISED COPY
SPECIAL PROVISIONS
CONTRACT NO. 03926
SECTION I – 4 –
SECTION: 0001 - GRADE,GRAVEL,PMS, DRAIN, & ROUNDABOUT
PROP LINE
NO.
ITEM
NUMBER
ITEM DESCRIPTION UNIT OF
MEASURE
QUANTITY
0670 603013660 ENCASEMENT PIPE - 18 IN LNFT 316.00
0680 603016003 SPECIAL INSTALLATION OF PIPE LNFT 190.00
0690 603016033 STEEL CASING 8 IN LNFT 29.00
0700 603016036 STEEL CASING 6 IN LNFT 19.00
0710 603016054 STEEL CASING 48 IN LNFT 175.00
0720 603016056 STEEL CASING 36 IN LNFT 148.00
0730 603017040 STORM DRAIN PIPE-12 IN LNFT 740.10
0740 603017050 STORM DRAIN PIPE-18 IN LNFT 78.50
0750 603587020 REMOVE PIPE CULVERT LNFT 4,512.00
0760 604000120 REMOVE FIRE HYDRANT EACH 1.00
0770 604010172 REMOVE MANHOLE EACH 2.00
0780 604010302 MANHOLE STRUCTURE BASE 48 IN (1220 EACH 14.00
0790 604010304 MANHOLE STRUCTURE BASE 60 IN EACH 1.00
0800 604010352 ADDITIONAL BARREL 48 IN LNFT 7.00
0810 604010354 ADDITIONAL BARREL 60 IN LNFT 1.00
0820 604010660 MANHOLE LID AND FRAME EACH 3.00
0830 604010661 CURB INLET FRAME AND GRATE EACH 12.00
0840 606010330 MGS GUARDRAIL LNFT 2,162.50
0850 606010335 MASH W-BEAM TERMINAL SECTION EACH 13.00
0860 606010337 MGS GUARDRAIL/LONG POSTS LNFT 437.50
0870 606010345 MGS ONE-WAY DEPARTURE TERMINAL EACH 3.00
0880 606010346 MGS INTERSECTING RDWAY TERMINAL LNFT 112.50
0890 606011503 RESET TEMP IMPACT ATTENUATOR EACH 34.00
0900 606011518 TEMPORARY IMPACT ATTENUATOR EACH 8.00
0910 607100005 FENCE-SPECIAL DESIGN - A LNFT 870.00
0920 607100007 FENCE-SPECIAL DESIGN - B LNFT 1,572.00
0930 607100012 FENCE - MODIFIED FARM FM LNFT 4,640.00
0940 607100013 FENCE - WILDLIFE LNFT 3,319.00
0950 607100014 FENCE - PANEL/SINGLE - WILDLIFE EACH 30.00
0960 607100015 FENCE - PANEL/DOUBLE - WILDLIFE EACH 30.00
0970 607100111 FARM FENCE-TYPE F2W-39 IN WW LNFT 2,828.00
0980 607100114 FARM FENCE-TYPE F2W-32 IN WW LNFT 500.00
0990 607100116 FARM FENCE-TYPE F1W-39 IN WW LNFT 1,204.00
1000 607100148 FARM FENCE-TYPE F2M-39 IN WW LNFT 61.00
1010 607100152 FARM FENCE-TYPE F3M-32 IN WW LNFT 321.00
1020 607100159 FARM FENCE-TYPE FW-SMOOTH LNFT 2,479.00ADVERTISED COPY
SPECIAL PROVISIONS
CONTRACT NO. 03926
SECTION I – 5 –
SECTION: 0001 - GRADE,GRAVEL,PMS, DRAIN, & ROUNDABOUT
PROP LINE
NO.
ITEM
NUMBER
ITEM DESCRIPTION UNIT OF
MEASURE
QUANTITY
1030 607100229 FARM FENCE-TYPE F4W LNFT 1,752.00
1040 607100259 FARM FENCE-TYPE F5W LNFT 513.00
1050 607100262 FARM FENCE-TYPE F5W-8 FT POST LNFT 771.00
1060 607100317 FARM FENCE-TYPE FW-32 IN WW LNFT 113.00
1070 607100319 FARM FENCE-TYPE FW-39 IN WW LNFT 83.00
1080 607100321 FARM FENCE-TYPE FW-48 IN WW LNFT 1,487.00
1090 607100360 FARM FENCE-PANEL/SINGLE FW EACH 51.00
1100 607100362 FARM FENCE-PANEL/SINGLE FM EACH 10.00
1110 607100380 FARM FENCE-PANEL/DOUBLE FW EACH 103.00
1120 607100385 FARM FENCE-PANEL/DOUBLE FM EACH 21.00
1130 607100395 FENCE-PANEL/DBL-SPECIAL DESIGN EACH 5.00
1140 607100440 FARM GATE-METAL-TYPE G-3 LNFT 276.00
1150 607100455 GATE-SPECIAL DESIGN LNFT 16.00
1160 607100551 FENCE-TEMPORARY LNFT 1,673.00
1170 607100720 DEADMAN EACH 6.00
1180 607150125 RESET FENCE LNFT 1,358.00
1190 607150131 RESET GATE EACH 6.00
1200 608010113 DECORATIVE CONCRETE - 3 IN SQYD 1,564.30
1210 609010121 CURB-SPECIAL DESIGN LNFT 212.30
1220 609010200 CURB AND GUTTER-CONC LNFT 5,171.40
1230 609010215 CURB MEDIAN-SPECIAL DESIGN COLOR LNFT 748.80
1240 610100101 SEEDING AREA NO 1 ACRE 42.90
1250 610100102 SEEDING AREA NO 2 ACRE 6.20
1260 610100103 SEEDING AREA NO 3 ACRE 21.40
1270 610100326 FERTILIZING AREA NO 1 ACRE 42.90
1280 610100327 FERTILIZING AREA NO 2 ACRE 6.20
1290 610100563 WEED CONTROL MAT SQYD 533.00
1300 610100565 EROSION CONTROL BLANKET-HIGH- SQYD 3,147.00
1310 610100625 LANDSCAPING LS 1.00
1320 610100720 LANDSCAPE ROCK CUYD 177.00
1330 610220050 MULCH-COMPOST ACRE 6.20
1340 613100090 CULVERT INFILL CUYD 372.80
1350 613100105 ANCILLARY ARMOR CUYD 40.20
1360 613520010 VEGETATED CONCRETE BLOCK MAT SQYD 53.00
1370 615010580 TRASH GUARD EACH 7.00
1380 616343914 CONDUIT-PLASTIC 1 1/2 IN LNFT 1,850.00ADVERTISED COPY
SPECIAL PROVISIONS
CONTRACT NO. 03926
SECTION I – 6 –
SECTION: 0001 - GRADE,GRAVEL,PMS, DRAIN, & ROUNDABOUT
PROP LINE
NO.
ITEM
NUMBER
ITEM DESCRIPTION UNIT OF
MEASURE
QUANTITY
1390 616343920 CONDUIT-PLASTIC 2 IN LNFT 420.00
1400 616783007 PULL BOX-COMPOSITE TYPE 2 EACH 7.00
1410 617000000 FOUNDATION-CONCRETE CUYD 8.50
1420 617033214 CABLE-COPPER 3AWG14-600V LNFT 100.00
1430 617123108 CONDUCTOR-COPPER AWG8-600V LNFT 5,200.00
1440 617123110 CONDUCTOR-COPPER AWG10-600V LNFT 2,270.00
1450 617183056 STANDARD-STL TYPE 10-A-500-6 EACH 14.00
1460 617303300 HIGH EFFICACY LUMINAIRE LED EACH 14.00
1470 617333100 SERV ASSEMBLY EACH 1.00
1480 617781000 REMOVE AND SALVAGE MISC ELECTRICAL LS 1.00
1490 618030005 TRAFFIC CONTROL DEVICES CB UNIT 1,250,000.0
1500 618030015 TRAFFIC CONTROL-FIXED UNIT 500.00
1510 618030230 TRAFFIC CONTROL PLAN LS 1.00
1520 618100000 SINGLE USE SIGNS SQFT 283.00
1530 618100001 MOTORCYCLE ADVISORY SIGN EACH 2.00
1540 618100005 PORTABLE VARIABLE MESSAGE SIGN EACH 3.00
1550 618190100 TEMPORARY BARRIER RAIL LNFT 760.00
1560 618190110 RESET TEMP BARRIER RAIL LNFT 3,180.00
1570 619010062 SIGNS-ALUM SHEET INCR XI SQFT 64.30
1580 619010090 SIGNS-ALUM REFL SHEET XI SQFT 1,067.70
1590 619010230 REMOVE SIGN EACH 82.00
1600 619010240 REMOVE SIGN-GUIDE EACH 3.00
1610 619010310 POSTS-STEEL U SIGN LB 115.00
1620 619010340 POSTS-TUBULAR STEEL-SQ-PERF LB 649.00
1630 619010450 POLES-TREATED WOOD 4 IN EACH 66.00
1640 619010460 POLES-TREATED WOOD 5 IN EACH 41.00
1650 619011090 DELINEATOR TYPE 1 EACH 398.00
1660 619011095 DELINEATOR TYPE 2 EACH 15.00
1670 619011177 DELINEATOR-FLEX DRIVABLE WH EACH 8.00
1680 619011178 DELINEATOR-FLEX DRIVABLE YLW EACH 4.00
1690 620010301 CURB MARKING-YELLOW EPOXY GAL 3.00
1700 620011105 WORDS AND SYMBOLS-WHITE PAINT GAL 30.00
1710 620011110 WORDS AND SYMBOLS-YELLOW PAINT GAL 32.00
1720 620011260 WORDS AND SYMBOLS-WHITE EPOXY GAL 20.00
1730 620011265 WORDS AND SYMBOLS-YELLOW EPOXY GAL 22.00
1740 620012955 TEMPORARY STRIPING LNFT 26,844.00ADVERTISED COPY
SPECIAL PROVISIONS
CONTRACT NO. 03926
SECTION I – 7 –
SECTION: 0001 - GRADE,GRAVEL,PMS, DRAIN, & ROUNDABOUT
PROP LINE
NO.
ITEM
NUMBER
ITEM DESCRIPTION UNIT OF
MEASURE
QUANTITY
1750 620013000 STRIPING-WHITE PAINT GAL 502.00
1760 620013960 STRIPING-WHITE EPOXY GAL 335.00
1770 620014000 STRIPING-YELLOW PAINT GAL 376.00
1780 620014960 STRIPING-YELLOW EPOXY GAL 250.00
1790 622011022 SUBSURFACE DRAIN FILTER-HIGH SURV SQYD 334.00
1800 622011043 PERM EROSION CONTROL-HIGH SURV SQYD 51.00
1810 622011084 GEOTEXTILE STABILIZATION SQYD 37,569.00
1820 623000180 MAILBOX-LARGE EACH 131.00
1830 623000190 RESET MAILBOX EACH 3.00ADVERTISED COPY
SPECIAL PROVISIONS
CONTRACT NO. 03926
SECTION I – 8 –
TABLE OF CONTENTS
FEDERAL AID PROJECT(S) STPS-HSIP 203-1(16)4
1. PROJECT DESCRIPTION [102] ........................................................................................ 11
2. CONTRACT TIME – FLEX TIME PROCEED DATE [108] (REVISED 1-21-16) ................. 11
3. TRAFFIC CONTROL PLAN [618] (ADDED 8-6-2026) ....................................................... 12
4. MAINTENANCE OF TRAFFIC ........................................................................................... 12
5. SEQUENCE OF OPERATIONS (AMBROSE CREEK RD ROUNDABOUT DETOUR) ...... 12
6. SEQUENCE OF OPERATIONS (THREE MILE CREEK CULVERT – STA. 280+73) ......... 14
7. SEQUENCE OF OPERATIONS (CULVERT – STA. 304+89) ............................................ 15
8. SEQUENCE OF OPERATIONS (WILDLIFE CROSSING CULVERT – STA. 319+73) ....... 16
9. SEQUENCE OF OPERATIONS (DRY GULCH CREEK CULVERT – STA. 378+87) ......... 17
10. SEQUENCE OF OPERATIONS (CULVERT – STA. 414+51) ........................................ 18
11. SEQUENCE OF OPERATIONS (CULVERT – STA. 460+33) ........................................ 19
12. SEQUENCE OF OPERATIONS (CULVERT – STA. 505+86) ........................................ 21
13. CONTRACT DOCUMENTS [102] (REVISED 1-15-26)................................................... 22
14. LABOR AND CIVIL RIGHTS REQUIREMENTS [102] (REVISED 1-15-26) .................... 22
15. SOIL BORING INFORMATION [102] (REVISED 1-16-14) ............................................. 22
16. BIDDER’S PROPOSED AGGREGATE SOURCE(S) [103] (REVISED 8-07-25) ............ 23
17. ESCROW OF BID DOCUMENTS [103] (REVISED 4-28-22).......................................... 23
18. CONTRACTOR SURVEYING AND LAYOUT - DEPARTMENT STAKING [105]
(REVISED 6-06-24) ........................................................................................................ 23
19. PARTNERING [105] (ADDED 1-11-24 M) ...................................................................... 23
20. DOMESTIC MATERIALS REQUIREMENTS [106] (REVISED 11-13-25) ....................... 23
21. RAILROAD COORDINATION AND FLAGGING [107] (REVISED 04-25-24 M) .............. 25
22. STATUS OF UTILITIES [108] (ADDED 1-1-03) .............................................................. 25
23. SUBCONTRACTING CONSULTANTS [108] (REVISED 2-27-14 M).............................. 26
24. NOTICE TO BIDDERS [108] (ADDED 11-21-08) ........................................................... 26
25. TRAINING PROGRAM [109] (REVISED 3-19-26 M) ...................................................... 26
26. MOISTURE SENSITIVE SOILS [203] (REVISED 9-11-14) ............................................ 26
27. STORM WATER PERMITTING REQUIREMENTS UNDER THE MT POLLUTANT
DISCHARGE ELIMINATION SYSTEM (MPDES) [208] (REVISED 8-10-23) .................. 27
28. INCREASE IN TURBIDITY [208] (REVISED 10-8-15) .................................................... 29
29. NOISE IMPACT [208] (REVISED 5-24-12)..................................................................... 29
30. RIDE SPECIFICATION CATEGORY (SINGLE) [401] (REVISED 03-19-26) .................. 29
31. MONTANA FLOODPLAIN AND FLOODWAY MANAGEMENT ACT [208] (REVISED 9-9-
21M)............................................................................................................................... 29
32. ENVIRONMENTAL SPECIFICATIONS [208] ................................................................. 30ADVERTISED COPY
SPECIAL PROVISIONS
CONTRACT NO. 03926
SECTION I – 9 –
33. EAGLE CONSERVATION ............................................................................................. 30
34. STREAM PROTECTION ACT 124 [208]........................................................................ 30
35. CLEAN WATER ACT SECTION 404 PERMIT AND SECTION 401 CERTIFICATION ... 30
36. HIGH EFFICACY LUMINAIRE LED [617] (ADDED 4-03-25) ......................................... 33
37. REMOVE AND SALVAGE MISC ELECTRICAL ............................................................ 33
38. SERVICE CONNNECTIONS ......................................................................................... 34
39. TEMPORARY CHANNEL DIVERSION.......................................................................... 34
40. DEWATERING .............................................................................................................. 35
41. PROTECTION OF EXISTING IRRIGATION FACILITY – PARCEL 128 ......................... 35
42. PROTECTION AND RESTORATION OF PROPERTY AND LANDSCAPE ................... 35
43. CAP IMPACTED UNDERGROUND SPRINKLER SYSTEM .......................................... 36
44. DO NOT DISTURB CULTURALLY MODIFIED TREE (SCAR TREE) ............................ 36
45. SALVAGING OF FIRE HYDRANT ................................................................................. 36
46. TIMBER DECKING FOR PRIVATE LANDOWNERS ..................................................... 36
47. CULVERT FOUNDATION TREATMENT (REVISED 2-2-2022) ..................................... 39
48. RESET MAILBOX .......................................................................................................... 39
49. REMOVE FENCING ...................................................................................................... 40
50. TEMPORARY FENCE (PARCEL 11) ............................................................................ 40
51. GATE INSTALLATION (PARCEL 108) .......................................................................... 41
52. TEMPORARY FENCE (PARCEL 114)........................................................................... 41
53. DECORATIVE PORTLAND CEMENT CONCRETE PAVEMENT .................................. 41
54. DECORATIVE CONCRETE MEDIAN CAPS & ROUNDABOUT CLEAR ZONE AREA .. 42
55. ROUNDABOUT LANDSCAPING BLOCK RETAINING WALL ....................................... 43
56. ROUNDABOUT LANDSCAPING FEATURES ............................................................... 43
57. EXISTING CESSPOOL – PARCEL 5.1 ......................................................................... 44
58. ABANDON WELL .......................................................................................................... 44
59. SPECIAL INSTALLATION OF PIPE [603] (REVISED 10-8-15) ..................................... 44
60. VEGETATED CONCRETE BLOCK MAT....................................................................... 45
61. CULVERT INFILL REQUIREMENTS ............................................................................. 49
62. CULVERT INFILL THREEMILE CREEK REQUIREMENTS .......................................... 49
63. BIOENGINEERED BANK .............................................................................................. 50
64. DRAINAGE INSTALLATION RIGHT OF WAY LIMITATION .......................................... 51
65. EXTERNAL JOINT WRAP FOR REINFORCED CONCRETE ARCH PIPE ................... 51
66. DOUBLE JOINT SEAL FOR REINFORCED CONCRETE ARCH PIPE ......................... 52
67. CORRUGATED POLYETHYLENE APPROACH PIPE [603] (REVISED 12-12-19)........ 52ADVERTISED COPY
SPECIAL PROVISIONS
CONTRACT NO. 03926
SECTION I – 10 –
68. PRECAST REINFORCED BOX CULVERTS [603] (REVISED 2-18-16) ......................... 53
69. IRRIGATION OPERATOR CONTACT AND COORDINATION ...................................... 54
70. IRRIGATION PIPE REMOVAL ....................................................................................... 57
71. IRRIGATION SYSTEM FITTINGS.................................................................................. 57
72. PRESSURE IRRIGATION SYSTEM .............................................................................. 58
73. GRAVITY IRRIGATION SYSTEMS ................................................................................ 59
74. IRRIGATION ENCASEMENT PIPES ............................................................................. 61
75. SPLIT STEEL IRRIGATION ENCASEMENT PIPE ......................................................... 61
76. STEEL STRUCTURES [556] (ADDED 6-05-25) ............................................................. 62
77. LONG TERM VARIABLE MESSAGE BOARDS [618] (ADDED 3-09-23 M).................... 72
78. WIDE LOAD RESTRICTIONS [618] (ADDED 02-05-26 M) ............................................ 72
79. RSFO REMOVAL [619] (ADDED 8-06-2026) ................................................................. 73
80. MOTORCYCLE ADVISORY SIGNS [619] (REVISED 9-18-25) ...................................... 73
81. DETOURS — WETLAND REVEGETATION .................................................................. 74
82. SEEDING ....................................................................................................................... 75
SECTION II SECTION III
Nondiscrimination Notice Standard Provisions & Requirements
Permit Maps
Railroad Specials & Exhibits
Logs of BoringADVERTISED COPY
SPECIAL PROVISIONS
CONTRACT NO. 03926
SECTION I – 11 –
SPECIAL PROVISIONS
FEDERAL AID PROJECT NO(S). STPS-HSIP 203-1(16)4
(REVISED 6-25-26)
The following special provisions are hereby made part of the contract and supplement
and/or supersede any sections of the Standard Specifications of Road and Bridge Construction,
adopted by the Montana Department of Transportation and the Montana Transportation
Commission and all supplements thereto in conflict therewith.
The following documents are hereby incorporated by reference into this contract:
• “Question and Answer Forum”: Question and Answer Forum
• “Standard Specifications for Road and Bridge construction”:
Standard Specifications June 2026
• The most recent version of the Detailed Drawings: Detailed Drawings
• Materials Manual of Test Procedures: Materials Manual June 25, 2026
The latest version of the Standard Specifications, Biannual updates, and revision
summaries can be found at the following website: Standard Specifications
The Question-and-Answer Forum opens at 5:00 p.m. on the bid letting advertisement
date and closes at 8:00 a.m. on the Monday before the bid letting. If Monday is a state holiday,
the forum will close on Friday before the bid letting at 3:00 p.m. Answers provided by the
Department to the questions, clarifications, and notifications can be posted up to 5:00 p.m. on
the day before the letting.
The U.S. Department of Transportation (DOT) operates a toll-free number at
1-800-424-9071, 24 hours a day – 7 days a week. Anyone with knowledge of possible bid
rigging, bidder collusion, or other fraudulent activities should use this number to report such
activities. All information will be treated confidentially, and callers may remain anonymous.
The Department attempts to provide reasonable accommodations for any known
disability that may interfere with a person participating in any service, program, or activity of the
Department. Alternate accessible formats of this document will be provided upon request. If
reasonable accommodation is needed to participate in Department bid lettings, call the Civil
Rights Bureau at 444-6331 or TTY 406-444-7696 [TTY 1-800-335-7592 (toll free)].
1. PROJECT DESCRIPTION [102]
The North of Stevensville-North project is a reconstruction of roadway to include grading,
gravel, plant mix surfacing, curb & gutter, PCCP, drainage, irrigation, guardrail, centerline and
shoulder rumble strips, fencing, signing, delineation, lighting and striping on the North of
Stevensville – North project in Ravalli County. The roadway will be widened to allow for wider
shoulders, a center two-way left turn lane and mailbox turnouts. A 4-legged roundabout will be
included at the Ambrose Creek Road/Moiese Lane intersection with S-203.
The project begins at RP 4.0 on S-203 (Eastside Highway), about four miles north of
Stevensville (350 feet south of Moiese/Wildfowl Lane), and extends northerly 6.0 miles to RP
10.1, about 300 feet north of Huckleberry Lane (about 0.3 miles south of the Eight Mile Creek
Road roundabout). This project is in Ravalli County.
2. CONTRACT TIME – FLEX TIME PROCEED DATE [108] (REVISED 1-21-16)
A. General. This provision modifies Subsection 108.02 of the Specifications.
B. Notice to Proceed. The notice to proceed will be issued with an effective date of
November 16, 2026. The Contractor may change the notice to proceed date to an earlier date if
written notification is received at least ten calendar days in advance of the date selected and the
selected date is approved by the Project Manager. Include an updated schedule with the
notification.ADVERTISED COPY
SPECIAL PROVISIONS
CONTRACT NO. 03926
SECTION I – 12 –
C. Contract Time. Contract time assessment will begin on the notice to proceed
date issued by the Department or as changed by the Contractor, whichever is earlier. Work is
to be completed in 235 working days.
3. TRAFFIC CONTROL PLAN [618] (ADDED 8-6-2026)
A. Provide a traffic control plan and written narrative meeting the requirements of
the contract and 618. Submit detailed traffic control plans on aerial overlays. Specifically,
address any contract-specific sequence of operations.
B. Method of Measurement. Traffic control plans are measured by Lump Sum. All
work associated with creating, submitting, correcting, updating and meeting the contract’s
requirements is considered incidental to the item.
C. Basis of Payment. Partial payments for the Traffic Control Plan will be based on
the lump sum contract price at the rates listed below.
Progress estimate payment Percent of lump sum item
First partial payment after start of contract
work 80
Estimate paying 60% of original contract
amount 20
4. MAINTENANCE OF TRAFFIC
In addition to the requirements of Subsection 104.05, Maintenance of Work, and
Subsection 108.04, Limitations of Operations, schedule operations to provide the least amount
of inconvenience possible to the traveling public and adjacent property owners.
A. Maintain access to and from the premises of the adjacent property owners at all
times. Provide a smooth transition for turning in and out of approaches.
B. Adequately provide for the travel of emergency services vehicles at all times
during emergencies.
C. Maintain a minimum of one-lane alternating traffic throughout construction. The
maximum continuous length allowed for one-lane alternating traffic is two miles. In the case two
miles of single lane traffic causes an accumulative delay of 20 minutes or greater, a reduced
length in single lane traffic will be required. Do not allow the travel time from the beginning of the
project to the end of the project to exceed 30 minutes. Coordinate with the local schools so
single lane traffic does not delay bus routes.
Restore traffic to normal traffic flow when practicable. Normal traffic flow is defined as
two through lanes (one in each direction) with two-way traffic flow unimpeded by traffic control
devices, reduced widths, or flagging.
D. Road closures will not be allowed on S-203. Provide at least one 12-foot-wide
traffic lane throughout construction.
E. All traffic control entailed by this special provision, and other specials included in
the contract will be measured and paid for at the unit quantities and prices bid for the respective
items of the contract.
5. SEQUENCE OF OPERATIONS (AMBROSE CREEK RD ROUNDABOUT DETOUR)
A. Description. This work is the sequencing and phasing of construction operations
and alternate detour routes to complete roundabout and approach legs in accordance with the
construction and timing requirements, and as outlined in the Sequence of Operations special
provision.
B. Materials. VacantADVERTISED COPY
SPECIAL PROVISIONS
CONTRACT NO. 03926
SECTION I – 13 –
C. Construction Requirements. Sequence the construction operations in
accordance with the following phase requirements. Alternate sequencing and detour routes
may be allowed at the discretion of the Project Manager and Ravalli County Commissioners.
Construct the roundabout and approach legs as outlined in the plans and special
provisions, and in accordance with Section 202 of the Standard Specifications.
1) Install a temporary culvert across the existing irrigation channel under the detour
as outlined in the plans. Construct a new 2-lane detour northwest of the existing roadway and
Ambrose Creek Road intersection, outside the footprint of the new roundabout and north and
west approach legs, following the detour alignment as outlined in the plans, in accordance with
Section 206 of the Standard Specifications.
2) Install traffic control in accordance with Section 618, Detailed Drawings, the
plans, the MUTCD, and this special provision, on detour/alternate routes for Ambrose Creek
Road and Moiese Lane. Ambrose Creek Road and Moiese Lane’s access onto S-203 can be
closed for a maximum of 2 months while the roundabout and approach legs are constructed.
Prior to signing detour/alternate routes for Ambrose Creek Road, apply aggregate treatment
(magnesium chloride) to Tripp Lane to the full gravel roadway width between 3 Mile Creek Road
and Ambrose Creek Road. Apply additional applications of magnesium chloride to Tripp Lane
during the duration of the detour route, as needed to control dust pollution, at the discretion of
the Project Manager and Ravalli County Public Works Director. The following detour/alternate
routes are proposed:
a) Ambrose Creek Road.
(1) Alternate/Detour route south of Ambrose Creek Road.
(a) Detour traffic heading east onto Stevensville Airport Road, next heading north
onto Illinois Bench Road, until you reach Ambrose Creek Road (approx. detour length = 4.4
miles).
(2) Alternate/Detour route north of Ambrose Creek Road.
(a) Detour traffic heading east onto 3 Mile Creek Road, next heading south onto
Tripp Lane, until you reach Ambrose Creek Road (approx. detour length = 1.5 miles).
b) Moiese Lane.
(1) Alternate/Detour Route
(a) Detour traffic heading east onto southern Moiese Lane access (approx. detour
length = 1.0 miles).
3) Divert S-203 traffic onto the new 2-lane detour.
4) Construct all irrigation and drainage features within the roundabout and approach
legs, and construct the roundabout, the north, south, west and east approach legs and all other
items included herein.
5) Divert traffic to the newly constructed roundabout and approach legs.
6) Remove the detour and temporary detour culvert in accordance with Section 206
of the Standard Specifications. Perform detour revegetation following the requirements in
special provision “Detours - Wetland Revegetation”.
a) Remove traffic control on detour/alternate routes for Ambrose Creek Road and
Moiese Lane.
(1) Perform pavement repairs to existing asphalt County roads that were
damaged/rutted/potholed while being used as detour/alternate routes during construction,
including Stevensville Airport Road, Illinois Bench Road, Ambrose Creek Road (outside
approach reconstruct area adjacent to S-203), and 3 Mile Creek Road, at the discretion of the
Project Manager and Ravalli County Public Works Director.
Upon completion of roundabout and approach legs, complete all remaining construction
activities. Single lane closures are allowed during this work.
Upon completion of all work, remove temporary traffic modifications on S-203 and
restore traffic to normal traffic flow.ADVERTISED COPY
SPECIAL PROVISIONS
CONTRACT NO. 03926
SECTION I – 14 –
D. Method of Measurement and Basis of Payment. The sequence of operations is
not measured for payment; it is included in the cost of other items. Payment for aggregate
treatment and any repairs needed to the detour routes will be made in accordance with
Subsection 109.04.
6. SEQUENCE OF OPERATIONS (THREE MILE CREEK CULVERT – STA. 280+73)
A. Description. This work is the sequencing and phasing of construction operations
to complete the culvert replacement at Three Mile Creek (station 280+73) in accordance with
the construction and timing requirements and following the requirements in special provision
“Sequence of Operations”.
B. Materials. Vacant
C. Construction Requirements. Sequence the construction operations in
accordance with the following phase requirements. Alternate sequencing may be allowed at the
discretion of the Project Manager.
Dewatering measures may be needed to maintain the water level below the bottom of
excavation elevation. Perform dewatering measures following the requirements in special
provision “Dewatering”.
Construct the culvert removals and replacement as outlined in the plans and special
provisions, and in accordance with Section 202 of the Standard Specifications.
1) Temporarily divert Three Mile Creek through the existing 54” corrugated metal
pipe (CMP) overflow culvert at station 281+13 (northerly culvert), by bypass pumping under the
highway, following the requirements in special provision “Temporary Channel Diversion”. Install
temporary culvert extensions on the inlet and outlet ends to accommodate the detour grading
slopes, as outlined in the plans.
2) Shift all traffic (single lane alternating two-way traffic) to the southbound (SB)
lanes. Place temporary barrier rail and temporary impact attenuators centered near existing
PTW.
3) Remove a portion of the inlet of the existing 85” x 131” structural steel plate pipe
arch (SSPPA) culvert (southerly culvert) at station 280+75, to the extent necessary to construct
the Phase 1 detour.
4) Phase 1 (Culvert Outlet Construction)
a) Construct Phase 1 detour across the inlet (project right) side of the southerly
culvert following the detour alignment as outlined in the plans, in accordance with Section 206 of
the Standard Specifications. Place temporary barrier rail and temporary impact attenuators on
the left side of phase 1 detour.
b) Divert single lane alternating traffic to the phase 1 detour.
c) Remove the remainer of the existing southerly culvert (outlet/project left side).
d) Construct the outlet half of the new 18’ x 11’ reinforced concrete box (RCB)
culvert.
5) Phase 2 (Culvert Inlet Construction)
a) Construct Phase 2 detour over top of the outlet side of the new RCB culvert
following the detour alignment as outlined in the plans, in accordance with Section 206 of the
Standard Specifications.
b) Place temporary barrier rail and temporary impact attenuators on the left and
right sides of phase 2 detour. Divert single lane alternating traffic to the phase 2 detour.
c) Install the inlet (project right) remaining half of new RCB culvert.
6) Construct concrete sills at each culvert end as outlined in the plans. Place culvert
infill inside the new RCB culvert following the requirements in special provision “Culvert In-Fill &
Aquatic Organism Passage Requirements”, and as outlined in the plans.
7) Construct new bioengineered bank on the inlet and outlet of Three Mile Creek
following the requirements in special provision “Bioengineered Bank”, and as outlined in the
plans.ADVERTISED COPY
SPECIAL PROVISIONS
CONTRACT NO. 03926
SECTION I – 15 –
8) Restore Three Mile Creek to flow into the new/existing inlet and outlet channels
and through the new RCB culvert following the requirements in special provision “Temporary
Channel Diversion” and satisfying all requirements of section 208.03.3.
9) With single lane alternating traffic remaining in the Phase 2 detour, remove the
inlet (project right) half of the existing northerly culvert, and remove the temporary culvert
extension on the inlet end, and backfill the void with embankment.
10) Reconstruct the roadway in the northbound (NB) lane across both culvert
sections.
11) Divert single lane alternating traffic to the reconstructed NB lane.
12) Remove the outlet (project left) remaining half of the existing northerly culvert,
and remove the temporary culvert extension on the outlet end, and backfill the void with
embankment.
13) Reconstruct the roadway in the SB lane across both culvert sections.
14) Remove the detours and perform detour revegetation as needed (only if outside
the footprint of proposed mainline reconstruction) in accordance with Section 206 of the
Standard Specifications and following the requirements in special provision “Detours - Wetland
Revegetation”. Any detour embankment that’s to remain in place in its final position must meet
standard embankment requirements in accordance with Section 203.
15) Upon completion of culvert replacement and removals, complete all remaining
construction activities across the Three Mile Creek area. Single lane closures are allowed
during this work.
16) Upon completion of all work, remove temporary traffic modifications and restore
traffic to normal traffic flow.
D. Method of Measurement and Basis of Payment. The sequence of operations is
considered incidental to the project and is not measured for payment. The sequence of
operations is included in the cost of other items.
7. SEQUENCE OF OPERATIONS (CULVERT – STA. 304+89)
A. Description. This work is the sequencing and phasing of construction operations
to complete the culvert replacement north of Mountain Springs Road (new culvert at station
304+89) in accordance with the construction and timing requirements and following the
requirements in special provision “Sequence of Operations”.
B. Materials. Vacant
C. Construction Requirements. Sequence the construction operations in
accordance with the following phase requirements. Alternate sequencing may be allowed at the
discretion of the Project Manager.
Dewatering measures may be needed to maintain the water level below the bottom of
excavation elevation. Perform dewatering measures following the requirements in special
provision “Dewatering”.
Construct the culvert removal and replacement as outlined in the plans and special
provisions, and in accordance with Section 202 of the Standard Specifications.
1) Use the existing 36” CMP culvert at station 305+18 to convey all drainage while
the new culvert is being installed, by bypass pumping under the highway, following the
requirements in special provision “Temporary Channel Diversion”. Install a temporary culvert
extension on the inlet end to accommodate the detour roadway and grading slopes, as outlined
in the plans.
2) Phase 1 (Culvert Inlet Construction)
a) Shift all traffic (single lane alternating two-way traffic) to the SB lanes on existing
PTW. Place temporary barrier rail and temporary impact attenuators centered near existing
PTW project right.
b) Construct the inlet (project right) half of new 96” corrugated steel pipe (CSP)
culvert.ADVERTISED COPY
SPECIAL PROVISIONS
CONTRACT NO. 03926
SECTION I – 16 –
3) Phase 2 (Culvert Outlet Construction)
a) Construct Phase 2 detour over top of the inlet (project right) side of the new
culvert following the detour alignment as outlined in the plans, in accordance with Section 206 of
the Standard Specifications. Place temporary barrier rail and temporary impact attenuators on
the left side of phase 2 detour.
b) Divert single lane alternating traffic to the phase 2 detour.
c) Construct the outlet remaining half of the new CSP culvert.
d) Place culvert infill inside the new culvert following the requirements in special
provision “Culvert Infill Requirements”, and as outlined in the plans.
e) Restore drainage to flow into the existing inlet and outlet channels and through
the new culvert following the requirements in special provision “Temporary Channel Diversion”,
and satisfying all requirements of section 208.03.3.
f) Remove the outlet (project left) half of the existing culvert at station 305+18 and
backfill the void with embankment.
g) Reconstruct the roadway in the SB lanes across the culvert.
4) Divert single lane alternating traffic to the reconstructed SB lanes.
a) Remove the inlet (project right) remaining half of the existing culvert at station
305+18 and remove the temporary culvert extension on the inlet end and backfill the void with
embankment.
b) Reconstruct the roadway in the NB lanes across the culvert.
5) Remove the detours and perform detour revegetation as needed (only if outside
the footprint of proposed mainline reconstruction) in accordance with Section 206 of the
Standard Specifications and following the requirements in special provision “Detours - Wetland
Revegetation”. Any detour embankment that’s to remain in place in its final position must meet
standard embankment requirements in accordance with Section 203.
6) Upon completion of culvert replacement, complete all remaining construction
activities across the culvert area. Single lane closures are al
- Package Files
- Name
- 101_NORTH_OF_STEVENSVILLE-NORTH/6138000ADV_EROSION_CONTROL_PLANS.pdf
- Bytes
- 8810811
- Name
- 101_NORTH_OF_STEVENSVILLE-NORTH/6138000ADV_PLANS.pdf
- Bytes
- 87080927
- Name
- 101_NORTH_OF_STEVENSVILLE-NORTH/6138000ADV_PROPOSAL.pdf
- Bytes
- 21221339
- Name
- 101_NORTH_OF_STEVENSVILLE-NORTH/6138000ADV_X-SECTIONS.pdf
- Bytes
- 93279261
- Name
- 101_NORTH_OF_STEVENSVILLE-NORTH/6138000SN_DESIGN_CALCS.pdf
- Bytes
- 2361820
- Package Pages
- 167
- Categorized By
- llm
- Package Scope Docs
- 1
- Package Manifest Only
- No